Skip to content
ViolationScout14 open Class C, with nothing filed or new in the last 180 days.Your building
Buildings730 Avenue U, BrooklynCurrent through

730 Avenue U

Brooklyn, NY 11223

730 Avenue U is a building with stores or offices and 4 apartments, built in 1931. It has 22 open violations, 14 of them Class C, immediately hazardous. The oldest open HPD violation was filed on October 13, 1989.

En español: 14 violaciones de Clase C abiertas (peligro inmediato) y 22 abiertas en total. La más antigua del HPD lleva 37 años abierta, desde el 13 de octubre de 1989.

Open now, most hazardous first

  1. 14

    Class C, immediately hazardous, filed in the last 3 years. Most often Heat / Hot Water.

    19 open counting every year, the oldest since

    Get these certified
  2. 6

    Class B, hazardous, filed in the last 3 years. Most often Fire Safety.

    See the 6
  3. 2

    OATH/ECB summonses still active

    See the 2

35.0 open Class C per 10 apartments. Across the city: 0.7.

Open violations are sitting, with little movement either way. No certification filed and no new Class C violation in the last 180 days.

Since November 27, 2023, certifications were filed on 4 Class C violations: 1 by the original certify-by date, 3 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works

The original certify-by dates on the 20 open HPD violations have all passed. The latest was November 24, 2025.

Zoning district
R6A
Lot area
2,000 sq ft
Floor area
5,600 sq ft
Last sale
$1,648,400
Tax lot (BBL)
3-07134-0012
Neighborhood
Gravesend-Homecrest

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumber
Class C14 open most often Heat / Hot Water
Heat / Hot WaterCertified late18341349
§ 27-2028, 2032 ADM CODE Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the 3rd room from north at west
Fire SafetyCertified late18341348
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges in the entrance
Heat / Hot WaterCertified late18341346
§ 27-2028, 2032 ADM CODE Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment
Heat / Hot WaterNotice sent18131658
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Fire SafetyNotice sent18131657
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance
Fire SafetyNotice sent17847388
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges in the entrance
Heat / Hot WaterNotice sent17847387
§ 27-2033 ADM CODE Provide ready access to buildings heating system door locked at basement at boiler room
Heat / Hot WaterNotice sent17847386
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Fire SafetyNotice sent17822116
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges in the entrance
Heat / Hot WaterNotice sent17822115
§ 27-2029 ADM CODE Provide an adequate supply of heat for the apartment in the entire apartment
Heat / Hot WaterNotice sent17822114
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Notice sent17520073
§ 27-2005 ADM CODE Properly secure the loose all risers and all treads at staircase leading to the second floor at public hall stairs, 1st story
Notice sent17520066
§ 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of key operated lock at bulkhead entrance, leading to the roof. At 1st public hall bulkhead from north at west, 3rd story
Notice sent17472799
§ 27-2005 ADM CODE Properly secure the loose 1st,2nd, and 3rd wood tread and kick plates from bottom up at public hall, 1st story
In HPD's words. Apartment numbers are left out.
Class B6 open most often Fire Safety
Notice sent18131659
Fire SafetyNotice sent18131656
Fire SafetyNotice sent18131655
Fire SafetyNotice sent17822118
Fire SafetyNotice sent17822117
Notice sent17472794
OATH/ECB2 open
Construction, Class 1Decided by default39185198L
Boilers, Class 2Decided by default39156835M
Is this your building?Also for tenants and buyers
Is this your building?

We read every request ourselves. If we know a firm that handles this kind of work, we'll tell you who, and we only share your details if you say yes.

Your details stay with us. We share them with a firm only if you say yes. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See what's in the report first

Or file it yourself: what it can hold up, and how correction is filed

The building report reads this record for you: the city's wording on each open Class B violation filed in the last 3 years, what each status means, and how the building compares with others its size.

See what's in the report

HPD takes complaints from tenants through 311.

JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix

For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it

HPD and other city records

Open Class C, week by week
14 on September 24, 2026 and 14 on November 15.
HPD, by year
From 2017 to 2026, HPD filed 94 violations and closed 52, all classes.
YearFiledClosed
202614
2025202
20241228
202326
202230
202110
2020255
2019283
201810
201714
Bedbug report
Filed October 14, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
HPD emergency repair order
1 completed HPD emergency repair order since November 27, 2023: a general construction order, opened July 21, 2025, awarded for $200. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.

Hearings and penalties

OATH/ECB summonses
4 DOB summonses here since January 1, 2019, with $25,000 in penalties imposed. 2 of them are still active, the same 2 listed under OATH/ECB. 2 judgments docketed, the latest on September 30, 2026. A docketed judgment shows up in a title search.
  • April 20, 2026, DOB: Electrical work without a permit. Decided by default, $6,250 penalty imposed.
  • April 20, 2026, DOB: Miscellaneous violations. Decided by default, $12,500 penalty imposed.
  • August 12, 2025, DOB: Failure to maintain building in code-compliant manner: Boiler. Decided by default, $6,250 penalty imposed.

The newest 3 of 4 summonses OATH lists here.

How a default is vacated

Housing court
1 housing court case here, opened in 2014. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.

DOB records

DOB violations
33 active DOB violations. The newest was issued September 23, 2024.
DOB complaints
2 DOB complaints in the last 12 months. The newest was filed November 23, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
DOB, all years
9 DOB complaints from 2005 through November 25, 2026. 33 DOB violations since 1988.
DOB permits
1 DOB work permit in effect, for General Construction work, issued April 14, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
  • General Construction, issued April 14, 2026, in effect until December 23, 2026.
  • Sidewalk Shed, issued December 15, 2025, signed off.

The building report

The cover of the sample report, a real Brooklyn building with apartment numbers removed.Page 3 of the sample report, What is open, for the same building.

Get the report, $19 See a sample report

You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Nearby buildings

Questions about this building

Does 730 Avenue U have open violations?

Yes. It had 22 open violations on November 25, 2026: 2 from OATH/ECB and 20 from HPD. 14 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 37 years, since October 13, 1989.

Is this building getting better or worse?

Open violations are sitting, with little movement either way. 14 open Class C, with nothing filed or new in the last 180 days. The 180 days run to November 25, 2026.

Everything on this page comes from the city records listed below. A violation closed after the date at the top may still show as open here. If something is wrong, ask for a correction.

Sources. HPD housing violations and OATH/ECB hearing results, plus the neighborhood from HPD and DOB records, OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, DOB NOW work permits, HPD emergency repair orders, HPD's annual bedbug reports, the city's PLUTO tax-lot file and DOF's property sales records. Open violation counts cover the last 3 years: HPD Class B and C violations still open, and OATH/ECB summonses still active. The city's own pages can show more.

Cite this page

ViolationScout, 730 Avenue U, Brooklyn: 4 units, 14 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through November 25, 2026. https://violationscout.com/building/730-avenue-u-brooklyn

How we count: /method.

Is this your building?