Skip to content
ViolationScout12 open Class C, with nothing filed or new in the last 180 days.Your building
Buildings2026 Gates Avenue, QueensCurrent through

2026 Gates Ave

Ridgewood, Queens, NY 11385

Ridgewood North Historic District

2026 Gates Avenue is a building with stores or offices and 6 apartments, built in 1909. It has 22 open violations, 12 of them Class C, immediately hazardous. The oldest open HPD violation was filed on September 26, 2021.

En español: 12 violaciones de Clase C abiertas (peligro inmediato) y 22 abiertas en total. La más antigua del HPD lleva 5 años abierta, desde el 26 de septiembre de 2021.

Open now, most hazardous first

  1. 12

    Class C, immediately hazardous, filed in the last 3 years

    18 open counting every year, the oldest since

    Get these certified
  2. 10

    Class B, hazardous, filed in the last 3 years. Most often Fire Safety.

    See the 10

20.0 open Class C per 10 apartments. Across the city: 0.7.

Open violations are sitting, with little movement either way. No certification filed and no new Class C violation in the last 180 days.

Since November 27, 2023, certifications were filed on 5 Class C violations: 3 by the original certify-by date, 2 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works

The original certify-by dates on the 22 open HPD violations run from July 28, 2025 to January 11, 2027.

Zoning district
R6B
Lot area
2,508 sq ft
Floor area
6,250 sq ft
Last transfer
No price recorded
Tax lot (BBL)
4-03486-0001

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C12 open
Heat / Hot WaterInvalid certification18606630
§ 27-2033 ADM CODE Provide ready access to buildings heating system door leading to boiler room locked at public hall at 1st story at boiler room, 1st story
Heat / Hot WaterInvalid certification18606627
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Heat / Hot WaterInvalid certification18606626
§ 27-2029 ADM CODE Provide an adequate supply of heat for the apartment in the entire apartment
Heat / Hot WaterCertified late18561641
§ 27-2033 ADM CODE Provide ready access to buildings heating system door leading to boiler room locked at public hall at 1st story at boiler room, 1st story
Heat / Hot WaterCertified late18561640
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Heat / Hot WaterNotice sent18553142
§ 27-2033 ADM CODE Provide ready access to buildings heating system door locked at basement at boiler room
Vermin / InfestationNotice sent to tenant18538445
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
Vermin / InfestationNotice sent to tenant18379769
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
Vermin / InfestationNotice sent to tenant18379763
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
Vermin / InfestationNotice sent to tenant18379761
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
Vermin / InfestationNot complied with18256775
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
Vermin / InfestationNot complied with18049254
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
In HPD's words. Apartment numbers are left out.
Class B10 open most often Fire Safety
Notice sent19399800OKG LLC
Notice sent19399799OKG LLC
Fire SafetyNotice sent19399798OKG LLC
Fire SafetyNotice sent19399797OKG LLC
Notice sent19399796OKG LLC
Notice sent19399795OKG LLC
Heat / Hot WaterNotice sent19399794OKG LLC
MoldNo access to reinspect (first try)18604138
MoldNot complied with18330496
Fire SafetyNot complied with18049255
Is this your building?Also for tenants and buyers
Is this your building?

We read every request ourselves. If we know a firm that handles this kind of work, we'll tell you who, and we only share your details if you say yes.

Your details stay with us. We share them with a firm only if you say yes. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See what's in the report first

Or file it yourself: what it can hold up, and how correction is filed

The building report reads this record for you: the city's wording on each open Class B violation filed in the last 3 years, what each status means, and how the building compares with others its size.

See what's in the report

HPD takes complaints from tenants through 311.

JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix

For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it

HPD and other city records

HPD, by year
From 2017 to 2026, HPD filed 160 violations and closed 118, all classes.
YearFiledClosed
20262222
20252910
202405
20235146
20221316
2021254
201832
20171713
Bedbug report
Filed July 1, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
Rent stabilization
Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.

Hearings and penalties

Housing court
1 open housing court case, opened March 4, 2026. 5 housing court cases here since 2007. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.

DOB records

DOB, all years
8 DOB complaints from 2002 through November 25, 2026. 3 DOB violations since 1993, 3 dismissed in DOB's records.
Boiler inspection
Inspected March 2, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.

The building report

The cover of the sample report, a real Brooklyn building with apartment numbers removed.Page 3 of the sample report, What is open, for the same building.

Get the report, $19 See a sample report

You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is heat and hot water.

Nearby buildings

Questions about this building

Does 2026 Gates Ave have open violations?

Yes. It had 22 open violations on November 25, 2026: 22 from HPD. 12 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 5 years, since September 26, 2021.

Is this building getting better or worse?

Open violations are sitting, with little movement either way. 12 open Class C, with nothing filed or new in the last 180 days. The 180 days run to November 25, 2026.

Everything on this page comes from the city records listed below. A violation closed after the date at the top may still show as open here. If something is wrong, ask for a correction.

Sources. HPD housing violations and OATH/ECB hearing results, plus the neighborhood from HPD and DOB records, HPD's building registrations, HPD's housing court cases, the Rent Guidelines Board's stabilized-building lists, DOB boiler inspection reports, HPD's annual bedbug reports, the city's PLUTO tax-lot file and DOF's property sales records. Open violation counts cover the last 3 years: HPD Class B and C violations still open, and OATH/ECB summonses still active. The city's own pages can show more.

Cite this page

ViolationScout, 2026 Gates Ave, Queens: 6 units, 12 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through November 25, 2026. https://violationscout.com/building/2026-gates-avenue-queens

How we count: /method.

Is this your building?