Skip to content
ViolationScout103 certifications filed against 5 new Class C in the last 180 days.Your building
Buildings765 East 175 Street, BronxCurrent through

765 East 175th St

Tremont, Bronx, NY 10460

765 East 175th Street is an elevator building with 49 apartments, built in 1935. It has 68 open violations, 12 of them Class C, immediately hazardous. The oldest open HPD violation was filed on September 29, 2005.

En español: 12 violaciones de Clase C abiertas (peligro inmediato) y 68 abiertas en total. La más antigua del HPD lleva 21 años abierta, desde el 29 de septiembre de 2005.

Open now, most hazardous first

  1. 12

    Class C, immediately hazardous, filed in the last 3 years

    36 open counting every year, the oldest since

    Get these certified
  2. 49

    Class B, hazardous, filed in the last 3 years. Most often Mold.

    See the 49
  3. 7

    OATH/ECB summonses still active. Most often Construction.

    See the 7

2.4 open Class C per 10 apartments. Across the city: 0.7.

Certifications are being filed at least twice as fast as new violations come in. 103 certifications filed against 5 new Class C in the last 180 days.

Since November 16, 2023, certifications were filed on 56 Class C violations, all 56 by the original certify-by date. HPD now marks 2 of them False Certification. How certification works

The original certify-by dates on the 61 open HPD violations have all passed. The latest was November 9, 2026.

Zoning district
R7-1
Lot area
10,710 sq ft
Floor area
47,826 sq ft
Tax lot (BBL)
2-02953-0001

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C12 open
Certified on time19162950
§ 27-2005 ADM CODE Properly secure the loose cracked concrete tread 3rd up from bottom at bulkhead landing at public hall stairs, 6th story
Certified on time19162947
§ 27-2005, 2007 ADM CODE Remove the illegal fastening pushbar lock installed on roof door that doesn't allow re-entry from roof to bulkhead at public hall, 6th story
Certified on time19162946
§ 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of discarded washing machine with the doors attached at west wall at public hall, 6th story
Fire SafetyFalse certification19082761
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective [latch set] door to roof at 6th story at public hall
Fire SafetyFalse certification19082760
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective [hinge] door to roof at bulkhead at 6th story at public hall
Notice sent17798262
§ 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures no gas at range. Gas shut off for repairs in the kitchen
Notice sent17657035
§ 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures no gas supply to the gas range in the kitchen
Notice sent17453361
§ 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures no gas to range at west wall in the kitchen
Notice sent17438392
§ 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at stove in the kitchen
Structural HazardNotice sent17255353
§ 27-2005 ADM CODE Make safe by properly repairing the structural defect brick and mortyr at north west corner fascade of building from 6th story to top of parapet wall , 1st story
Vermin / InfestationNot complied with17094212
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
Vermin / InfestationNot complied with17094211
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
In HPD's words. Apartment numbers are left out.
Class B49 open most often Mold
Certified on time19228983765 EAST 175TH STREET, LLC
CIV14 mailed19205764
CIV14 mailed19205763
CIV14 mailed19205762
CIV14 mailed19205761
Certified on time19173399
Certified on time19162948
Certified on time19162944
Notice sent19162942
Notice sent19162941
Notice sent19162940
Certified on time19142168
CIV14 mailed19128080
CIV14 mailed19128079
CIV14 mailed19094596
CIV14 mailed19094595
CIV14 mailed19094594
CIV14 mailed19094593
CIV14 mailed19094592
CIV14 mailed19094591
CIV14 mailed19094590
CIV14 mailed19094589
CIV14 mailed19094587
CIV14 mailed19094586
Certified on time19082762
Certified on time19082759
Notice sent19082757
MoldCIV14 mailed19226386
MoldNo access to reinspect (first try)17832706
Not complied with17832678
Not complied with17819469
MoldNo access to reinspect (first try)17819460
Notice sent17660006
Not complied with17660004
Not complied with17660003
Not complied with17660002
Notice sent17453366
Notice sent17453365
Notice sent17453364
Notice sent17453363
Notice sent17453354
Notice sent17430513
Notice sent17094222
Notice sent17094221
Notice sent17094218
Notice sent17094217
Notice sent17094216
Notice sent17094213
Notice sent16534961
OATH/ECB7 open most often Construction
Construction, Class 2Hearing pending39555989N
Construction, Class 1Hearing pending35729717L
Construction, Class 1Found in violation35694027R
Construction, Class 2Found in violation37033185R
Construction, Class 1Found in violation35689206X
Construction, Class 2Settled by agreement35682081J
Construction, Class 1Found in violation39100272P
Is this your building?Also for tenants and buyers
Is this your building?

