520 West 151st St
Manhattan, NY 10031
520 West 151st Street is a walk-up building with 19 apartments, built in 1905. It has 8 open violations, 5 of them Class C, immediately hazardous. The oldest open HPD violation was filed on July 11, 2023.
En español: 5 violaciones de Clase C abiertas (peligro inmediato) y 8 abiertas en total. La más antigua del HPD lleva 3 años abierta, desde el 11 de julio de 2023.
Open now, most hazardous first
- 5Get these certified
Class C, immediately hazardous, filed in the last 3 years
- 3See the 3
Class B, hazardous, filed in the last 3 years
2.6 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.
Since November 27, 2023, certifications were filed on 9 Class C violations, all 9 by the original certify-by date. How certification works
The original certify-by dates on the 8 open HPD violations have all passed. The latest was November 4, 2026.
- Zoning district
- R7A
- Lot area
- 3,997 sq ft
- Floor area
- 13,535 sq ft
- Last transfer
- No price recorded
- Tax lot (BBL)
- 1-02082-0047
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 5 open | |||
| Fire Safety | Notice sent | 19308959 | BROADWAY 151 MANAGER LLC | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door at public hall stairs, 5th story | ||||
| Vermin / Infestation | No access to reinspect (first try) | 18340091 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Mold | No access to reinspect (first try) | 18340089 | ||
| § 27-2017.3 HMC: Trace and repair the source and abate the visible mold condition... Ceiling, east , south and west walls in the bathroom | ||||
| No access to reinspect (first try) | 18340088 | |||
| § 27-2005 ADM CODE Properly repair with similar material the broken or defective ceramic floor tilies in the bathroom | ||||
| Heat / Hot Water | No access to reinspect (first try) | 18319205 | ||
| § 27-2031 ADM CODE Provide hot water at all hot water fixtures in the 4th room from north | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 3 open | |||
| Mold | Not complied with | 19214368 | ||
| No access to reinspect (first try) | 18524767 | |||
| No access to reinspect (first try) | 18340090 | |||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2017 to 2026, HPD filed 204 violations and closed 213, all classes.
Year Filed Closed 2026 18 43 2025 33 3 2024 10 12 2023 27 23 2022 4 15 2021 16 2 2020 0 6 2019 4 13 2018 66 84 2017 26 12 - Bedbug report
- Filed February 23, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- Tax exemption
- Has a 420-c tax exemption (DOF 2026/27 roll).
Hearings and penalties
- OATH/ECB summonses
- 2 DOB summonses here since January 1, 2019, with $2,225 in penalties imposed. 1 judgment docketed, on May 31, 2024. A docketed judgment shows up in a title search.
- April 26, 2023, DOB: Unapproved unsafe unsuitable electrical equipment or wiring in use. In violation, $1,600 penalty imposed.
- April 30, 2020, DOB: Fail maintain building in compliant manner: Service equipment - boiler. In violation, $625 penalty imposed.
- Housing court
- 5 housing court cases here since 2011, most of them heat and hot water cases. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB complaints
- 1 DOB complaint in the last 12 months. It was filed December 26, 2025. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 4 DOB complaints from 2009 through November 25, 2026. 4 DOB violations since 1995, 4 dismissed in DOB's records.
- DOB permits
- DOB NOW lists 3 work permits here, the newest issued May 9, 2023, for Plumbing work.
- Plumbing, issued May 9, 2023, expired May 9, 2024.
- Boiler Equipment, issued October 5, 2022, signed off.
- Boiler Equipment, issued January 28, 2022, signed off.
The building report
- The city's wording on the 3 other open violations this page lists without it.
- What each of the 3 city statuses here means, and how many of these carry it.
- How it compares with the 11,097 Manhattan buildings with 6 to 19 apartments.
- All 3 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 2 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.