909 De Kalb Ave, Brooklyn
- Built
- 1931
- Floors
- 4
- Residential units
- 3
- Building type
- Residence with stores or offices
- Zoning district
- R6A
- Lot area
- 1,560 sq ft
- Floor area
- 5,070 sq ft
- Last sale
- $1,800,000
En español: 1 violación de Clase C abierta (peligro inmediato) y 5 abiertas en total. La más antigua del HPD lleva 3 años abierta, desde el 7 de septiembre de 2023.
Open now, most hazardous first
- 1Get it certified
Class C, immediately hazardous
- 4See the 4
OATH/ECB summonses still active. Most often Construction.
Open violations are sitting, with little movement either way. 1 open Class C, with nothing filed or new in the last 180 days.
Since October 12, 2023, certifications were filed on 3 Class C violations, all 3 after the original certify-by date. How certification works
The original certify-by date on the open HPD violation, February 15, 2026, has passed. The report prints it beside the violation.
- OATH/ECB summonses
- 5 DOB and FDNY summonses here since January 1, 2019, with $50,375 in penalties imposed. 4 of them are still active, the same 4 listed under OATH/ECB. 4 judgments docketed, the latest on July 31, 2026. A docketed judgment shows up in a title search.
- July 29, 2025, DOB: Failure to maintain building in code-compliant manner. Decided by default, $25,000 penalty imposed.
- April 10, 2025, DOB: Failure to maintain building in code-compliant manner. Decided by default, $12,500 penalty imposed.
- April 10, 2025, DOB: Failure to provide unobstructed exit passageway. Decided by default, $6,250 penalty imposed.
The newest 3 of 5 summonses OATH lists here. The report lists all 5, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 2 active DOB violations. The newest was issued January 22, 2025.
- DOB permits
- DOB NOW lists 2 work permits here, the newest issued May 3, 2024, for Plumbing work.
- Plumbing, issued May 3, 2024, signed off.
- General Construction, issued September 22, 2023, signed off.
- Certificate of occupancy
- Final, issued July 18, 2017.
- Bedbug report
- Filed December 3, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 1 open | ||
| Heat / Hot Water | Certified late | 17532376 | |
| OATH/ECB | 4 open most often Construction | ||
| Construction, Class 1 | Decided by default | 35718254K | |
| Construction, Class 1 | Decided by default | 35716692L | |
| Construction, Class 1 | Decided by default | 35716691J | |
| Construction, Class 1 | Decided by default | 35686819P | |
The full report on 909 De Kalb Ave, Brooklyn
- All 5 open violations, each with the city's own words and the date on its notice.
- What each of the 2 city statuses here means, and how many of these carry it.
- How it compares with the 223,260 Brooklyn buildings with 1 to 5 apartments.
- All 2 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 5 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 4 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 909 De Kalb Ave, Brooklyn, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.