Skip to content
ViolationScout27 certifications filed against 0 new Class C in the last 180 days.Your building
Buildings121 Post Avenue, ManhattanCurrent through

121 Post Ave, Manhattan

BBL 1-02219-0013

Built
1911
Floors
5
Residential units
10
Building type
Walk-up building
Zoning district
R7A
Lot area
2,500 sq ft
Floor area
9,050 sq ft

En español: 14 violaciones de Clase C abiertas (peligro inmediato) y 26 abiertas en total. La más antigua del HPD lleva 5 años abierta, desde el 10 de noviembre de 2020.

Open now, most hazardous first

  1. 14

    Class C, immediately hazardous. Most often Vermin / Infestation.

    15 open counting every year, the oldest since

    Get these certified
  2. 12

    Class B, hazardous

    See the 12

Certifications are being filed faster than new violations come in. 27 certifications filed against 0 new Class C in the last 180 days.

Since October 12, 2023, certifications were filed on 15 Class C violations: 13 by the original certify-by date, 2 after it. How certification works

The original certify-by dates on the 26 open HPD violations have all passed. The latest was August 12, 2026. The report prints the date beside each one.

Is this your building?

14 open Class C. The oldest open HPD violation was filed November 10, 2020.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

Open Class C, week by week
14 on September 24, 2026 and 14 on October 8.
DOF tax lien sale
Listed for DOF's 2025 tax lien sale, for water and sewer charges only. The last list it appeared on was the 10-day notice of May 2025.
DOB violations
1 active DOB violation, issued April 25, 2023.
Housing court
5 housing court cases here since 2010.
Boiler inspection
Inspected May 29, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed April 16, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).
HPD emergency repair orders
2 completed HPD emergency repair orders since October 12, 2023, awarded for $1,190 in total. The most recent of the 2, a general construction order, was opened April 27, 2026.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C14 open most often Vermin / Infestation
Fire SafetyTo be reinspected18277321121 POST AVENUE LLC
Vermin / InfestationDefect letter sent17717727
Vermin / InfestationDefect letter sent17717726
Vermin / InfestationNot complied with17717722
Vermin / InfestationDefect letter sent17717721
Vermin / InfestationNo access to reinspect (first try)17690262
Vermin / InfestationNo access to reinspect (first try)17690261
Lead PaintNotice sent16538845
Lead PaintDefect letter sent16538501
Lead PaintDefect letter sent16538499
The report lists all 14, each with the city's own words and the date on its notice. What the report adds
Class B12 open
Notice sent19025358121 POST AVENUE LLC
MoldNo access to reinspect (first try)18584469
Not complied with18235583
MoldDefect letter sent18060075
Not complied with17717724
Not complied with17717714
Not complied with17717708
Not complied with17717707
Fire SafetyNo access to reinspect (first try)17510263
Fire SafetyNo access to reinspect (first try)17510262
The report lists all 12, each with the city's own words and the date on its notice. What the report adds

The full report on 121 Post Ave, Manhattan

Get the report on 121 Post Ave, Manhattan, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is vermin and pests.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 121 Post Avenue, Manhattan have open violations?

Yes. 121 Post Avenue, Manhattan had 26 open violations on October 10, 2026: 26 from HPD. 14 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 5 years, since November 10, 2020.

Is 121 Post Avenue, Manhattan getting better or worse?

Certifications are being filed faster than new violations come in. 27 certifications filed against 0 new Class C in the last 180 days. That window ends October 10, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 121 Post Avenue, Manhattan?

Since October 12, 2023, certifications were filed on 15 Class C violations: 13 by the original certify-by date, 2 after it. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 121 Post Avenue, Manhattan have active DOB violations?

Yes. 1 active DOB violation, issued April 25, 2023. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has 121 Post Avenue, Manhattan been in housing court?

Yes. 5 housing court cases here since 2010. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Are any HPD emergency repair orders at 121 Post Avenue, Manhattan marked completed?

Yes. 2 completed HPD emergency repair orders since October 12, 2023, awarded for $1,190 in total. The most recent of the 2, a general construction order, was opened April 27, 2026. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

When was the boiler at 121 Post Avenue, Manhattan last inspected?

On May 29, 2026. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 121 Post Avenue, Manhattan last file its bedbug report?

On April 16, 2026, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 121 Post Avenue, Manhattan rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 121 Post Avenue, Manhattan built?

The city's record gives 1911 as the year 121 Post Avenue, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a walk-up building with 5 floors.

How many apartments does 121 Post Avenue, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 10 residential units at 121 Post Avenue, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on DOF's tax lien sale lists, DOB violations, HPD's housing court cases, the Rent Guidelines Board's stabilized-building lists, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports and the city's PLUTO tax-lot file. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus DOF's tax lien sale lists, DOB violations, HPD's housing court cases, the Rent Guidelines Board's stabilized-building lists, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 121 Post Ave, Manhattan: 10 units, 14 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/121-post-avenue-manhattan

How we count: /method.

Is this your building?