Skip to content
ViolationScout15 open Class C, with 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.Is this your building?
Buildings1429 5 Avenue, ManhattanCurrent through

1429 5th Ave, Manhattan

BBL 1-01622-0073

En español: 15 violaciones de Clase C abiertas (peligro inmediato) y 59 abiertas en total.

Open violations are sitting, with little movement either way. 15 open Class C, with 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.

Since September 28, 2023, certifications were filed on 11 Class C violations, all 11 by the original certify-by date. How certification works

Is this your building?

15 open Class C.

We read every request ourselves. When a compliance firm we work with can take the building, we introduce you to that one firm. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: which violations matter, and how long this kind usually takes to clear. It is not on sale yet.

See what the report covers

HPD takes complaints from tenants through 311.

OATH hearings
A hearing on a DOB summons is set for December 3, 2026.
DOB violations
25 active DOB violations, most of them for boiler filings under Local Law 62/91. The newest was issued May 29, 2026.
Housing court
1 open housing court case, opened May 4, 2026.
DOB complaints
4 DOB complaints in the last 12 months. The newest was filed August 11, 2026.
Energy benchmarking
ENERGY STAR score 14 for 2024, against a median of 67 for Multifamily Housing that year.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Rent stabilization
Has rent-stabilized apartments (2024 registration).
HPD emergency repair order
1 completed HPD emergency repair order since September 28, 2023: a general construction order, opened October 15, 2025, awarded for $437.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C15 open most often Vermin / Infestation
Fire SafetyNo access to reinspect (first try)19161893La Casa Quinta
MoldNotice sent to tenant19201307
Vermin / InfestationNot complied with18112932
Vermin / InfestationNot complied with18112931
Vermin / InfestationNot complied with18094421
Vermin / InfestationNo access to reinspect (first try)18094420
Vermin / InfestationNo access to reinspect (first try)18094418
Vermin / InfestationNo access to reinspect (first try)17711544
Vermin / InfestationNo access to reinspect (first try)17397531
Vermin / InfestationNo access to reinspect (first try)17151572
Vermin / InfestationNo access to reinspect (first try)17151571
Vermin / InfestationNo access to reinspect (first try)17093245
Vermin / InfestationNo access to reinspect (first try)17093244
Vermin / InfestationNo access to reinspect (first try)16869468
Fire SafetyNo access to reinspect (first try)16307505
Class B41 open most often Fire Safety
Notice sent19195818
Notice sent19195811
Notice sent19176724La Casa Quinta
Not complied with18218669
Not complied with18218668
Fire SafetyNo access to reinspect (first try)18196459
Fire SafetyNo access to reinspect (first try)18196458
No access to reinspect (first try)18196457
No access to reinspect (first try)18196456
No access to reinspect (first try)18137701
No access to reinspect (first try)18137700
No access to reinspect (first try)18131622
No access to reinspect (first try)18131621
No access to reinspect (first try)18131620
Not complied with18112936
Not complied with18112934
Not complied with18094424
No access to reinspect (first try)18094417
No access to reinspect (first try)18094416
Fire SafetyNo access to reinspect (first try)17979852
MoldNo access to reinspect (first try)17711543
No access to reinspect (first try)17151576
Fire SafetyNo access to reinspect (first try)17151574
Fire SafetyNo access to reinspect (first try)17151573
No access to reinspect (first try)17151570
No access to reinspect (first try)17093246
No access to reinspect (first try)17093243
No access to reinspect (first try)17006023
No access to reinspect (first try)17006022
No access to reinspect (first try)16576722
Fire SafetyNo access to reinspect (first try)16526660
Fire SafetyNo access to reinspect (first try)16526659
No access to reinspect (first try)16414076
No access to reinspect (first try)16414075
No access to reinspect (first try)16365445
No access to reinspect (first try)16351345
No access to reinspect (first try)16351343
No access to reinspect (first try)16351342
No access to reinspect (first try)16343353
No access to reinspect (first try)16343352
No access to reinspect (first try)16307507
OATH/ECB3 open most often Construction
Construction, Class 2Hearing pending39200400ZLa Casa Quinta
Construction, Class 2Found in violation35729907MLa Casa Quinta
Class 2Found in violation35729906KLa Casa Quinta

The most common category among the open records here is vermin and pests.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 1429 5 Avenue, Manhattan have open violations?

Yes. 1429 5 Avenue, Manhattan had 59 open violations on September 26, 2026: 56 from HPD and 3 from OATH/ECB. 15 are Class C, the class HPD treats as immediately hazardous.

Is 1429 5 Avenue, Manhattan getting better or worse?

Open violations are sitting, with little movement either way. 15 open Class C, with 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction. That window ends September 26, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 1429 5 Avenue, Manhattan?

Since September 28, 2023, certifications were filed on 11 Class C violations, all 11 by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 1429 5 Avenue, Manhattan have an OATH hearing coming up?

Yes. A hearing on a DOB summons is set for December 3, 2026. DOB summonses are heard at OATH, the city's hearings office, and OATH can move a hearing to a later date. When nobody shows up, the summons is decided by default, the costliest way one ends.

Does 1429 5 Avenue, Manhattan have active DOB violations?

Yes. 25 active DOB violations, most of them for boiler filings under Local Law 62/91. The newest was issued May 29, 2026. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Is 1429 5 Avenue, Manhattan in housing court?

Yes. 1 open housing court case, opened May 4, 2026. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Has DOB received complaints about 1429 5 Avenue, Manhattan?

Yes. 4 DOB complaints in the last 12 months. The newest was filed August 11, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

Are any HPD emergency repair orders at 1429 5 Avenue, Manhattan marked completed?

Yes. 1 completed HPD emergency repair order since September 28, 2023: a general construction order, opened October 15, 2025, awarded for $437. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

What is the ENERGY STAR score for 1429 5 Avenue, Manhattan?

ENERGY STAR score 14 for 2024, against a median of 67 for Multifamily Housing that year. Buildings over 25,000 square feet report their energy use to the city every year under Local Law 84. The ENERGY STAR score runs from 1 to 100 and compares a building with similar ones nationwide; 50 is the national median. The score is the one the city publishes, and this page never estimates a Local Law 97 emissions penalty. A lot that reported several properties in one year is not scored here.

Is 1429 5 Avenue, Manhattan covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 1429 5 Avenue, Manhattan rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 1429 5 Avenue, Manhattan built?

The city's record gives 2004 as the year 1429 5 Avenue, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator apartment building with 6 floors.

How many apartments does 1429 5 Avenue, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 42 residential units at 1429 5 Avenue, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH hearing dates, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, HPD emergency repair orders, Local Law 84 energy reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 26, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH hearing dates, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, HPD emergency repair orders, Local Law 84 energy reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 1429 5th Ave, Manhattan: 15 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 26, 2026. https://violationscout.com/building/1429-5-avenue-manhattan

How we count: /method.

Is this your building?