939 42nd St
Brooklyn, NY 11219
939 42nd Street is a walk-up building with 6 apartments, built in 1930. It has 21 open violations, 8 of them Class C, immediately hazardous. The oldest open HPD violation was filed on September 30, 1987.
En español: 8 violaciones de Clase C abiertas (peligro inmediato) y 21 abiertas en total. La más antigua del HPD lleva 39 años abierta, desde el 30 de septiembre de 1987.
Open now, most hazardous first
- 8Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Lead Paint.
- 13See the 13
Class B, hazardous, filed in the last 3 years
13.3 open Class C per 10 apartments. Across the city: 0.7.
Certifications are being filed at least twice as fast as new violations come in. 28 certifications filed against 8 new Class C in the last 180 days.
Since November 27, 2023, certifications were filed on 7 Class C violations: 2 by the original certify-by date, 5 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works
The original certify-by dates on the 21 open HPD violations run from January 12, 2026 to November 26, 2026.
- Zoning district
- R6
- Lot area
- 2,179 sq ft
- Floor area
- 5,415 sq ft
- Tax lot (BBL)
- 3-05590-0065
- Neighborhood
- Sunset Park-Borough Park
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 8 open most often Lead Paint | ||
| Lead Paint | Defect letter sent | 18996942 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5MG/CM2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 RCNY §11-07(B)) using work practices set forth in 28 RCNY §11-06(B)(2). 1st window frame from west at north wall in the 1st room from north at west | |||
| Lead Paint | Defect letter sent | 18996941 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st window frame from east at south wall in the 2nd room from north | |||
| Lead Paint | Defect letter sent | 18996940 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5MG/CM2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 RCNY §11-07(B)) using work practices set forth in 28 RCNY §11-06(B)(2). East wall in the 2nd private hallway | |||
| Lead Paint | Notice sent | 18996939 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5MG/CM2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 RCNY §11-07(B)) using work practices set forth in 28 RCNY §11-06(B)(2). North wall in the 1st room from north at east | |||
| Certified late | 18996862 | ||
| § 27-2005 ADM CODE Repair the roof so that it will not leak at ceiling in the 1st room from north at east | |||
| Vermin / Infestation | Certified late | 18991437 | |
| 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. Evidence found at observed rat droppings in the entire apartment | |||
| Mold | Certified late | 18991435 | |
| § 27-2017.3 HMC: Trace and repair the source and abate the visible mold condition... At south , east , north and west wall and ceiling and at window frame at east wall and at riser at east wall and at door frame at west wall in the bathroom | |||
| Vermin / Infestation | Certified late | 18991434 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | |||
| In HPD's words. Apartment numbers are left out. | |||
| Class B | 13 open | ||
| Mold | CIV14 mailed | 19289036 | |
| False certification | 18991432 | ||
| Notice sent | 18394628 | ||
| Notice sent | 18394627 | ||
| Notice sent | 18394626 | ||
| Notice sent | 18394625 | ||
| Notice sent | 18394624 | ||
| Notice sent | 18394623 | ||
| Notice sent | 18394622 | ||
| Notice sent | 18394301 | ||
| Notice sent | 18394299 | ||
| Notice sent | 18394297 | ||
| Notice sent | 18394296 | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 10 on September 24, 2026 and 10 on November 15.
- HPD, by year
- From 2017 to 2026, HPD filed 62 violations and closed 37, all classes.
Year Filed Closed 2026 33 24 2025 17 1 2021 10 9 2018 1 3 2017 1 0 - Bedbug report
- Filed December 17, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- HPD emergency repair order
- 1 completed HPD emergency repair order since November 27, 2023: a general construction order, opened January 10, 2026, awarded for $2,768. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- OATH/ECB summonses
- 10 DOB summonses here since January 1, 2019, with $54,375 in penalties imposed. 10 judgments docketed, the latest on November 30, 2022. A docketed judgment shows up in a title search.
- January 24, 2022, DOB: Unlawful acts. Failure to comply with an order of the commissioner. Decided by default, $12,500 penalty imposed.
- November 19, 2021, DOB: Unlawful acts. Failure to comply with an order of the commissioner. Decided by default, $12,500 penalty imposed.
- September 21, 2021, DOB: Fail to comply with commissioner order to file certificate of correction with DOB. Decided by default, $3,125 penalty imposed.
The newest 3 of 10 summonses OATH lists here.
- Housing court
- 1 housing court case here, opened in 2006. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 4 active DOB violations. The newest was issued April 25, 2023.
- DOB, all years
- 14 DOB complaints from 1992 through November 25, 2026. 5 DOB violations since 2014, 1 dismissed in DOB's records.
- Boiler inspection
- Inspected December 26, 2025. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 13 other open violations this page lists without it.
- What each of the 5 city statuses here means, and how many of these carry it.
- How it compares with the 19,359 Brooklyn buildings with 6 to 19 apartments.
- All 10 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.