Skip to content
ViolationScout29 certifications filed against 10 new Class C in the last 180 days.Your building
Buildings635 Morris Avenue, BronxCurrent through

635 Morris Ave

Melrose, Bronx, NY 10451

635 Morris Avenue is an elevator building with 216 apartments, built in 1983. It has 45 open violations, 14 of them Class C, immediately hazardous. The oldest open HPD violation was filed on June 11, 2023.

En español: 14 violaciones de Clase C abiertas (peligro inmediato) y 45 abiertas en total. La más antigua del HPD lleva 3 años abierta, desde el 11 de junio de 2023.

Open now, most hazardous first

  1. 14

    Class C, immediately hazardous, filed in the last 3 years. Most often Vermin / Infestation.

    15 open counting every year, the oldest since

    Get these certified
  2. 29

    Class B, hazardous, filed in the last 3 years. Most often Fire Safety.

    See the 29
  3. 2

    OATH/ECB summonses still active

    See the 2

0.6 open Class C per 10 apartments. Across the city: 0.7.

Certifications are being filed at least twice as fast as new violations come in. 29 certifications filed against 10 new Class C in the last 180 days.

Since November 16, 2023, certifications were filed on 66 Class C violations, all 66 by the original certify-by date. How certification works

The original certify-by dates on the 43 open HPD violations run from August 19, 2024 to December 1, 2026.

Zoning district
R7-2
Lot area
131,046 sq ft
Floor area
257,718 sq ft
Tax lot (BBL)
2-02441-0001

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C14 open most often Vermin / Infestation
Fire SafetyNot complied with19291708MARIA LOPEZ, L.P.
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective at compactor chute door at public hall, 3rd story
Vermin / InfestationCIV14 mailed19291705MARIA LOPEZ, L.P.
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
Vermin / InfestationCIV14 mailed19291704MARIA LOPEZ, L.P.
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
Vermin / InfestationCIV14 mailed19262793MARIA LOPEZ, L.P.
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
Vermin / InfestationCIV14 mailed19203931
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
Vermin / InfestationCIV14 mailed19203110
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
No access to reinspect (first try)19203105
§ 27-2005 HMC: Properly repair or replace the broken or defective lock and assembly at apartment entrance door in the entrance
Fire SafetyNot complied with19154920
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective bent door in the entrance
Notice sent19121962
§ 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of purtruding screw head at 4th tread up from bottom creating a trip hazard in the private hallway
Vermin / InfestationNotice sent to tenant19068586
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
Fire SafetyNot complied with18748381
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective latch set in the entrance
Heat / Hot WaterNot complied with18608420
§ 27-2033 ADM CODE Provide ready access to buildings heating system locked door at boiler room
Heat / Hot WaterNot complied with18509562
§ 27-2033 ADM CODE Provide ready access to buildings heating system door locked at boiler room
Vermin / InfestationNot complied with17718952
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
In HPD's words. Apartment numbers are left out.
Class B29 open most often Fire Safety
Fire SafetyNotice sent19291707MARIA LOPEZ, L.P.
Notice sent19291706MARIA LOPEZ, L.P.
CIV14 mailed19262792MARIA LOPEZ, L.P.
MoldCIV14 mailed19262791MARIA LOPEZ, L.P.
CIV14 mailed19242416MARIA LOPEZ, L.P.
CIV14 mailed19225704
CIV14 mailed19203111
MoldCIV14 mailed19203107
No access to reinspect (first try)19203106
Notice sent19203103
Notice sent19203102
CIV14 mailed19203101
CIV14 mailed19203100
Certified on time19154919
No access to reinspect (first try)19121952
No access to reinspect (first try)19121943
No access to reinspect (first try)19121941
No access to reinspect (first try)19121927
Notice sent19068584
Notice sent18392577
Notice sent18392576
Notice sent18392575
Notice sent18392574
Not complied with17630992
Not complied with17341299
No access to reinspect (first try)17199360
No access to reinspect (first try)17199358
Fire SafetyNot complied with17088760
Fire SafetyNot complied with17088758
OATH/ECB2 open
Construction, Class 2Hearing pending35730152L
Local Law, Class 2Hearing pending37036839K
Is this your building?Also for tenants and buyers
Is this your building?

