Skip to content
ViolationScout26 open Class C, with nothing filed or new in the last 180 days.Your building
Buildings298 St Marks Place, Staten IslandCurrent through

298 St Marks Pl

Staten Island, NY 10301

298 St Marks Place is a three-family house, built in 1910. It has 36 open violations, 26 of them Class C, immediately hazardous. The oldest open HPD violation was filed on December 21, 1978.

En español: 26 violaciones de Clase C abiertas (peligro inmediato) y 36 abiertas en total. La más antigua del HPD lleva 47 años abierta, desde el 21 de diciembre de 1978.

Open now, most hazardous first

  1. 26

    Class C, immediately hazardous, filed in the last 3 years

    57 open counting every year, the oldest since

    Get these certified
  2. 4

    Class B, hazardous, filed in the last 3 years. Most often Fire Safety.

    See the 4
  3. 6

    OATH/ECB summonses still active. Most often Construction.

    See the 6

86.7 open Class C per 10 apartments. Across the city: 0.7.

Open violations are sitting, with little movement either way. No certification filed and no new Class C violation in the last 180 days.

The original certify-by dates on the 30 open HPD violations have all passed. The latest was February 18, 2025.

Zoning district
R3A
Lot area
3,700 sq ft
Floor area
2,480 sq ft
Last sale
$350,000
Tax lot (BBL)
5-00019-0035
Neighborhood
St. George-New Brighton

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumber
Class C26 open
Notice sent17640635
§ 27-2005 ADM CODE Provide temporary seal up throughout entire building to all openings
Notice sent17554943
§ 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of unlawful tapping into electrical box at northeast side of building
Notice sent17486301
§ 27-2010, 2011, 2012 ADM CODE Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard
Notice sent17429113
§ 27-2005 ADM CODE Provide seal to all accessible openings of the vacant building
Fire SafetyNotice sent17112120
§ 27-2005, 2050 HMC: Provide an adequate supply of water for the wet sprinkler and/or standpipe system at no water supply at sprinkler system at cellar
Notice sent17112113
§ 27-2026, 2027 HMC: Properly repair the source and abate the evidence of a water leak water supply pipe at cellar
Notice sent17111788
§ 27-2010, 2011, 2012 ADM CODE Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage and household items at rear yard
Notice sent17111508
§ 27-2005 ADM CODE Properly repair with similar material the broken or defective water proofing material at all exterior wall
Notice sent17105212
§ 27-2005 ADM CODE Properly repair with similar material the broken or defective fire retardant material at ceiling. At public hall, 2nd story
Notice sent17105210
§ 27-2005, 2006, 2037 HMC: Properly repair and abate unsafe electric wiring condition consisting of exposed wirres at ceiling at public hall, 2nd story
Notice sent17105207
§ 27-2005 ADM CODE Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
Notice sent17105205
§ 27-2005, 2006, 2037 HMC: Properly repair and abate unsafe electric wiring condition consisting of exposed wire at ceiling at public hall, 3rd story
Notice sent17105204
§ 27-2005 ADM CODE Repair the roof so that it will not leak at ceiling at public hall, 3rd story
Notice sent17105203
§ 27-2005 HMC: Properly repair or replace the broken or defective wood stair case at public hall
Notice sent17105199
§ 27-2026, 2027 HMC: Properly repair the source and abate the evidence of a water leak waste line pipe at cellar
Notice sent17105196
§ 27-2005 HMC: Properly repair or replace the broken or defective boiler at cellar
Notice sent17105182
§ 27-2005, 2006, 2037 HMC: Properly repair and abate unsafe electric wiring condition consisting of exposed wire at ceiling at cellar
Notice sent17105181
§ 27-2005 ADM CODE Properly repair with similar material the broken or defective fire retardant material at ceiling at cellar
Notice sent17105179
§ 27-2005 ADM CODE Provide seal all accessible openings of vacant building
Not complied with16715566
§ 27-2005 ADM CODE Properly repair with similar material the broken or defective brick and mortar at the north wall at stoop
Not complied with16715565
§ 27-2010, 2011, 2012 ADM CODE Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the west rear yard
To be reinspected16660697
§ 27-2010, 2011, 2012 ADM CODE Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the the south and west rear yard
Not complied with16660694
§ 27-2005 ADM CODE Properly repair with similar material the broken or defective brick and mortar wall at north on stoop
Not complied with16660693
§ 27-2005 ADM CODE Replace with new the missing handrail at stoop
Not complied with16660690
§ 27-2005 ADM CODE Properly repair with similar material the broken or defective concrete floor at stoop
Not complied with16660685
§ 27-2005 ADM CODE Properly repair with similar material the broken or defective brick and mortar on stairs leading to stoop
In HPD's words. Apartment numbers are left out.
Class B4 open most often Fire Safety
Notice sent17590961
Fire SafetyNotice sent17112117
Fire SafetyNotice sent17112116
Notice sent17046394
OATH/ECB6 open most often Construction
Construction, Class 1Decided by default39191855N
Construction, Class 2Decided by default39191597J
Construction, Class 1Decided by default39186269Y
Construction, Class 2Decided by default39186268M
Construction, Class 1Decided by default39175215P
Construction, Class 1Decided by default39139286Y
Is this your building?Also for tenants and buyers
Is this your building?

