8855 Bay Pkwy
Brooklyn, NY 11214
8855 Bay Parkway is an elevator building with 164 apartments, built in 1958. It has 5 open violations, 3 of them Class C, immediately hazardous. The oldest open HPD violation was filed on September 16, 2026.
En español: 3 violaciones de Clase C abiertas (peligro inmediato) y 5 abiertas en total. La más antigua del HPD lleva 2 meses abierta, desde el 16 de septiembre de 2026.
Open now, most hazardous first
- 3Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Lead Paint.
- 1See it
Class B, hazardous, filed in the last 3 years
- 1See it
OATH/ECB summons still active
0.2 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. 4 certifications filed and 3 new Class C in the last 180 days, too few to call a direction.
Since November 27, 2023, certifications were filed on 16 Class C violations, all 16 by the original certify-by date. How certification works
The original certify-by dates on the 4 open HPD violations run from October 14, 2026 to December 23, 2026.
- Zoning district
- R6
- Lot area
- 18,970 sq ft
- Floor area
- 134,280 sq ft
- Tax lot (BBL)
- 3-06471-0090
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 3 open most often Lead Paint | |||
| Lead Paint | Postponement granted | 19356217 | FONTAINEBLEAU TOWERS DEL LLC | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5MG/CM2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 RCNY §11-07(B)) using work practices set forth in 28 RCNY §11-06(B)(2). 1st radiator from north at east wall, north wall, east wall in the 1st room from north at east | ||||
| Lead Paint | Postponement granted | 19356216 | FONTAINEBLEAU TOWERS DEL LLC | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) west wall in the 1st room from north at east | ||||
| Fire Safety | Not complied with | 19223308 | FONTAINEBLEAU TOWERS DEL LLC | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges at building entrance door at public hall, 1st story | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 1 open | |||
| Notice sent | 19347706 | FONTAINEBLEAU TOWERS DEL LLC | ||
| OATH/ECB | 1 open | |||
| Elevators, Class 2 | Hearing pending | 39203827L | FONTAINEBLEAU TOWERS DEL LLC | |
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2017 to 2026, HPD filed 145 violations and closed 150, all classes.
Year Filed Closed 2026 10 3 2025 13 33 2024 38 31 2023 22 16 2022 0 2 2021 16 23 2020 21 13 2019 12 17 2018 1 1 2017 12 11 - Energy benchmarking
- ENERGY STAR score 95 for 2025, against a median of 69 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed December 25, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- HPD emergency repair order
- 1 completed HPD emergency repair order since November 27, 2023: a general construction order, opened February 6, 2024, awarded for $1,340. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- OATH hearings
- A hearing on a DOB summons is set for November 25, 2026.
- OATH/ECB summonses
- 17 DOB summonses here since January 1, 2019, with $40,059 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 6 judgments docketed, the latest on July 31, 2023. A docketed judgment shows up in a title search.
- September 11, 2026, DOB: Failure to maintain elevator or conveying system. $625 penalty imposed.
- June 14, 2023, DOB: Failure to maintain elevator or conveying system. Admitted, $625 penalty imposed.
- June 14, 2023, DOB: Failure to maintain elevator or conveying system. Admitted, $625 penalty imposed.
The newest 3 of 17 summonses OATH lists here.
- Housing court
- 4 housing court cases here since 2007. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB complaints
- 2 DOB complaints in the last 12 months. The newest was filed October 18, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 44 DOB complaints from 2003 through November 25, 2026. 37 DOB violations since 1990, 24 resolved and 13 dismissed in DOB's records.
- DOB facade
- Rated Safe in the latest facade report, filed February 17, 2024 (inspection cycle 9). Reports in earlier inspection cycles rated it Safe with a repair and maintenance program (SWARMP) in 2009, Safe in 2013, and SWARMP in 2019.
- DOB permits
- DOB NOW lists 2 work permits here, the newest issued January 9, 2024, for Sidewalk Shed work.
- Sidewalk Shed, issued January 9, 2024, signed off.
- Sidewalk Shed, issued November 13, 2020, signed off.
- Boiler inspection
- Inspected May 13, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 2 other open violations this page lists without it.
- What each of the 4 city statuses here means, and how many of these carry it.
- How it compares with the 618 Brooklyn buildings with 100 to 199 apartments.
- All 2 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 17 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.