Skip to content
ViolationScout9 open Class C, with 7 certifications filed and 0 new Class C in the last 180 days, too few to call a direction.Your building
Buildings458 Rear West 35 Street, ManhattanCurrent through

458 Rear West 35th St, Manhattan

BBL 1-00732-0068

Built
1900
Floors
6
Residential units
31
Building type
Walk-up building
Zoning district
R8A
Lot area
7,962 sq ft
Floor area
10,348 sq ft

En español: 9 violaciones de Clase C abiertas (peligro inmediato) y 18 abiertas en total. La más antigua del HPD lleva 6 años abierta, desde el 29 de diciembre de 2019.

Open now, most hazardous first

  1. 9

    Class C, immediately hazardous. Most often Vermin / Infestation.

    15 open counting every year, the oldest since

    Get these certified
  2. 8

    Class B, hazardous

    See the 8
  3. 1

    OATH/ECB summons still active

    See it

Open violations are sitting, with little movement either way. 9 open Class C, with 7 certifications filed and 0 new Class C in the last 180 days, too few to call a direction.

Since October 12, 2023, certifications were filed on 13 Class C violations: 9 by the original certify-by date, 4 after it. How certification works

The original certify-by dates on the 17 open HPD violations have all passed. The latest was August 17, 2026. The report prints the date beside each one.

Is this your building?

9 open Class C. The oldest open HPD violation was filed December 29, 2019.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

OATH/ECB summonses
9 DOB and FDNY summonses here since January 1, 2019, with $12,635 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 1 judgment docketed, on March 31, 2023. A docketed judgment shows up in a title search.
  • March 27, 2024, DOB: Failure to maintain building in code-compliant manner. Decided by default, $3,125 penalty imposed.
  • October 24, 2022, DOB: Fail maintain building in compliant manner: Service equipment - boiler. Decided by default, $3,125 penalty imposed.
  • March 1, 2022, FDNY: Fire-rated doors and windows. In violation, $2,575 penalty imposed.

The newest 3 of 9 summonses OATH lists here. The report lists all 9, with each outcome, the penalty imposed and any docketing date. What the report adds

How a default is vacated

DOB violations
2 active DOB violations. The newest was issued October 1, 2012.
Bedbug report
Filed May 18, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).
Tax exemption
Has a 420-c tax exemption (DOF 2026/27 roll).

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C9 open most often Vermin / Infestation
Vermin / InfestationNo access to reinspect (second try)17943808
No access to reinspect (first try)17616745
Vermin / InfestationDefect letter sent17172008
Vermin / InfestationDefect letter sent17124389
Vermin / InfestationDefect letter sent17122499
Vermin / InfestationDefect letter sent17122390
Vermin / InfestationDefect letter sent17122287
Vermin / InfestationDefect letter sent17122282
Vermin / InfestationDefect letter sent17122273
Class B8 open
Not complied with19035096CLINTON HOUSING WEST 35TH PARTNERS LP
No access to reinspect (second try)18126400
No access to reinspect (second try)18126390
No access to reinspect (second try)17943813
No access to reinspect (second try)17943807
No access to reinspect (second try)17943806
No access to reinspect (second try)17943804
No access to reinspect (first try)17616746
OATH/ECB1 open
Construction, Class 2Decided by default39110041R

The full report on 458 Rear West 35th St, Manhattan

Get the report on 458 Rear West 35th St, Manhattan, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is vermin and pests.

Nearby buildings

Questions about this building

Does 458 Rear West 35 Street, Manhattan have open violations?

Yes. 458 Rear West 35 Street, Manhattan had 18 open violations on October 10, 2026: 17 from HPD and 1 from OATH/ECB. 9 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 6 years, since December 29, 2019.

Is 458 Rear West 35 Street, Manhattan getting better or worse?

Open violations are sitting, with little movement either way. 9 open Class C, with 7 certifications filed and 0 new Class C in the last 180 days, too few to call a direction. That window ends October 10, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 458 Rear West 35 Street, Manhattan?

Since October 12, 2023, certifications were filed on 13 Class C violations: 9 by the original certify-by date, 4 after it. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 458 Rear West 35 Street, Manhattan have active DOB violations?

Yes. 2 active DOB violations. The newest was issued October 1, 2012. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

When did 458 Rear West 35 Street, Manhattan last file its bedbug report?

On May 18, 2026, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 458 Rear West 35 Street, Manhattan rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

Does 458 Rear West 35 Street, Manhattan have a property tax exemption?

The building has a 420-c tax exemption on DOF's 2026/27 roll. An exemption lowers a property's tax bill by reducing its assessed value.

When was 458 Rear West 35 Street, Manhattan built?

The city's record gives 1900 as the year 458 Rear West 35 Street, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a walk-up building with 6 floors.

How many apartments does 458 Rear West 35 Street, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 31 residential units at 458 Rear West 35 Street, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH/ECB summonses from DOB and FDNY, DOB violations, the Rent Guidelines Board's stabilized-building lists, DOF's exemption rolls, HPD's annual bedbug reports and the city's PLUTO tax-lot file. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH/ECB summonses from DOB and FDNY, DOB violations, the Rent Guidelines Board's stabilized-building lists, DOF's exemption rolls, HPD's annual bedbug reports and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 458 Rear West 35th St, Manhattan: 31 units, 9 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/458-rear-west-35-street-manhattan

How we count: /method.

Is this your building?