914 47th St
Brooklyn, NY 11219
914 47th Street is a walk-up building with 40 apartments, built in 1926. It has 20 open violations, 4 of them Class C, immediately hazardous. The oldest open HPD violation was filed on June 28, 1988.
En español: 4 violaciones de Clase C abiertas (peligro inmediato) y 20 abiertas en total. La más antigua del HPD lleva 38 años abierta, desde el 28 de junio de 1988.
Open now, most hazardous first
- 4Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Vermin / Infestation.
- 12See the 12
Class B, hazardous, filed in the last 3 years. Most often Fire Safety.
- 4See the 4
OATH/ECB summonses still active. Most often Construction.
1.0 open Class C per 10 apartments. Across the city: 0.7.
Certifications are being filed at least twice as fast as new violations come in. 9 certifications filed against 2 new Class C in the last 180 days.
Since November 27, 2023, certifications were filed on 30 Class C violations: 29 by the original certify-by date, 1 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works
The original certify-by dates on the 16 open HPD violations have all passed. The latest was November 9, 2026.
- Zoning district
- R6
- Lot area
- 10,000 sq ft
- Floor area
- 35,600 sq ft
- Last transfer
- No price recorded
- Last sale
- $9,475,000
- Tax lot (BBL)
- 3-05625-0008
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 4 open most often Vermin / Infestation | |||
| Vermin / Infestation | To be reinspected | 19214744 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | To be reinspected | 19214743 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Heat / Hot Water | To be reinspected | 16689611 | ||
| § 27-2029 ADM CODE Provide an adequate supply of heat for the apartment in the entire apartment | ||||
| To be reinspected | 16656084 | |||
| § 27-2005 ADM CODE Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. In the kitchen | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 12 open most often Fire Safety | |||
| To be reinspected | 19219535 | |||
| To be reinspected | 19219534 | |||
| To be reinspected | 19214751 | |||
| To be reinspected | 19214750 | |||
| To be reinspected | 19214749 | |||
| To be reinspected | 19214745 | |||
| Fire Safety | To be reinspected | 19214741 | ||
| Fire Safety | To be reinspected | 19214740 | ||
| To be reinspected | 19055202 | |||
| To be reinspected | 18529137 | |||
| To be reinspected | 18529111 | |||
| Mold | To be reinspected | 18508672 | ||
| OATH/ECB | 4 open most often Construction | |||
| Construction, Class 2 | Hearing pending | 39210571M | PARK AFFORDABLE LP | |
| Construction, Class 2 | Hearing pending | 39210564Y | PARK AFFORDABLE LP | |
| Construction, Class 1 | Hearing pending | 39157498P | ||
| Construction, Class 1 | Hearing pending | 35483716M | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 11 on September 24, 2026 and 5 on November 15.
- HPD, by year
- From 2017 to 2026, HPD filed 314 violations and closed 291, all classes.
Year Filed Closed 2026 32 49 2025 73 113 2024 91 69 2023 50 7 2021 12 5 2020 9 43 2019 46 4 2018 0 1 2017 1 0 - Energy benchmarking
- ENERGY STAR score 45 for 2025, against a median of 69 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed December 4, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- Tax exemption
- Has an Article XI tax exemption (DOF 2026/27 roll).
- HPD emergency repair orders
- 3 completed HPD emergency repair orders since November 27, 2023, awarded for $9,244 in total. The most recent of the 3 was opened August 19, 2025. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- OATH hearings
- 4 hearings scheduled on DOB summonses, the first on December 22, 2026.
- OATH/ECB summonses
- 23 DOB and FDNY summonses here since January 1, 2019, with $14,150 in penalties imposed. 4 of them are still active, the same 4 listed under OATH/ECB.
- November 4, 2026, DOB: Fail to comply with commissioner order to file certificate of correction with DOB. $1,250 penalty imposed.
- November 1, 2026, DOB: Fail to comply with commissioner order to file certificate of correction with DOB. $1,250 penalty imposed.
- August 18, 2025, DOB: Work without a permit. Adjourned, $2,500 penalty imposed.
The newest 3 of 23 summonses OATH lists here.
- Housing court
- 1 housing court case here, opened in 2024. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 2 active DOB violations. The newest was issued June 30, 2023.
- DOB complaints
- 1 DOB complaint in the last 12 months. It was filed October 16, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 21 DOB complaints from 2011 through November 25, 2026. 11 DOB violations since 1994, 9 dismissed in DOB's records.
- DOB permits
- DOB NOW lists 4 work permits here, the newest issued November 12, 2025, for Structural work.
- Structural, issued November 12, 2025, signed off.
- Structural, issued October 22, 2025, signed off.
- Plumbing, issued July 9, 2020, signed off.
The newest 3 of 4 permits DOB NOW lists here.
- Boiler inspection
- Inspected April 30, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 16 other open violations this page lists without it.
- What each of the 2 city statuses here means, and how many of these carry it.
- How it compares with the 4,017 Brooklyn buildings with 20 to 49 apartments.
- All 4 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 23 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 4 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.