We read every request ourselves. If we know a firm that handles this kind of work, we'll tell you who, and we only share your details if you say yes.

Your details stay with us. We share them with a firm only if you say yes. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See what's in the report first

Or file it yourself: what it can hold up, and how correction is filed

The building report reads this record for you: the city's wording on each open Class B violation filed in the last 3 years, what each status means, and how the building compares with others its size.

See what's in the report

HPD takes complaints from tenants through 311.

JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix

For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it

HPD and other city records

HPD vacate orders
2 HPD vacate orders are in effect here, all for the entire building. The latest, for the entire building, took effect January 7, 2025. Reason on the order: habitability.
Alternative Enforcement Program
In HPD's Alternative Enforcement Program since January 31, 2024.
Open Class C, week by week
26 on September 24, 2026 and 26 on November 15.
HPD, by year
From 2018 to 2026, HPD filed 165 violations and closed 25, all classes.
YearFiledClosed
2026110
202543
2024382
2023908
2022270
202130
202001
201911
201810
Bedbug report
Filed August 18, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.

Hearings and penalties

OATH/ECB summonses
18 DOB and FDNY summonses here since January 1, 2019, with $124,250 in penalties imposed. 6 of them are still active, the same 6 listed under OATH/ECB. 14 judgments docketed, the latest on October 31, 2026. A docketed judgment shows up in a title search.
  • June 8, 2026, DOB: Failure to maintain building in code-compliant manner. Decided by default, $12,500 penalty imposed.
  • June 8, 2026, DOB: Fail to comply with commissioner order to file certificate of correction with DOB. Decided by default, $6,250 penalty imposed.
  • April 28, 2026, DOB: Work does not conform to approved construction documents and/or approved ame. Decided by default, $12,500 penalty imposed.

The newest 3 of 18 summonses OATH lists here.

How a default is vacated

DOF tax lien sale
Listed for DOF's 2025 tax lien sale. The last list it appeared on was the final sale list of June 2025.
Housing court
3 housing court cases here since 2023. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.

DOB records

DOB violations
7 active DOB violations. The newest was issued November 14, 2025.
DOB complaints
6 DOB complaints in the last 12 months. The newest was filed June 3, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
DOB, all years
21 DOB complaints from 1997 through November 25, 2026. 16 DOB violations since 1993, 8 dismissed in DOB's records.
DOB permits
2 DOB work permits in effect. The latest, for Construction Fence work, was issued November 2, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
  • Construction Fence, issued November 2, 2026, in effect until December 18, 2026.
  • General Construction, issued September 23, 2026, in effect until December 18, 2026.
  • General Construction, issued February 19, 2026, expired June 11, 2026.

The building report

The cover of the sample report, a real Brooklyn building with apartment numbers removed.Page 3 of the sample report, What is open, for the same building.

Get the report, $19 See a sample report

You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Nearby buildings

Questions about this building

Does 298 St Marks Pl have open violations?

Yes. It had 36 open violations on November 25, 2026: 6 from OATH/ECB and 30 from HPD. 26 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 47 years, since December 21, 1978.

Is this building getting better or worse?

Open violations are sitting, with little movement either way. 26 open Class C, with nothing filed or new in the last 180 days. The 180 days run to November 25, 2026.

Is an HPD vacate order in effect at this building?

Yes. 2 HPD vacate orders are in effect here, all for the entire building. The latest, for the entire building, took effect January 7, 2025. Reason on the order: habitability. An order stays in effect until HPD rescinds it. HPD Online shows whether it has been rescinded since.

Everything on this page comes from the city records listed below. A violation closed after the date at the top may still show as open here. If something is wrong, ask for a correction.

Sources. HPD housing violations and OATH/ECB hearing results, plus the neighborhood from HPD and DOB records, HPD vacate orders, HPD's Alternative Enforcement Program list, OATH/ECB summonses from DOB and FDNY, DOF's tax lien sale lists, DOB violations, HPD's housing court cases, DOB complaints, DOB NOW work permits, HPD's annual bedbug reports, the city's PLUTO tax-lot file and DOF's property sales records. Open violation counts cover the last 3 years: HPD Class B and C violations still open, and OATH/ECB summonses still active. The city's own pages can show more.

Cite this page

ViolationScout, 298 St Marks Pl, Staten Island: 3 units, 26 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through November 25, 2026. https://violationscout.com/building/298-st-marks-place-staten-island

How we count: /method.

Is this your building?