75 West 118th St
Manhattan, NY 10026
75 West 118th Street is a walk-up building with 8 apartments, built in 1909. It has 8 open violations, 7 of them Class C, immediately hazardous. The oldest open HPD violation was filed on November 1, 2016.
En español: 7 violaciones de Clase C abiertas (peligro inmediato) y 8 abiertas en total. La más antigua del HPD lleva 10 años abierta, desde el 1 de noviembre de 2016.
Open now, most hazardous first
- 7Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Fire Safety.
- 1See it
Class B, hazardous, filed in the last 3 years
8.8 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. No certification filed and no new Class C violation in the last 180 days.
Since November 27, 2023, certifications were filed on 14 Class C violations: 8 by the original certify-by date, 6 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works
The original certify-by dates on the 8 open HPD violations have all passed. The latest was November 2, 2025.
- Zoning district
- R7-2
- Lot area
- 2,018 sq ft
- Floor area
- 5,200 sq ft
- Last transfer
- No price recorded
- Last sale
- $1,350,000
- Tax lot (BBL)
- 1-01717-0008
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 7 open most often Fire Safety | ||
| Fire Safety | Certified late | 18300093 | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges at buidling entrance door | |||
| Fire Safety | Certified late | 18300077 | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges in the entrance | |||
| Vermin / Infestation | Invalid certification | 18139031 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | |||
| Vermin / Infestation | Invalid certification | 18139026 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | |||
| Fire Safety | Certified late | 17610930 | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges in the entrance | |||
| Heat / Hot Water | Certified late | 17610929 | |
| § 27-2033 ADM CODE Provide ready access to buildings heating system boiler room door locked at boiler room | |||
| Heat / Hot Water | Certified late | 17610928 | |
| § 27-2029 ADM CODE Provide an adequate supply of heat for the apartment in the entire apartment | |||
| In HPD's words. Apartment numbers are left out. | |||
| Class B | 1 open | ||
| Mold | Defect letter sent | 18063513 | |
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2017 to 2026, HPD filed 84 violations and closed 45, all classes.
Year Filed Closed 2026 0 1 2025 24 18 2024 3 0 2022 11 8 2021 2 0 2020 12 1 2019 11 4 2018 10 12 2017 11 1 - Bedbug report
- Filed December 17, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- HPD emergency repair order
- 1 completed HPD emergency repair order since November 27, 2023: an electrical order, opened January 30, 2025, awarded for $1,995. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- Housing court
- 5 housing court cases here since 2016. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB, all years
- 3 DOB complaints from 2007 through November 25, 2026. 6 DOB violations since 1994, 6 dismissed in DOB's records.
- Certificate of occupancy
- DOB issued a final certificate of occupancy on July 9, 2015.
The building report
- The city's wording on the 1 other open violation this page lists without it.
- What each of the 3 city statuses here means, and how many of these carry it.
- How it compares with the 11,097 Manhattan buildings with 6 to 19 apartments.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.