Skip to content
ViolationScout11 open Class C, with 4 certifications filed and 4 new Class C in the last 180 days, too few to call a direction.Is this your building?
Buildings566 Greene Avenue, BrooklynCurrent through

566 Greene Ave, Brooklyn

BBL 3-01799-0009

En español: 11 violaciones de Clase C abiertas (peligro inmediato) y 20 abiertas en total.

Open violations are sitting, with little movement either way. 11 open Class C, with 4 certifications filed and 4 new Class C in the last 180 days, too few to call a direction.

Since September 28, 2023, certifications were filed on 6 Class C violations, all 6 by the original certify-by date. HPD now marks 2 of them False Certification and 1 Invalid Certification. How certification works

Is this your building?

11 open Class C.

We read every request ourselves. When a compliance firm we work with can take the building, we introduce you to that one firm. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: which violations matter, and how long this kind usually takes to clear. It is not on sale yet.

See what the report covers

HPD takes complaints from tenants through 311.

DOB violations
5 active DOB violations, most of them for boiler filings under Local Law 62/91. The newest was issued August 10, 2016.
Rent stabilization
Has rent-stabilized apartments (2024 registration).
HPD emergency repair order
1 completed HPD emergency repair order since September 28, 2023: a general construction order, opened May 14, 2026, awarded for $289.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C11 open
Heat / Hot WaterCIV14 mailed19146545LARRY LLC
CIV14 mailed19146544LARRY LLC
Notice sent19146543LARRY LLC
Vermin / InfestationNotice sent to tenant19146540LARRY LLC
Heat / Hot WaterInvalid certification17678520
Notice sent17678517
Notice sent17077153
Notice sent17074100
Notice sent17074098
Vermin / InfestationFalse certification16624827
False certification16624826
Class B9 open most often Mold
Notice sent19146542LARRY LLC
CIV14 mailed19146541LARRY LLC
MoldNo access to reinspect (first try)17384012
MoldNo access to reinspect (first try)17384011
Notice sent17077154
Notice sent17077150
Notice sent17077149
Notice sent17074101
Notice sent17074099

Nearby buildings

Questions about this building

Does 566 Greene Avenue, Brooklyn have open violations?

Yes. 566 Greene Avenue, Brooklyn had 20 open violations on September 26, 2026: 20 from HPD. 11 are Class C, the class HPD treats as immediately hazardous.

Is 566 Greene Avenue, Brooklyn getting better or worse?

Open violations are sitting, with little movement either way. 11 open Class C, with 4 certifications filed and 4 new Class C in the last 180 days, too few to call a direction. That window ends September 26, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 566 Greene Avenue, Brooklyn?

Since September 28, 2023, certifications were filed on 6 Class C violations, all 6 by the original certify-by date. HPD now marks 2 of them False Certification and 1 Invalid Certification. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 566 Greene Avenue, Brooklyn have active DOB violations?

Yes. 5 active DOB violations, most of them for boiler filings under Local Law 62/91. The newest was issued August 10, 2016. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Are any HPD emergency repair orders at 566 Greene Avenue, Brooklyn marked completed?

Yes. 1 completed HPD emergency repair order since September 28, 2023: a general construction order, opened May 14, 2026, awarded for $289. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

Is 566 Greene Avenue, Brooklyn rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 566 Greene Avenue, Brooklyn built?

The city's record gives 1931 as the year 566 Greene Avenue, Brooklyn was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a walk-up apartment building with 4 floors.

How many apartments does 566 Greene Avenue, Brooklyn have?

The Department of City Planning's PLUTO tax-lot file lists 12 residential units at 566 Greene Avenue, Brooklyn. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on DOB violations, the Rent Guidelines Board's stabilized-building lists, HPD emergency repair orders and the city's PLUTO tax-lot file. This page is current through September 26, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus DOB violations, the Rent Guidelines Board's stabilized-building lists, HPD emergency repair orders and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 566 Greene Ave, Brooklyn: 11 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 26, 2026. https://violationscout.com/building/566-greene-avenue-brooklyn

How we count: /method.

Is this your building?