1073 Bedford Ave
Brooklyn, NY 11216
1073 Bedford Avenue is a walk-up building with 12 apartments, built in 1931. It has 9 open violations, 5 of them Class C, immediately hazardous. The oldest open HPD violation was filed on May 4, 2017.
En español: 5 violaciones de Clase C abiertas (peligro inmediato) y 9 abiertas en total. La más antigua del HPD lleva 9 años abierta, desde el 4 de mayo de 2017.
Open now, most hazardous first
- 5Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Vermin / Infestation.
- 4See the 4
Class B, hazardous, filed in the last 3 years. Most often Mold.
4.2 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. 3 certifications filed and 0 new Class C in the last 180 days, too few to call a direction.
Since November 27, 2023, certifications were filed on 7 Class C violations, all 7 by the original certify-by date. How certification works
The original certify-by dates on the 9 open HPD violations have all passed. The latest was July 7, 2026.
- Zoning district
- R7A
- Lot area
- 4,000 sq ft
- Floor area
- 11,520 sq ft
- Tax lot (BBL)
- 3-01802-0003
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 5 open most often Vermin / Infestation | |||
| Vermin / Infestation | Not complied with | 17213431 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | Defect letter sent | 17042717 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Vermin / Infestation | Not complied with | 17042716 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | Defect letter sent | 16995770 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Vermin / Infestation | Not complied with | 16995769 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 4 open most often Mold | |||
| Notice sent | 18937351 | 1073-75 BEDFORD LLC | ||
| Mold | Defect letter sent | 17081366 | ||
| Mold | No access to reinspect (first try) | 17353836 | ||
| Mold | No access to reinspect (first try) | 17307458 | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2017 to 2026, HPD filed 102 violations and closed 82, all classes.
Year Filed Closed 2026 8 3 2025 1 1 2024 21 17 2023 5 9 2022 11 7 2020 11 8 2019 7 13 2018 34 24 2017 4 0 - Bedbug report
- Filed December 8, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- HPD emergency repair order
- 1 completed HPD emergency repair order since November 27, 2023: a general construction order, opened April 9, 2024, awarded for $250. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- OATH/ECB summonses
- 1 DOB summons here since January 1, 2019.
- April 15, 2019, DOB: Fail maintain building in compliant manner: Service equipment - boiler. Dismissed.
- Housing court
- 6 housing court cases here since 2005. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 5 active DOB violations, most of them for low-pressure boilers. The newest was issued June 30, 2023.
- DOB, all years
- 37 DOB complaints from 2013 through November 25, 2026. 15 DOB violations since 1993, 10 dismissed in DOB's records.
- DOB permits
- 1 DOB work permit in effect, for Plumbing work, issued September 4, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
- Plumbing, issued September 4, 2026, in effect until May 18, 2027.
- Mechanical Systems, issued August 31, 2026, expired October 19, 2026.
- Boiler inspection
- Inspected February 17, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 4 other open violations this page lists without it.
- What each of the 4 city statuses here means, and how many of these carry it.
- How it compares with the 19,359 Brooklyn buildings with 6 to 19 apartments.
- All 2 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 1 DOB summons at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.