2 OATH hearings starting December 11, 2026.

We read every request ourselves. If we know a firm that handles this kind of work, we'll tell you who, and we only share your details if you say yes.

Your details stay with us. We share them with a firm only if you say yes. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See what's in the report first

Or file it yourself: what it can hold up, and how correction is filed

The building report reads this record for you: the city's wording on each open Class B violation filed in the last 3 years, what each status means, and how the building compares with others its size.

See what's in the report

HPD takes complaints from tenants through 311.

JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix

For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it

HPD and other city records

Open Class C, week by week
12 on September 24, 2026 and 12 on November 8.
HPD, by year
From 2017 to 2026, HPD filed 528 violations and closed 411, all classes.
YearFiledClosed
202612581
20257487
20246857
20238529
2022285
20212317
2020235
2019377
20184617
20175336
Energy benchmarking
ENERGY STAR score 9 for 2024, against a median of 67 for Multifamily Housing that year.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
Bedbug report
Filed December 18, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
Rent stabilization
Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
HPD emergency repair orders
2 completed HPD emergency repair orders since November 16, 2023, awarded for $7,250 in total. The most recent of the 2, a general construction order, was opened December 15, 2023. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.

Hearings and penalties

OATH hearings
2 hearings scheduled on DOB summonses, the first on December 11, 2026.
OATH/ECB summonses
25 DOB summonses here since January 1, 2019, with $41,187 in penalties imposed. 7 of them are still active, the same 7 listed under OATH/ECB. 13 judgments docketed, the latest on December 31, 2025. A docketed judgment shows up in a title search.
  • June 30, 2026, DOB: Pedestrian protection does not meet code specifications. Adjourned, $2,400 penalty imposed.
  • May 7, 2026, DOB: Failure to maintain building walls or appurtenances. $12,500 penalty imposed.
  • October 29, 2025, DOB: Failure to maintain elevator or conveying system. In violation.

The newest 3 of 25 summonses OATH lists here.

Housing court
4 housing court cases here since 2010, most of them tenant actions. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.

DOB records

DOB violations
4 active DOB violations. The newest was issued March 5, 2025.
DOB complaints
1 DOB complaint in the last 12 months. It was filed June 29, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
DOB, all years
88 DOB complaints from 1996 through November 14, 2026. 37 DOB violations since 1988, 22 resolved and 11 dismissed in DOB's records.
DOB facade
No Report Filed for inspection cycle 9.
DOB permits
1 DOB work permit in effect, for Sidewalk Shed work, issued January 20, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
  • Sidewalk Shed, issued January 20, 2026, in effect until January 20, 2027.
  • Mechanical Systems, issued August 5, 2024, expired October 15, 2024.
  • Sidewalk Shed, issued August 10, 2020, signed off.
Boiler inspection
Inspected October 20, 2025. Boilers in buildings with 6 or more apartments are inspected every calendar year.

The building report

The cover of the sample report, a real Brooklyn building with apartment numbers removed.Page 3 of the sample report, What is open, for the same building.

Get the report, $19 See a sample report

You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Nearby buildings

Questions about this building

Does 765 East 175th St have open violations?

Yes. It had 68 open violations on November 14, 2026: 61 from HPD and 7 from OATH/ECB. 12 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 21 years, since September 29, 2005.

Is this building getting better or worse?

Certifications are being filed at least twice as fast as new violations come in. 103 certifications filed against 5 new Class C in the last 180 days. The 180 days run to November 14, 2026.

Everything on this page comes from the city records listed below. A violation closed after the date at the top may still show as open here. If something is wrong, ask for a correction.

Sources. HPD housing violations and OATH/ECB hearing results, plus the neighborhood from HPD and DOB records, HPD's building registrations, OATH hearing dates, OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Open violation counts cover the last 3 years: HPD Class B and C violations still open, and OATH/ECB summonses still active. The city's own pages can show more.

Cite this page

ViolationScout, 765 East 175th St, Bronx: 49 units, 12 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through November 14, 2026. https://violationscout.com/building/765-east-175-street-bronx

How we count: /method.

Is this your building?