60 Pinehurst Ave
Washington Heights, Manhattan, NY 10033
60 Pinehurst Avenue is a walk-up building with 25 apartments, built in 1912. It has 21 open violations, 8 of them Class C, immediately hazardous. The oldest open HPD violation was filed on January 11, 2022.
En español: 8 violaciones de Clase C abiertas (peligro inmediato) y 21 abiertas en total. La más antigua del HPD lleva 4 años abierta, desde el 11 de enero de 2022.
Open now, most hazardous first
- 8Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Mold.
- 13See the 13
Class B, hazardous, filed in the last 3 years. Most often Mold.
3.2 open Class C per 10 apartments. Across the city: 0.7.
Certifications are being filed at least twice as fast as new violations come in. 12 certifications filed against 0 new Class C in the last 180 days.
Since November 16, 2023, certifications were filed on 53 Class C violations: 51 by the original certify-by date, 2 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works
The original certify-by dates on 16 of the 21 open HPD violations have all passed. The latest was May 12, 2026.
- Zoning district
- R7-2
- Lot area
- 5,775 sq ft
- Floor area
- 23,400 sq ft
- Last sale
- $9,040,000
- Tax lot (BBL)
- 1-02177-0130
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 8 open most often Mold | |||
| Mold | Defect letter sent | 18660346 | ||
| Mold | Defect letter sent | 18394653 | ||
| § 27-2017.3 HMC: Trace and repair the source and abate the visible mold condition... Greater than 30 sq ft at ceiling in the 2nd bathroom from east | ||||
| Mold | Defect letter sent | 18394650 | ||
| § 27-2017.3 HMC: Trace and repair the source and abate the visible mold condition... Greater than 30 sq ft at all walls and north closet walls and ceiling in the 1st room from north | ||||
| Vermin / Infestation | Defect letter sent | 18367206 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Vermin / Infestation | Defect letter sent | 18367204 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Mold | Defect letter sent | 18367201 | ||
| § 27-2017.3 HMC: Trace and repair the source and abate the visible mold condition... Greater than 30 sq ft at ceiling in the 2nd bathroom from east | ||||
| Mold | Defect letter sent | 18367198 | ||
| § 27-2017.3 HMC: Trace and repair the source and abate the visible mold condition... Greater than 30 sq ft at all walls, north closet ceiling and walls and ceiling in the 1st room from north | ||||
| Vermin / Infestation | Defect letter sent | 17416997 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 13 open most often Mold | |||
| Open | 19377926 | 815 WEST 180TH GROUP LLC | ||
| Open | 19377922 | 815 WEST 180TH GROUP LLC | ||
| Open | 19377900 | 815 WEST 180TH GROUP LLC | ||
| Open | 19377890 | 815 WEST 180TH GROUP LLC | ||
| Open | 19377883 | 815 WEST 180TH GROUP LLC | ||
| Mold | Defect letter sent | 18739505 | ||
| Mold | Defect letter sent | 18739504 | ||
| Mold | Defect letter sent | 18716821 | ||
| Mold | Defect letter sent | 18367199 | ||
| Mold | Defect letter sent | 18253424 | ||
| Not complied with | 17909051 | |||
| Not complied with | 17909050 | |||
| Mold | Defect letter sent | 18237071 | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 16 on September 24, 2026 and 14 on November 8.
- HPD, by year
- From 2017 to 2026, HPD filed 743 violations and closed 767, all classes.
Year Filed Closed 2026 37 112 2025 139 179 2024 82 56 2023 143 80 2022 47 63 2021 32 24 2020 4 31 2019 149 192 2018 100 11 2017 10 19 - Bedbug report
- Filed January 1, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- HPD emergency repair orders
- 2 completed HPD emergency repair orders since November 16, 2023, awarded for $950 in total. The most recent of the 2, a general construction order, was opened January 3, 2025. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- OATH/ECB summonses
- 3 DOB summonses here since January 1, 2019, with $800 in penalties imposed. 1 judgment docketed, on October 31, 2020. A docketed judgment shows up in a title search.
- September 13, 2024, DOB: Unapproved unsafe unsuitable electrical equipment or wiring in use. In violation.
- September 13, 2024, DOB: Electrical work without a permit. Dismissed.
- September 16, 2019, DOB: Unapproved unsafe unsuitable electrical equipment or wiring in use. In violation, $800 penalty imposed.
- Housing court
- 1 housing court case here, opened in 2023. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB, all years
- 63 DOB complaints through November 14, 2026. 9 DOB violations since 1997, 9 dismissed in DOB's records.
- DOB permits
- DOB NOW lists 10 work permits here, the newest issued April 3, 2025, for Structural work.
- Structural, issued April 3, 2025, signed off.
- Sidewalk Shed, issued January 30, 2025, signed off.
- General Construction, issued July 11, 2024, signed off.
The newest 3 of 10 permits DOB NOW lists here.
- Boiler inspection
- Inspected March 10, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 14 other open violations this page lists without it.
- What each of the 3 city statuses here means, and how many of these carry it.
- How it compares with the 6,545 Manhattan buildings with 20 to 49 apartments.
- All 10 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 3 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.