2 Jumel Ter
Washington Heights, Manhattan, NY 10032
2 Jumel Terrace is an elevator building with 27 apartments, built in 1909. It has 27 open violations, 13 of them Class C, immediately hazardous. The oldest open HPD violation was filed on February 8, 2014.
En español: 13 violaciones de Clase C abiertas (peligro inmediato) y 27 abiertas en total. La más antigua del HPD lleva 12 años abierta, desde el 8 de febrero de 2014.
Open now, most hazardous first
- 13Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Mold.
- 12See the 12
Class B, hazardous, filed in the last 3 years. Most often Mold.
- 2See the 2
OATH/ECB summonses still active. Most often Construction.
4.8 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. No certification filed and no new Class C violation in the last 180 days.
Since November 16, 2023, certifications were filed on 30 Class C violations, all 30 by the original certify-by date. HPD now marks 1 of them Invalid Certification. How certification works
The original certify-by dates on the 25 open HPD violations have all passed. The latest was September 2, 2025.
- Zoning district
- R7-2
- Lot area
- 6,525 sq ft
- Floor area
- 28,512 sq ft
- Tax lot (BBL)
- 1-02109-0070
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 13 open most often Mold | ||
| Lead Paint | Notice sent | 18036106 | |
| § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six | |||
| Mold | Notice sent to tenant | 17803122 | |
| § 27-2017.3 HMC: Trace and repair the source and abate the visible mold condition... Greater than 30 sqft at west and north walls in the 4th room from north at east | |||
| Mold | Notice sent to tenant | 17757163 | |
| § 27-2017.3 HMC: Trace and repair the source and abate the visible mold condition... Greater than 10 sq ft south wall in the 3rd room from east at south | |||
| Mold | Notice sent to tenant | 17757159 | |
| § 27-2017.3 HMC: Trace and repair the source and abate the visible mold condition... Greater than 10 sq ft west wall in the 3rd room from east at south | |||
| Fire Safety | Not complied with | 17494199 | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective building entrance door hinges , 1st story | |||
| Not complied with | 17442595 | ||
| § 27-2005 HMC: Properly repair or replace the broken or defective lower sash windown spring balance at east wall in the 1st room from east at south | |||
| Not complied with | 17436184 | ||
| § 27-2005 HMC: Properly repair or replace the broken or defective stuck upper and lower window sash at south wall in the 2nd room from north | |||
| Vermin / Infestation | Notice sent to tenant | 17401354 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | |||
| Mold | Notice sent to tenant | 18015416 | |
| Not complied with | 17315517 | ||
| § 27-2005 ADM CODE Properly repair with similar material the broken or defective ceramic tiled floor in the kitchen | |||
| Not complied with | 17315512 | ||
| § 27-2005 HMC: Properly repair or replace the broken or defective wood window frames at the east wall in the 1st room from east at south | |||
| Not complied with | 17174316 | ||
| § 27-2005 HMC: Properly repair or replace the broken or defective upper and lower window sash balance at fire escape window in the 1st room from east at south | |||
| Invalid certification | 16508467 | ||
| § 27-2005 HMC: Properly repair or replace the broken or defective lock at entrance door to the building , 1st story | |||
| In HPD's words. Apartment numbers are left out. | |||
| Class B | 12 open most often Mold | ||
| Mold | Defect letter sent | 17979929 | |
| Not complied with | 17879197 | ||
| Mold | Defect letter sent | 18098763 | |
| Mold | Defect letter sent | 17757155 | |
| Notice sent | 17548037 | ||
| Not complied with | 17401357 | ||
| Not complied with | 17401353 | ||
| Not complied with | 17401352 | ||
| Not complied with | 17401350 | ||
| Not complied with | 17315519 | ||
| Not complied with | 17174372 | ||
| Not complied with | 17174342 | ||
| OATH/ECB | 2 open most often Construction | ||
| Construction, Class 1 | Found in violation | 39199744R | |
| Construction, Class 1 | Found in violation | 39118528P | |
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 13 on September 24, 2026 and 13 on November 8.
- HPD, by year
- From 2017 to 2026, HPD filed 337 violations and closed 331, all classes.
Year Filed Closed 2026 1 1 2025 50 50 2024 35 20 2023 9 34 2022 39 2 2021 1 7 2020 13 91 2019 107 91 2018 51 13 2017 31 22 - Energy benchmarking
- ENERGY STAR score 96 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed December 8, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- HPD emergency repair order
- 1 completed HPD emergency repair order since November 16, 2023: a general construction order, opened October 10, 2024, awarded for $850. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- OATH/ECB summonses
- 11 DOB and FDNY summonses here since January 1, 2019, with $10,449 in penalties imposed. 2 of them are still active, the same 2 listed under OATH/ECB. 3 judgments docketed, the latest on August 31, 2021. A docketed judgment shows up in a title search.
- August 7, 2026, DOB: Failure to maintain building in code-compliant manner. In violation, $5,000 penalty imposed.
- July 6, 2024, DOB: Failure to maintain building in code-compliant manner. In violation, $625 penalty imposed.
- May 13, 2022, DOB: Fail maintain building in compliant manner: Service equipment - boiler. In violation.
The newest 3 of 11 summonses OATH lists here.
- Housing court
- 17 housing court cases here since 2006. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 9 active DOB violations. The newest was issued December 19, 2018.
- DOB complaints
- 1 DOB complaint in the last 12 months. It was filed July 22, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 43 DOB complaints from 1993 through November 14, 2026. 30 DOB violations since 1988, 9 resolved and 12 dismissed in DOB's records.
- DOB facade
- Rated Safe in the latest facade report, filed February 18, 2022 (inspection cycle 9). Reports in earlier inspection cycles rated it Safe in 2008, Unsafe in 2016, and Safe with a repair and maintenance program (SWARMP) in 2021.
- DOB permits
- DOB NOW lists 1 work permit here: Sidewalk Shed, issued April 6, 2020, signed off.
- Boiler inspection
- Inspected February 10, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 15 other open violations this page lists without it.
- What each of the 6 city statuses here means, and how many of these carry it.
- How it compares with the 6,545 Manhattan buildings with 20 to 49 apartments.
- All 1 DOB NOW work permit, with job numbers and each job's estimated cost.
- All 11 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 2 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.