2 OATH hearings starting November 20, 2026.

We read every request ourselves. If we know a firm that handles this kind of work, we'll tell you who, and we only share your details if you say yes.

Your details stay with us. We share them with a firm only if you say yes. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See what's in the report first

Or file it yourself: what it can hold up, and how correction is filed

The building report reads this record for you: the city's wording on each open Class B violation filed in the last 3 years, what each status means, and how the building compares with others its size.

See what's in the report

HPD takes complaints from tenants through 311.

JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix

For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it

HPD and other city records

Open Class C, week by week
10 on September 24, 2026 and 14 on November 8.
HPD, by year
From 2017 to 2026, HPD filed 519 violations and closed 503, all classes.
YearFiledClosed
20266844
20254693
20247751
20234749
20224562
2021129109
2020417
20191822
20182924
20171942
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
Bedbug report
Filed December 11, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
Tax exemption
Has a redevelopment company tax exemption (DOF 2026/27 roll).

Hearings and penalties

OATH hearings
2 hearings scheduled on DOB summonses, the first on November 20, 2026.
OATH/ECB summonses
11 DOB and FDNY summonses here since January 1, 2019, with $13,100 in penalties imposed. 2 of them are still active, the same 2 listed under OATH/ECB.
  • September 10, 2026, DOB: Failure to maintain building walls or appurtenances. $2,500 penalty imposed.
  • July 7, 2026, DOB: Failure to maintain building walls or appurtenances. In violation.
  • April 20, 2026, DOB: Fail to file amendment acceptable report to correct unsafe conditions. $1,250 penalty imposed.

The newest 3 of 11 summonses OATH lists here.

Housing court
11 housing court cases here since 2008. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.

DOB records

DOB violations
3 active DOB violations. The newest was issued May 7, 2025.
DOB complaints
1 DOB complaint in the last 12 months. It was filed February 2, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
DOB, all years
51 DOB complaints from 1994 through November 14, 2026. 64 DOB violations since 1992, 29 resolved and 32 dismissed in DOB's records.
DOB facade
DOB lists this facade as Unsafe for inspection cycle 9. The latest report, filed October 22, 2026, rates it Safe. An earlier report in this cycle, filed February 26, 2025, rated it Unsafe. Reports in earlier inspection cycles rated it Unsafe in 2007, Safe in 2010, Unsafe in 2012, and Safe with a repair and maintenance program (SWARMP) in 2014 and 2019.
DOB permits
1 DOB work permit in effect, for General Construction work, issued January 20, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
  • General Construction, issued January 20, 2026, in effect until December 26, 2026.
  • Suspended Scaffold, issued July 9, 2025, signed off.
  • Sidewalk Shed, issued January 7, 2025, signed off.

The newest 3 of 4 permits DOB NOW lists here.

Boiler inspection
5 boilers, all inspected in 2026, the latest on April 2. Boilers in buildings with 6 or more apartments are inspected every calendar year.

The building report

The cover of the sample report, a real Brooklyn building with apartment numbers removed.Page 3 of the sample report, What is open, for the same building.

Get the report, $19 See a sample report

You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is vermin and pests.

Nearby buildings

Questions about this building

Does 635 Morris Ave have open violations?

Yes. It had 45 open violations on November 14, 2026: 43 from HPD and 2 from OATH/ECB. 14 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 3 years, since June 11, 2023.

Is this building getting better or worse?

Certifications are being filed at least twice as fast as new violations come in. 29 certifications filed against 10 new Class C in the last 180 days. The 180 days run to November 14, 2026.

Everything on this page comes from the city records listed below. A violation closed after the date at the top may still show as open here. If something is wrong, ask for a correction.

Sources. HPD housing violations and OATH/ECB hearing results, plus the neighborhood from HPD and DOB records, HPD's building registrations, OATH hearing dates, OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, DOF's exemption rolls, DOB facade filings, DOB NOW work permits, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Open violation counts cover the last 3 years: HPD Class B and C violations still open, and OATH/ECB summonses still active. The city's own pages can show more.

Cite this page

ViolationScout, 635 Morris Ave, Bronx: 216 units, 14 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through November 14, 2026. https://violationscout.com/building/635-morris-avenue-bronx

How we count: /method.

Is this your building?