Skip to content
ViolationScout1 open Class C, with 5 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.Your building
Buildings90 Sands Street, BrooklynCurrent through

90 Sands St

Brooklyn, NY 11201

90 Sands Street is an elevator building with 491 apartments, built in 1992. It has 8 open violations, 1 of them Class C, immediately hazardous. The oldest open HPD violation was filed on October 16, 2023.

En español: 1 violación de Clase C abierta (peligro inmediato) y 8 abiertas en total. La más antigua del HPD lleva 3 años abierta, desde el 16 de octubre de 2023.

Open now, most hazardous first

  1. 1

    Class C, immediately hazardous, filed in the last 3 years

    Oldest open since

    Get it certified
  2. 6

    Class B, hazardous, filed in the last 3 years. Most often Mold.

    See the 6
  3. 1

    OATH/ECB summons still active

    See it

Open violations are sitting, with little movement either way. 5 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.

Since November 27, 2023, certifications were filed on 35 Class C violations: 14 by the original certify-by date, 21 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works

The original certify-by dates on the 7 open HPD violations run from October 9, 2025 to December 24, 2026.

Zoning district
M1-6/R10
Lot area
21,175 sq ft
Floor area
472,967 sq ft
Last sale
$170,000,000
Tax lot (BBL)
3-00087-0009

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C1 open
Vermin / InfestationCIV14 mailed1941631290 SANDS HOUSING DEVELOPMENT FUND CORP
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
In HPD's words. Apartment numbers are left out.
Class B6 open most often Mold
No access to reinspect (first try)18215005
MoldDefect letter sent18528285
MoldDefect letter sent18528284
MoldDefect letter sent18528283
No access to reinspect (first try)18179740
Not complied with18179632
OATH/ECB1 open
Elevators, Class 2Hearing pending39212003N90 SANDS HOUSING DEVELOPMENT FUND CORP
Is this your building?Also for tenants and buyers
Is this your building?

An OATH hearing on January 27, 2027.

We read every request ourselves. If we know a firm that handles this kind of work, we'll tell you who, and we only share your details if you say yes.

Your details stay with us. We share them with a firm only if you say yes. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See what's in the report first

Or file it yourself: what it can hold up, and how correction is filed

The building report reads this record for you: the city's wording on each open Class B violation filed in the last 3 years, what each status means, and how the building compares with others its size.

See what's in the report

HPD takes complaints from tenants through 311.

JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix

For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it

HPD and other city records

HPD vacate order
HPD's vacate order for part of the building has been in effect since July 7, 2025. Reason on the order: fire damage.
HPD, by year
From 2023 to 2026, HPD filed 238 violations and closed 224, all classes.
YearFiledClosed
202670148
202512459
2024179
2023278
Energy benchmarking
ENERGY STAR score 78 for 2025, against a median of 69 for Multifamily Housing that year.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
Bedbug report
Filed December 2, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
Rent stabilization
Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
Tax exemption
Has an Article XI tax exemption (DOF 2026/27 roll).

Hearings and penalties

OATH hearings
A hearing on a DOB summons is set for January 27, 2027.
OATH/ECB summonses
86 DOB and FDNY summonses here since January 1, 2019, with $152,010 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 38 judgments docketed, the latest on November 23, 2026. A docketed judgment shows up in a title search.
  • November 16, 2026, DOB: Failure to maintain elevator or conveying system. $625 penalty imposed.
  • October 1, 2026, FDNY: Affidavits, design installation documents, and other documentation.
  • October 1, 2026, FDNY: Fire protection systems.

The newest 3 of 86 summonses OATH lists here.

Housing court
6 housing court cases here since 2024. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.

DOB records

DOB violations
5 active DOB violations. The newest was issued June 3, 2021.
DOB complaints
8 DOB complaints in the last 12 months. The newest was filed October 6, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
DOB, all years
40 DOB complaints from 1991 through November 25, 2026. 64 DOB violations since 1993, 29 resolved and 30 dismissed in DOB's records.
DOB facade
Rated Safe in the latest facade report, filed August 12, 2024 (inspection cycle 9). An earlier report in this cycle, filed October 26, 2023, rated it Unsafe. Reports in earlier inspection cycles rated it Safe in 2007 and 2012, and Safe with a repair and maintenance program (SWARMP) in 2017.
DOB permits
DOB NOW lists 17 work permits here, the newest issued February 11, 2025, for Mechanical Systems work.
  • Mechanical Systems, issued February 11, 2025, signed off.
  • General Construction, issued January 31, 2025, signed off.
  • Standpipe, issued October 18, 2024, signed off.

The newest 3 of 17 permits DOB NOW lists here.

Boiler inspection
2 boilers, both inspected in 2026, the latest on October 15. Boilers in buildings with 6 or more apartments are inspected every calendar year.

The building report

The cover of the sample report, a real Brooklyn building with apartment numbers removed.Page 3 of the sample report, What is open, for the same building.

Get the report, $19 See a sample report

You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is mold.

Questions about this building

Does 90 Sands St have open violations?

Yes. It had 8 open violations on November 25, 2026: 7 from HPD and 1 from OATH/ECB. 1 is Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 3 years, since October 16, 2023.

Is this building getting better or worse?

Open violations are sitting, with little movement either way. 1 open Class C, with 5 certifications filed and 1 new Class C in the last 180 days, too few to call a direction. The 180 days run to November 25, 2026.

Is an HPD vacate order in effect at this building?

Yes. HPD's vacate order for part of the building has been in effect since July 7, 2025. Reason on the order: fire damage. An order stays in effect until HPD rescinds it. HPD Online shows whether it has been rescinded since.

Everything on this page comes from the city records listed below. A violation closed after the date at the top may still show as open here. If something is wrong, ask for a correction.

Sources. HPD housing violations and OATH/ECB hearing results, plus HPD's building registrations, HPD vacate orders, OATH hearing dates, OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOF's exemption rolls, DOB facade filings, DOB NOW work permits, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list, the city's PLUTO tax-lot file and DOF's property sales records. Open violation counts cover the last 3 years: HPD Class B and C violations still open, and OATH/ECB summonses still active. The city's own pages can show more.

Cite this page

ViolationScout, 90 Sands St, Brooklyn: 491 units, 1 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through November 25, 2026. https://violationscout.com/building/90-sands-street-brooklyn

How we count: /method.

Is this your building?