121 Post Ave, Manhattan
- Built
- 1911
- Floors
- 5
- Residential units
- 10
- Building type
- Walk-up building
- Zoning district
- R7A
- Lot area
- 2,500 sq ft
- Floor area
- 9,050 sq ft
En español: 14 violaciones de Clase C abiertas (peligro inmediato) y 26 abiertas en total. La más antigua del HPD lleva 5 años abierta, desde el 10 de noviembre de 2020.
Open now, most hazardous first
- 14Get these certified
Class C, immediately hazardous. Most often Vermin / Infestation.
- 12See the 12
Class B, hazardous
Certifications are being filed faster than new violations come in. 27 certifications filed against 0 new Class C in the last 180 days.
Since October 12, 2023, certifications were filed on 15 Class C violations: 13 by the original certify-by date, 2 after it. How certification works
The original certify-by dates on the 26 open HPD violations have all passed. The latest was August 12, 2026. The report prints the date beside each one.
- Open Class C, week by week
- 14 on September 24, 2026 and 14 on October 8.
- DOF tax lien sale
- Listed for DOF's 2025 tax lien sale, for water and sewer charges only. The last list it appeared on was the 10-day notice of May 2025.
- DOB violations
- 1 active DOB violation, issued April 25, 2023.
- Housing court
- 5 housing court cases here since 2010.
- Boiler inspection
- Inspected May 29, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed April 16, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair orders
- 2 completed HPD emergency repair orders since October 12, 2023, awarded for $1,190 in total. The most recent of the 2, a general construction order, was opened April 27, 2026.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 14 open most often Vermin / Infestation | |||
| Fire Safety | To be reinspected | 18277321 | 121 POST AVENUE LLC | |
| Vermin / Infestation | Defect letter sent | 17717727 | ||
| Vermin / Infestation | Defect letter sent | 17717726 | ||
| Vermin / Infestation | Not complied with | 17717722 | ||
| Vermin / Infestation | Defect letter sent | 17717721 | ||
| Vermin / Infestation | No access to reinspect (first try) | 17690262 | ||
| Vermin / Infestation | No access to reinspect (first try) | 17690261 | ||
| Lead Paint | Notice sent | 16538845 | ||
| Lead Paint | Defect letter sent | 16538501 | ||
| Lead Paint | Defect letter sent | 16538499 | ||
| The report lists all 14, each with the city's own words and the date on its notice. What the report adds | ||||
| Class B | 12 open | |||
| Notice sent | 19025358 | 121 POST AVENUE LLC | ||
| Mold | No access to reinspect (first try) | 18584469 | ||
| Not complied with | 18235583 | |||
| Mold | Defect letter sent | 18060075 | ||
| Not complied with | 17717724 | |||
| Not complied with | 17717714 | |||
| Not complied with | 17717708 | |||
| Not complied with | 17717707 | |||
| Fire Safety | No access to reinspect (first try) | 17510263 | ||
| Fire Safety | No access to reinspect (first try) | 17510262 | ||
| The report lists all 12, each with the city's own words and the date on its notice. What the report adds | ||||
The full report on 121 Post Ave, Manhattan
- All 26 open violations, each with the city's own words and the date on its notice.
- What each of the 5 city statuses here means, and how many of these carry it.
- How it compares with the 11,097 Manhattan buildings with 6 to 19 apartments.
- Every other record on this page, on a cover you can forward.
Get the report on 121 Post Ave, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.