Skip to content
ViolationScout29 certifications filed against 1 new Class C in the last 180 days.Your building
Buildings40-51 Denman Street, QueensCurrent through

40-51 Denman St

Elmhurst, Queens, NY 11373

40-51 Denman Street is an elevator building with 102 apartments, built in 1951. It has 4 open violations, 3 of them Class C, immediately hazardous. The oldest open HPD violation was filed on April 13, 2024.

En español: 3 violaciones de Clase C abiertas (peligro inmediato) y 4 abiertas en total. La más antigua del HPD lleva 2 años abierta, desde el 13 de abril de 2024.

Open now, most hazardous first

  1. 3

    Class C, immediately hazardous, filed in the last 3 years

    Oldest open since

    Get these certified
  2. 1

    Class B, hazardous, filed in the last 3 years

    See it

0.3 open Class C per 10 apartments. Across the city: 0.7.

Certifications are being filed at least twice as fast as new violations come in. 29 certifications filed against 1 new Class C in the last 180 days.

Since November 27, 2023, certifications were filed on 37 Class C violations: 30 by the original certify-by date, 7 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works

The original certify-by dates on the 4 open HPD violations have all passed. The latest was July 12, 2026.

Zoning district
R4
Lot area
55,214 sq ft
Floor area
82,724 sq ft
Tax lot (BBL)
4-01552-0001

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumber
Class C3 open
Not complied with19042189
§ 27-2005 HMC: Properly repair or replace the broken or defective glass pane at upper and lower sash at 1st window from east at north wall in the 3rd room from east at north
Certified late18937662
§ 27-2005 HMC: Properly repair or replace the broken or defective upper glass pane at the 1st window from west at north in the 1st room from east
Lead PaintNot complied with16883988
§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six
In HPD's words. Apartment numbers are left out.
Class B1 open
Fire SafetyNot complied with17792680
Is this your building?Also for tenants and buyers
Is this your building?

We read every request ourselves. If we know a firm that handles this kind of work, we'll tell you who, and we only share your details if you say yes.

Your details stay with us. We share them with a firm only if you say yes. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See what's in the report first

Or file it yourself: what it can hold up, and how correction is filed

The building report reads this record for you: the city's wording on each open Class B violation filed in the last 3 years, what each status means, and how the building compares with others its size.

See what's in the report

HPD takes complaints from tenants through 311.

JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix

For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it

HPD and other city records

Open Class C, week by week
3 on September 24, 2026 and 3 on November 15.
HPD, by year
From 2017 to 2026, HPD filed 156 violations and closed 200, all classes.
YearFiledClosed
20263435
2025918
20245749
202373
202234
202154
202024
2019319
20182841
2017823
Energy benchmarking
ENERGY STAR score 60 for 2025, against a median of 69 for Multifamily Housing that year.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
Bedbug report
Filed December 29, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
Rent stabilization
Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.

Hearings and penalties

OATH/ECB summonses
5 DOB and FDNY summonses here since January 1, 2019, with $3,122 in penalties imposed. 1 judgment docketed, on July 31, 2025. A docketed judgment shows up in a title search.
  • October 1, 2024, DOB: Miscellaneous violations. In violation, $1,250 penalty imposed.
  • August 1, 2022, DOB: Failure to maintain elevator or conveying system. In violation, $312 penalty imposed.
  • June 27, 2022, DOB: Failure to maintain building in code-compliant manner. In violation, $1,250 penalty imposed.

The newest 3 of 5 summonses OATH lists here.

Housing court
2 housing court cases here since 2005, most of them tenant actions. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.

DOB records

DOB complaints
1 DOB complaint in the last 12 months. It was filed March 3, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
DOB, all years
36 DOB complaints from 2012 through November 25, 2026. 35 DOB violations since 1988, 35 resolved in DOB's records.
DOB facade
Rated Safe in the latest facade report, filed July 3, 2023 (inspection cycle 9). Reports in earlier inspection cycles rated it Safe in 2006, 2012 and 2019.
DOB permits
1 DOB work permit in effect, for Curb Cut work, issued September 14, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
  • Curb Cut, issued September 14, 2026, in effect until March 4, 2027.
  • Sprinklers, issued November 19, 2025, expired November 19, 2026.
  • Sprinklers, issued November 19, 2025, expired November 19, 2026.

The newest 3 of 4 permits DOB NOW lists here.

Boiler inspection
Inspected August 15, 2025. Boilers in buildings with 6 or more apartments are inspected every calendar year.

The building report

The cover of the sample report, a real Brooklyn building with apartment numbers removed.Page 3 of the sample report, What is open, for the same building.

Get the report, $19 See a sample report

You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Nearby buildings

Questions about this building

Does 40-51 Denman St have open violations?

Yes. It had 4 open violations on November 25, 2026: 4 from HPD. 3 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 2 years, since April 13, 2024.

Is this building getting better or worse?

Certifications are being filed at least twice as fast as new violations come in. 29 certifications filed against 1 new Class C in the last 180 days. The 180 days run to November 25, 2026.

Everything on this page comes from the city records listed below. A violation closed after the date at the top may still show as open here. If something is wrong, ask for a correction.

Sources. HPD housing violations and OATH/ECB hearing results, plus the neighborhood from HPD and DOB records, OATH/ECB summonses from DOB and FDNY, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Open violation counts cover the last 3 years: HPD Class B and C violations still open, and OATH/ECB summonses still active. The city's own pages can show more.

Cite this page

ViolationScout, 40-51 Denman St, Queens: 102 units, 3 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through November 25, 2026. https://violationscout.com/building/40-51-denman-street-queens

How we count: /method.

Is this your building?