818 East 166th St
Bronx, NY 10459
818 East 166th Street is a walk-up building with 15 apartments, built in 1904. It has 14 open violations, 7 of them Class C, immediately hazardous. The oldest open HPD violation was filed on October 29, 2024.
En español: 7 violaciones de Clase C abiertas (peligro inmediato) y 14 abiertas en total. La más antigua del HPD lleva 2 años abierta, desde el 29 de octubre de 2024.
Open now, most hazardous first
- 7Get these certified
Class C, immediately hazardous, filed in the last 3 years
- 7See the 7
Class B, hazardous, filed in the last 3 years
4.7 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. 0 certifications filed and 2 new Class C in the last 180 days, too few to call a direction.
Since November 27, 2023, a certification was filed on 1 Class C violation, by the original certify-by date. How certification works
The original certify-by dates on the 14 open HPD violations run from November 30, 2024 to November 29, 2026.
- Zoning district
- R6
- Lot area
- 3,944 sq ft
- Floor area
- 13,000 sq ft
- Tax lot (BBL)
- 2-02679-0021
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 7 open | |||
| Vermin / Infestation | Notice sent | 19327144 | DUNN BEULAH XV L.P | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice | ||||
| Vermin / Infestation | Notice sent | 19199190 | DUNN BEULAH XV L.P | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches at public hall, 2nd story | ||||
| Heat / Hot Water | Not complied with | 17697009 | ||
| § 27-2033 ADM CODE Provide ready access to buildings heating system locked door at boiler room at boiler room | ||||
| No access to reinspect (first try) | 17697007 | |||
| § 27-2005 HMC: Properly repair or replace the broken or defective lower spring balance north 1 window in the 1st room from north | ||||
| Heat / Hot Water | No access to reinspect (first try) | 17697006 | ||
| § 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment | ||||
| Heat / Hot Water | No access to reinspect (first try) | 17697005 | ||
| § 27-2029 ADM CODE Provide an adequate supply of heat for the apartment in the entire apartment | ||||
| Vermin / Infestation | Defect letter sent | 17380865 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 7 open | |||
| Mold | Notice sent to tenant | 18769731 | ||
| Certified late | 18578438 | |||
| Certified late | 18578430 | |||
| Certified late | 18578422 | |||
| No access to reinspect (first try) | 17697008 | |||
| No access to reinspect (first try) | 17697004 | |||
| Not complied with | 17380869 | |||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2019 to 2026, HPD filed 41 violations and closed 24, all classes.
Year Filed Closed 2026 14 11 2025 12 3 2024 5 0 2023 2 6 2022 6 2 2021 1 1 2019 1 1 - Bedbug report
- Filed June 8, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- Tax exemption
- Has a 420-c tax exemption (DOF 2026/27 roll).
Hearings and penalties
- OATH/ECB summonses
- 3 FDNY summonses here since January 1, 2019, with $6,000 in penalties imposed. 2 judgments docketed, the latest on November 16, 2026. A docketed judgment shows up in a title search.
- July 12, 2025, FDNY: Inspection and testing. Decided by default, $5,000 penalty imposed.
- March 8, 2025, FDNY: Inspection and testing. Decided by default, $1,000 penalty imposed.
- May 14, 2019, FDNY: Sign, postings, notices and instructions. In violation.
DOB records
- DOB, all years
- 7 DOB complaints from 2007 through November 25, 2026. 3 DOB violations since 1993, 3 dismissed in DOB's records.
- Boiler inspection
- 2 boilers, both inspected in 2026, the latest on November 4. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 7 other open violations this page lists without it.
- What each of the 6 city statuses here means, and how many of these carry it.
- How it compares with the 3,462 Bronx buildings with 6 to 19 apartments.
- All 3 FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.