2021 Arthur Ave, Bronx
- Built
- 2020
- Floors
- 5
- Residential units
- 18
- Building type
- Walk-up building
- Zoning district
- R7-1
- Lot area
- 3,632 sq ft
- Floor area
- 14,280 sq ft
- Last sale
- $820,000
En español: 5 violaciones de Clase C abiertas (peligro inmediato) y 6 abiertas en total. La más antigua del HPD lleva 2 años abierta, desde el 9 de julio de 2024.
Open now, most hazardous first
- 5Get these certified
Class C, immediately hazardous
- 1See it
Class B, hazardous
Open violations are sitting, with little movement either way. 5 open Class C, with 6 certifications filed and 2 new Class C in the last 180 days, too few to call a direction.
Since October 12, 2023, certifications were filed on 16 Class C violations, all 16 by the original certify-by date. HPD now marks 1 of them False Certification. How certification works
The original certify-by dates on the 6 open HPD violations run from July 29, 2024 to October 19, 2026. The report prints the date beside each one.
- OATH/ECB summonses
- 5 DOB and FDNY summonses here since January 1, 2019, with $1,935 in penalties imposed. 2 judgments docketed, the latest on November 30, 2024. A docketed judgment shows up in a title search.
- May 3, 2023, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms. In violation, $935 penalty imposed.
- March 4, 2023, DOB: Failure to maintain building in code-compliant manner. Dismissed.
- December 31, 2022, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms. In violation.
The newest 3 of 5 summonses OATH lists here. The report lists all 5, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB permits
- DOB NOW lists 3 work permits here, the newest issued September 21, 2020, for Supported Scaffold work.
- Supported Scaffold, issued September 21, 2020, signed off.
- Sidewalk Shed, issued September 21, 2020, signed off.
- Construction Fence, issued November 4, 2019, signed off.
- Certificate of occupancy
- Final, issued August 31, 2021.
- Bedbug report
- Filed December 15, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 5 open | |||
| Certified on time | 19175022 | 2021 ARTHUR AVENUE | ||
| CIV14 mailed | 19175019 | 2021 ARTHUR AVENUE | ||
| Heat / Hot Water | Not complied with | 18363681 | 2021 ARTHUR AVENUE | |
| Vermin / Infestation | Not complied with | 18303306 | 2021 ARTHUR AVENUE | |
| Fire Safety | False certification | 17106526 | ||
| Class B | 1 open | |||
| Certified on time | 19175023 | 2021 ARTHUR AVENUE | ||
The full report on 2021 Arthur Ave, Bronx
- All 6 open violations, each with the city's own words and the date on its notice.
- What each of the 4 city statuses here means, and how many of these carry it.
- How it compares with the 3,460 Bronx buildings with 6 to 19 apartments.
- All 3 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 5 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.
Get the report on 2021 Arthur Ave, Bronx, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.