1974 51st St, Brooklyn
- Built
- 1928
- Floors
- 4
- Residential units
- 47
- Building type
- Walk-up building
- Zoning district
- R5
- Lot area
- 11,886 sq ft
- Floor area
- 37,916 sq ft
En español: 3 violaciones de Clase C abiertas (peligro inmediato) y 7 abiertas en total. La más antigua del HPD lleva 7 años abierta, desde el 11 de septiembre de 2019.
Open now, most hazardous first
- 3Get these certified
Class C, immediately hazardous. Most often Heat / Hot Water.
- 4See the 4
Class B, hazardous
Open violations are sitting, with little movement either way. 3 open Class C, with 5 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.
Since October 12, 2023, certifications were filed on 18 Class C violations, all 18 by the original certify-by date. HPD now marks 1 of them Invalid Certification. How certification works
The original certify-by dates on the 7 open HPD violations have all passed. The latest was June 24, 2026. The report prints the date beside each one.
- OATH/ECB summonses
- 1 FDNY summons here since January 1, 2019, with $700 in penalties imposed. 1 judgment docketed, on January 31, 2026. A docketed judgment shows up in a title search.
- August 20, 2024, FDNY: Storage, accumulation and removal of combustible material and waste. In violation, $700 penalty imposed.
- DOB violations
- 5 active DOB violations. The newest was issued June 20, 2023.
- Energy benchmarking
- ENERGY STAR score 64 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered from 2026 as a rent-regulated building (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected April 28, 2025. Boilers in buildings with 6 or more apartments are inspected every calendar year. Need this filed?
- Bedbug report
- Filed December 12, 2024, for the year to October 31, 2024. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair order
- 1 completed HPD emergency repair order since October 12, 2023: a general construction order, opened October 29, 2024, awarded for $2,260.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 3 open most often Heat / Hot Water | |||
| Vermin / Infestation | Defect letter sent | 18851234 | J 1974 LLC | |
| Heat / Hot Water | Invalid certification | 18490774 | J 1974 LLC | |
| Heat / Hot Water | Not complied with | 16487353 | ||
| Class B | 4 open | |||
| Not complied with | 18851238 | J 1974 LLC | ||
| Not complied with | 18851237 | J 1974 LLC | ||
| Notice sent | 18490775 | J 1974 LLC | ||
| Notice sent | 18490752 | J 1974 LLC | ||
The full report on 1974 51st St, Brooklyn
- All 7 open violations, each with the city's own words and the date on its notice.
- What each of the 4 city statuses here means, and how many of these carry it.
- How it compares with the 4,010 Brooklyn buildings with 20 to 49 apartments.
- All 1 FDNY summons at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.
Get the report on 1974 51st St, Brooklyn, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.