1068 Gerard Ave
Bronx, NY 10452
1068 Gerard Avenue is an elevator building with 82 apartments, built in 2007. It has 55 open violations, 9 of them Class C, immediately hazardous. The oldest open HPD violation was filed on October 16, 2025.
En español: 9 violaciones de Clase C abiertas (peligro inmediato) y 55 abiertas en total. La más antigua del HPD lleva 13 meses abierta, desde el 16 de octubre de 2025.
Open now, most hazardous first
- 9Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Fire Safety.
- 45See the 45
Class B, hazardous, filed in the last 3 years. Most often Fire Safety.
- 1See it
OATH/ECB summons still active
1.1 open Class C per 10 apartments. Across the city: 0.7.
Certifications and new violations are both coming in, neither at twice the other's rate. 11 certifications filed and 9 new Class C in the last 180 days.
Since November 27, 2023, certifications were filed on 12 Class C violations, all 12 by the original certify-by date. How certification works
The original certify-by dates on the 54 open HPD violations run from December 5, 2025 to January 11, 2027.
- Zoning district
- R8
- Lot area
- 11,800 sq ft
- Floor area
- 90,175 sq ft
- Tax lot (BBL)
- 2-02478-0007
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 9 open most often Fire Safety | |||
| Notice sent | 19440006 | 1068 GERARD PARTNERSHIP LP | ||
| § 27-2005, 2007 ADM CODE Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed on door to rear yard at public hall, 1st story | ||||
| Fire Safety | Notice sent | 19440004 | 1068 GERARD PARTNERSHIP LP | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective [latch set] door to rear yard at public hall, 1st story | ||||
| Fire Safety | Notice sent | 19440003 | 1068 GERARD PARTNERSHIP LP | |
| § 27-2005, 2007 ADM CODE Remove device preventing door from being self-closing brick at door to rear yard at public hall, 1st story | ||||
| Fire Safety | Notice sent | 19440002 | 1068 GERARD PARTNERSHIP LP | |
| § 27-2005, 2007 ADM CODE Remove device preventing door from being self-closing cone at door from vestibule to public hall at public hall, 1st story | ||||
| Fire Safety | Notice sent | 19175532 | 1068 GERARD PARTNERSHIP LP | |
| § 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of painted sprinkler caps at ceiling , 1st story | ||||
| Fire Safety | Notice sent | 19175530 | 1068 GERARD PARTNERSHIP LP | |
| § 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of safety cap installed on sprinkler head at west wall in the 2nd room from north | ||||
| Notice sent | 19175522 | 1068 GERARD PARTNERSHIP LP | ||
| § 27-2026 ADM CODE Remove all obstructions from water closet ,, in the bathroom | ||||
| Fire Safety | Notice sent | 19175520 | 1068 GERARD PARTNERSHIP LP | |
| § 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of painted sprinkler cap at ceiling in the foyer | ||||
| Notice sent | 19147466 | |||
| § 27-2005 ADM CODE Properly repair with similar material the broken or defective wood floors in the foyer | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 45 open most often Fire Safety | |||
| Notice sent | 19440007 | 1068 GERARD PARTNERSHIP LP | ||
| Notice sent | 19440005 | 1068 GERARD PARTNERSHIP LP | ||
| Notice sent | 19175531 | 1068 GERARD PARTNERSHIP LP | ||
| Fire Safety | Notice sent | 19175529 | 1068 GERARD PARTNERSHIP LP | |
| Fire Safety | Notice sent | 19175528 | 1068 GERARD PARTNERSHIP LP | |
| Notice sent | 19175527 | 1068 GERARD PARTNERSHIP LP | ||
| Notice sent | 19175526 | 1068 GERARD PARTNERSHIP LP | ||
| Notice sent | 19175524 | 1068 GERARD PARTNERSHIP LP | ||
| Notice sent | 19175523 | 1068 GERARD PARTNERSHIP LP | ||
| Fire Safety | CIV14 mailed | 19175519 | 1068 GERARD PARTNERSHIP LP | |
| Fire Safety | CIV14 mailed | 19175518 | 1068 GERARD PARTNERSHIP LP | |
| Notice sent | 19175516 | 1068 GERARD PARTNERSHIP LP | ||
| To be reinspected | 19147465 | |||
| Notice sent | 19147464 | |||
| Notice sent | 19147463 | |||
| Fire Safety | Notice sent | 19147462 | ||
| Fire Safety | Notice sent | 19147461 | ||
| Notice sent | 19147460 | |||
