528 East 142nd St, Bronx
- Built
- 1915
- Floors
- 5
- Residential units
- 30
- Building type
- Walk-up building
- Zoning district
- R6
- Lot area
- 5,000 sq ft
- Floor area
- 17,680 sq ft
En español: 4 violaciones de Clase C abiertas (peligro inmediato) y 5 abiertas en total. La más antigua del HPD lleva 3 años abierta, desde el 16 de marzo de 2023.
Open now, most hazardous first
- 4Get these certified
Class C, immediately hazardous. Most often Vermin / Infestation.
- 1See it
Class B, hazardous
Certifications are being filed faster than new violations come in. 22 certifications filed against 2 new Class C in the last 180 days.
Since October 12, 2023, certifications were filed on 54 Class C violations, all 54 by the original certify-by date. How certification works
The original certify-by dates on the 5 open HPD violations have all passed. The latest was August 28, 2026. The report prints the date beside each one.
- OATH/ECB summonses
- 8 DOB summonses here since January 1, 2019, with $11,562 in penalties imposed. 5 judgments docketed, the latest on March 31, 2024. A docketed judgment shows up in a title search.
- May 4, 2023, DOB: Failure to provide unobstructed exit passageway. In violation, $1,250 penalty imposed.
- May 4, 2023, DOB: Fail maintain building compliant manner: No fire stopping. In violation, $2,500 penalty imposed.
- May 4, 2023, DOB: Failure to maintain building in code-compliant manner. In violation.
The newest 3 of 8 summonses OATH lists here. The report lists all 8, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOF tax lien sale
- Listed for DOF's 2025 tax lien sale. The last list it appeared on was the 30-day notice of April 2025.
- Housing court
- 1 open housing court case, opened April 1, 2026. 8 housing court cases here since 2009.
- DOB complaints
- 1 DOB complaint in the 12 months to September 25, 2026. It was filed July 15, 2026.
- DOB permits
- DOB NOW lists 5 work permits here, the newest issued August 30, 2024, for General Construction work.
- General Construction, issued August 30, 2024, signed off.
- General Construction, issued May 16, 2024, signed off.
- Plumbing, issued March 8, 2024, signed off.
The newest 3 of 5 permits DOB NOW lists here. The report lists all 5, with job numbers and each job's estimated cost. What the report adds
- Boiler inspection
- Inspected March 13, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed May 4, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair order
- 1 completed HPD emergency repair order since October 12, 2023: a lead paint order, opened February 28, 2024, awarded for $2,000.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 4 open most often Vermin / Infestation | |||
| Vermin / Infestation | Certified on time | 19058685 | 528 East 142nd LLC | |
| Vermin / Infestation | Certified on time | 19058683 | 528 East 142nd LLC | |
| Vermin / Infestation | No access to reinspect (first try) | 16572934 | ||
| Vermin / Infestation | No access to reinspect (first try) | 16572932 | ||
| Class B | 1 open | |||
| Notice sent | 19058684 | 528 East 142nd LLC | ||
The full report on 528 East 142nd St, Bronx
- All 5 open violations, each with the city's own words and the date on its notice.
- What each of the 3 city statuses here means, and how many of these carry it.
- How it compares with the 3,231 Bronx buildings with 20 to 49 apartments.
- All 5 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 8 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.
Get the report on 528 East 142nd St, Bronx, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.