The most common category among the open records here is lead paint.
Questions about this building
Does 850 St Marks Avenue, Brooklyn have open violations?
Yes. 850 St Marks Avenue, Brooklyn had 23 open violations on September 26, 2026: 3 from OATH/ECB and 20 from HPD. 12 are Class C, the class HPD treats as immediately hazardous.
Is 850 St Marks Avenue, Brooklyn getting better or worse?
Open violations are sitting, with little movement either way. 12 open Class C, with 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction. That window ends September 26, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.
When were certifications filed on Class C violations at 850 St Marks Avenue, Brooklyn?
Since September 28, 2023, a certification was filed on 1 Class C violation, after the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.
Does 850 St Marks Avenue, Brooklyn have an OATH hearing coming up?
Yes. A hearing on a DOB summons is set for October 7, 2026. DOB summonses are heard at OATH, the city's hearings office, and OATH can move a hearing to a later date. When nobody shows up, the summons is decided by default, the costliest way one ends.
Does 850 St Marks Avenue, Brooklyn have active DOB violations?
Yes. 6 active DOB violations. The newest was issued July 5, 2023. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.
Is 850 St Marks Avenue, Brooklyn in housing court?
Yes. 1 open housing court case, opened June 17, 2025. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.
Are any HPD emergency repair orders at 850 St Marks Avenue, Brooklyn marked completed?
Yes. 1 completed HPD emergency repair order since September 28, 2023: a general construction order, opened June 13, 2026, awarded for $546. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.
What did the latest facade report find at 850 St Marks Avenue, Brooklyn?
Rated Unsafe in the latest facade report, filed September 16, 2026 (inspection cycle 10). Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.
Are any DOB work permits in effect at 850 St Marks Avenue, Brooklyn?
Yes. 1 DOB work permit in effect, for Sidewalk Shed work, issued November 25, 2025. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.
What is the ENERGY STAR score for 850 St Marks Avenue, Brooklyn?
ENERGY STAR score 79 for 2024, against a median of 67 for Multifamily Housing that year. Buildings over 25,000 square feet report their energy use to the city every year under Local Law 84. The ENERGY STAR score runs from 1 to 100 and compares a building with similar ones nationwide; 50 is the national median. The score is the one the city publishes, and this page never estimates a Local Law 97 emissions penalty. A lot that reported several properties in one year is not scored here.
Is 850 St Marks Avenue, Brooklyn covered by Local Law 97?
Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.
When was 850 St Marks Avenue, Brooklyn built?
The city's record gives 1926 as the year 850 St Marks Avenue, Brooklyn was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator apartment building with 6 floors.
How many apartments does 850 St Marks Avenue, Brooklyn have?
The Department of City Planning's PLUTO tax-lot file lists 54 residential units at 850 St Marks Avenue, Brooklyn. The count is for the whole tax lot.
Where do these numbers come from?
From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH hearing dates, DOB violations, HPD's housing court cases, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, Local Law 84 energy reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 26, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.