566 Greene Ave
Bedford-Stuyvesant, Brooklyn, NY 11216
566 Greene Avenue is a walk-up building with 12 apartments, built in 1931. It has 17 open violations, 9 of them Class C, immediately hazardous. The oldest open HPD violation was filed on August 17, 2016.
En español: 9 violaciones de Clase C abiertas (peligro inmediato) y 17 abiertas en total. La más antigua del HPD lleva 10 años abierta, desde el 17 de agosto de 2016.
Open now, most hazardous first
- 9Get these certified
Class C, immediately hazardous, filed in the last 3 years
- 8See the 8
Class B, hazardous, filed in the last 3 years. Most often Mold.
7.5 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. 4 certifications filed and 2 new Class C in the last 180 days, too few to call a direction.
Since November 27, 2023, certifications were filed on 6 Class C violations, all 6 by the original certify-by date. HPD now marks 2 of them False Certification and 1 Invalid Certification. How certification works
The original certify-by dates on the 17 open HPD violations have all passed. The latest was October 12, 2026.
- Zoning district
- R6B
- Lot area
- 3,000 sq ft
- Floor area
- 12,000 sq ft
- Tax lot (BBL)
- 3-01799-0009
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 9 open | ||
| Notice sent | 19146543 | ||
| § 27-2005 ADM CODE Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom | |||
| Vermin / Infestation | Notice sent to tenant | 19146540 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | |||
| Heat / Hot Water | Invalid certification | 17678520 | |
| § 27-2033 ADM CODE Provide ready access to buildings heating system door locked at boiler room | |||
| Heat / Hot Water | Notice sent | 17678517 | |
| § 27-2029 ADM CODE Provide an adequate supply of heat for the apartment in the entire apartment | |||
| Notice sent | 17077153 | ||
| § 27-2026, 2027 HMC: Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from north | |||
| Notice sent | 17074100 | ||
| § 27-2026, 2027 HMC: Properly repair the source and abate the evidence of a water leak at the ceiling and north wall in the bathroom | |||
| Notice sent | 17074098 | ||
| § 27-2026, 2027 HMC: Properly repair the source and abate the evidence of a water leak at the ceiling and south wall in the kitchen | |||
| Vermin / Infestation | False certification | 16624827 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | |||
| False certification | 16624826 | ||
| § 27-2043.1 HMC Install the missing or repair/replace the defective window guard(S) in accordance with the specifications of the new york city health code section 24 RCNY chapter 12. Wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment | |||
| In HPD's words. Apartment numbers are left out. | |||
| Class B | 8 open most often Mold | ||
| Notice sent | 19146542 | ||
| Mold | No access to reinspect (first try) | 17384012 | |
| Mold | No access to reinspect (first try) | 17384011 | |
| Notice sent | 17077154 | ||
| Notice sent | 17077150 | ||
| Notice sent | 17077149 | ||
| Notice sent | 17074101 | ||
| Notice sent | 17074099 | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 11 on September 24, 2026 and 9 on November 15.
- HPD, by year
- From 2017 to 2026, HPD filed 129 violations and closed 91, all classes.
Year Filed Closed 2026 8 5 2025 4 2 2024 15 3 2023 2 5 2022 18 2 2021 30 11 2020 5 12 2019 23 45 2018 15 1 2017 9 5 - Bedbug report
- Filed December 5, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- HPD emergency repair order
- 1 completed HPD emergency repair order since November 27, 2023: a general construction order, opened May 14, 2026, awarded for $289. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
DOB records
- DOB violations
- 5 active DOB violations. The newest was issued August 10, 2016.
- DOB, all years
- 7 DOB complaints from 2016 through November 25, 2026. 6 DOB violations since 1997, 1 dismissed in DOB's records.
- Boiler inspection
- Inspected April 22, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Hearings and penalties
- Housing court
- 3 housing court cases here since 2017, most of them heat and hot water cases. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
The building report
- The city's wording on the 8 other open violations this page lists without it.
- What each of the 5 city statuses here means, and how many of these carry it.
- How it compares with the 19,359 Brooklyn buildings with 6 to 19 apartments.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.