| Notice sent | 19147459 | |||
| Notice sent | 19147458 | |||
| Notice sent | 19147457 | |||
| Notice sent | 19147456 | |||
| Notice sent | 19002122 | |||
| Notice sent | 19002116 | |||
| Notice sent | 19002115 | |||
| Notice sent | 19002114 | |||
| Notice sent | 19002113 | |||
| Notice sent | 19002112 | |||
| Notice sent | 19002111 | |||
| Notice sent | 19002110 | |||
| Notice sent | 19002109 | |||
| Notice sent | 19002108 | |||
| Notice sent | 19002107 | |||
| Notice sent | 19002106 | |||
| Notice sent | 18973736 | |||
| Fire Safety | Notice sent | 18973735 | ||
| Fire Safety | Notice sent | 18973734 | ||
| Notice sent | 18973733 | |||
| Notice sent | 18973732 | |||
| Notice sent | 18760745 | |||
| Notice sent | 18637981 | |||
| Notice sent | 18637975 | |||
| Notice sent | 18637969 | |||
| No access to reinspect (first try) | 18352916 | |||
| Not complied with | 18303799 | |||
| OATH/ECB | 1 open | |||
| Construction, Class 2 | Hearing pending | 39560020X | 1068 GERARD PARTNERSHIP LP | |
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2017 to 2026, HPD filed 348 violations and closed 293, all classes.
Year Filed Closed 2026 72 26 2025 19 8 2024 17 22 2023 17 11 2022 10 16 2021 16 13 2020 24 24 2019 78 75 2018 34 56 2017 61 42 - Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed December 17, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- Tax exemption
- Has a 421-a tax exemption (DOF 2026/27 roll). DOF lists its start year as 2010.
- HPD emergency repair orders
- 2 completed HPD emergency repair orders since November 27, 2023, awarded for $7,280 in total. The most recent of the 2, a general construction order, was opened April 9, 2024. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- OATH hearings
- A hearing on a DOB summons is set for December 18, 2026.
- OATH/ECB summonses
- 23 DOB and FDNY summonses here since January 1, 2019, with $43,550 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 12 judgments docketed, the latest on September 30, 2022. A docketed judgment shows up in a title search.
- October 1, 2026, DOB: Pedestrian protection does not meet code specifications. $2,400 penalty imposed.
- August 17, 2026, FDNY: Fire protection systems. Decided by default, $3,000 penalty imposed.
- August 17, 2026, FDNY: Inspection and testing. Decided by default, $2,000 penalty imposed.
The newest 3 of 23 summonses OATH lists here.
- Housing court
- 1 open housing court case, opened October 22, 2025. 17 housing court cases here since 2009. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 7 active DOB violations, most of them for low-pressure boilers. The newest was issued June 30, 2023.
- DOB complaints
- 4 DOB complaints in the last 12 months. The newest was filed October 1, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 74 DOB complaints from 1995 through November 25, 2026. 25 DOB violations since 1995, 6 resolved and 12 dismissed in DOB's records.
- DOB facade
- Rated Safe in the latest facade report, filed February 5, 2023 (inspection cycle 9). Reports in earlier inspection cycles rated it Unsafe in 2017 and Safe with a repair and maintenance program (SWARMP) in 2022.
- DOB permits
- 2 DOB work permits in effect. The latest, for Sidewalk Shed work, was issued September 24, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
- Sidewalk Shed, issued September 24, 2026, in effect until December 23, 2026.
- General Construction, issued September 1, 2026, in effect until March 25, 2027.
- General Construction, issued October 20, 2022, signed off.
The newest 3 of 6 permits DOB NOW lists here.
- Boiler inspection
- 3 boilers, all inspected in 2026, the latest on February 9. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 46 other open violations this page lists without it.
- What each of the 6 city statuses here means, and how many of these carry it.
- How it compares with the 1,981 Bronx buildings with 50 to 99 apartments.
- All 6 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 23 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.