509 West 155th St
Manhattan, NY 10032
509 West 155th Street is an elevator building with 54 apartments, built in 1922. It has 17 open violations, 5 of them Class C, immediately hazardous. The oldest open HPD violation was filed on September 10, 2017.
En español: 5 violaciones de Clase C abiertas (peligro inmediato) y 17 abiertas en total. La más antigua del HPD lleva 9 años abierta, desde el 10 de septiembre de 2017.
Open now, most hazardous first
- 5Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Vermin / Infestation.
- 11See the 11
Class B, hazardous, filed in the last 3 years. Most often Mold.
- 1See it
OATH/ECB summons still active
0.9 open Class C per 10 apartments. Across the city: 0.7.
Certifications are being filed at least twice as fast as new violations come in. 18 certifications filed against 0 new Class C in the last 180 days.
Since November 27, 2023, certifications were filed on 8 Class C violations, all 8 by the original certify-by date. How certification works
The original certify-by dates on the 16 open HPD violations have all passed. The latest was October 14, 2026.
- Zoning district
- R7-2
- Lot area
- 13,989 sq ft
- Floor area
- 58,674 sq ft
- Last sale
- $5,421,022
- Tax lot (BBL)
- 1-02114-0052
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 5 open most often Vermin / Infestation | |||
| Vermin / Infestation | Notice sent to tenant | 18818366 | FLGSP 509 W 155 St LLC | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | Notice sent to tenant | 18797095 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Vermin / Infestation | Invalid certification | 18773321 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Vermin / Infestation | Invalid certification | 18773320 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | Notice sent to tenant | 18676628 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 11 open most often Mold | |||
| Notice sent | 19042174 | FLGSP 509 W 155 St LLC | ||
| Notice sent | 19042171 | FLGSP 509 W 155 St LLC | ||
| Mold | Invalid certification | 19172837 | FLGSP 509 W 155 St LLC | |
| Mold | Invalid certification | 19172836 | FLGSP 509 W 155 St LLC | |
| Not complied with | 18818355 | FLGSP 509 W 155 St LLC | ||
| Not complied with | 18818354 | FLGSP 509 W 155 St LLC | ||
| Not complied with | 18818353 | FLGSP 509 W 155 St LLC | ||
| Mold | Defect letter sent | 18797096 | ||
| Invalid certification | 18773322 | |||
| Invalid certification | 18773319 | |||
| Invalid certification | 18773318 | |||
| OATH/ECB | 1 open | |||
| Elevators, Class 2 | Hearing pending | 39182546P | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2017 to 2026, HPD filed 232 violations and closed 209, all classes.
Year Filed Closed 2026 40 43 2025 22 15 2024 23 16 2023 54 48 2022 7 14 2021 14 6 2020 11 9 2019 5 22 2018 23 19 2017 33 17 - Energy benchmarking
- ENERGY STAR score 67 for 2025, against a median of 69 for Multifamily Housing that year.
- Local Law 97
- On the covered list (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed December 17, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
Hearings and penalties
- OATH hearings
- A hearing on a DOB summons is set for January 7, 2027.
- OATH/ECB summonses
- 13 DOB summonses here since January 1, 2019, with $10,625 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 3 judgments docketed, the latest on October 31, 2026. A docketed judgment shows up in a title search.
- April 14, 2026, DOB: Failure to maintain elevator or conveying system. Dismissed.
- March 31, 2026, DOB: Failure to maintain elevator or conveying system. Adjourned, $625 penalty imposed.
- March 30, 2026, DOB: Failure to maintain building in code-compliant manner. In violation.
The newest 3 of 13 summonses OATH lists here.
- Housing court
- 6 housing court cases here since 2005. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 4 active DOB violations. The newest was issued April 27, 2022.
- DOB complaints
- 9 DOB complaints in the last 12 months. The newest was filed November 23, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 31 DOB complaints from 1997 through November 25, 2026. 22 DOB violations since 1988, 12 resolved and 6 dismissed in DOB's records.
- DOB facade
- Rated Safe in the latest facade report, filed March 17, 2021 (inspection cycle 9). Reports in earlier inspection cycles rated it Safe with a repair and maintenance program (SWARMP) in 2012.
- DOB permits
- DOB NOW lists 2 work permits here, the newest issued November 22, 2019, for Sidewalk Shed work.
- Sidewalk Shed, issued November 22, 2019, signed off.
- Antenna, issued June 12, 2019, signed off.
- Boiler inspection
- Inspected September 17, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 12 other open violations this page lists without it.
- What each of the 6 city statuses here means, and how many of these carry it.
- How it compares with the 2,042 Manhattan buildings with 50 to 99 apartments.
- All 2 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 13 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.