Skip to content
ViolationScout14 open Class C, with 6 certifications filed and 3 new Class C in the last 180 days, too few to call a direction.Is this your building?
Buildings60 2 Avenue, ManhattanCurrent through

60 2nd Ave, Manhattan

BBL 1-00445-0004

En español: 14 violaciones de Clase C abiertas (peligro inmediato) y 58 abiertas en total.

Open violations are sitting, with little movement either way. 14 open Class C, with 6 certifications filed and 3 new Class C in the last 180 days, too few to call a direction.

Since September 28, 2023, certifications were filed on 51 Class C violations, all 51 by the original certify-by date. HPD now marks 4 of them False Certification. How certification works

Is this your building?

14 open Class C.

We read every request ourselves. When a compliance firm we work with can take the building, we introduce you to that one firm. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: which violations matter, and how long this kind usually takes to clear. It is not on sale yet.

See what the report covers

HPD takes complaints from tenants through 311.

DOB violations
3 active DOB violations, most of them for elevators. The newest was issued June 3, 2020.
DOB complaints
1 DOB complaint in the last 12 months. It was filed December 16, 2025.
DOB facade
Rated SWARMP in the latest facade report, filed July 29, 2025 (inspection cycle 10). SWARMP means safe with a repair and maintenance program. Need this filed?
Rent stabilization
Has rent-stabilized apartments (2024 registration).

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C14 open most often Vermin / Infestation
To be reinspected1912097360-62 SECOND AVE LLC
Vermin / InfestationNot complied with1881825060-62 SECOND AVE LLC
Heat / Hot WaterNot complied with1881824960-62 SECOND AVE LLC
Heat / Hot WaterFalse certification1855424660-62 SECOND AVE LLC
Heat / Hot WaterFalse certification1854668460-62 SECOND AVE LLC
Vermin / InfestationFalse certification18085548
Heat / Hot WaterNot complied with18074158
Fire SafetyTo be reinspected18073556
Vermin / InfestationNot complied with17980035
Vermin / InfestationNot complied with17953931
Not complied with17890037
Not complied with17890034
Vermin / InfestationFalse certification17889621
Fire SafetyNot complied with17709261
Class B44 open most often Mold
To be reinspected1912097560-62 SECOND AVE LLC
Notice sent1912097460-62 SECOND AVE LLC
False certification18149095
False certification18149093
False certification18149092
MoldNo access to reinspect (first try)18149081
False certification18149079
False certification18085547
False certification18085546
False certification18085545
MoldNot complied with18339509
Not complied with18059174
Not complied with18059173
False certification18059169
False certification18059167
False certification18059166
False certification18059161
Not complied with17980045
Not complied with17980043
Not complied with17980041
Not complied with17980039
Not complied with17980038
Not complied with17980036
Not complied with17980032
Not complied with17980031
Not complied with17980029
Not complied with17890051
Not complied with17890049
Not complied with17890040
Not complied with17890038
Not complied with17889905
Not complied with17889902
Not complied with17889895
Not complied with17889891
Not complied with17889888
Not complied with17889887
Not complied with17889886
Not complied with17889882
Not complied with17889644
Not complied with17889639
Not complied with17889635
Not complied with17889632
Not complied with17889625
Not complied with17889624

The most common category among the open records here is vermin and pests.

Nearby buildings

Questions about this building

Does 60 2 Avenue, Manhattan have open violations?

Yes. 60 2 Avenue, Manhattan had 58 open violations on September 26, 2026: 58 from HPD. 14 are Class C, the class HPD treats as immediately hazardous.

Is 60 2 Avenue, Manhattan getting better or worse?

Open violations are sitting, with little movement either way. 14 open Class C, with 6 certifications filed and 3 new Class C in the last 180 days, too few to call a direction. That window ends September 26, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 60 2 Avenue, Manhattan?

Since September 28, 2023, certifications were filed on 51 Class C violations, all 51 by the original certify-by date. HPD now marks 4 of them False Certification. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 60 2 Avenue, Manhattan have active DOB violations?

Yes. 3 active DOB violations, most of them for elevators. The newest was issued June 3, 2020. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has DOB received complaints about 60 2 Avenue, Manhattan?

Yes. 1 DOB complaint in the last 12 months. It was filed December 16, 2025. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

What did the latest facade report find at 60 2 Avenue, Manhattan?

Rated SWARMP in the latest facade report, filed July 29, 2025 (inspection cycle 10). SWARMP means safe with a repair and maintenance program. Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

Is 60 2 Avenue, Manhattan rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 60 2 Avenue, Manhattan built?

The city's record gives 1899 as the year 60 2 Avenue, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator apartment building with 6 floors.

How many apartments does 60 2 Avenue, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 24 residential units at 60 2 Avenue, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings and the city's PLUTO tax-lot file. This page is current through September 26, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 60 2nd Ave, Manhattan: 14 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 26, 2026. https://violationscout.com/building/60-2-avenue-manhattan

How we count: /method.

Is this your building?