94 Rockaway Pkwy
Brooklyn, NY 11212
94 Rockaway Parkway is a walk-up building with 39 apartments, built in 1924. It has 55 open violations, 16 of them Class C, immediately hazardous. The oldest open HPD violation was filed on May 30, 2017.
En español: 16 violaciones de Clase C abiertas (peligro inmediato) y 55 abiertas en total. La más antigua del HPD lleva 9 años abierta, desde el 30 de mayo de 2017.
Open now, most hazardous first
- 16Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Vermin / Infestation.
- 39See the 39
Class B, hazardous, filed in the last 3 years. Most often Fire Safety.
4.1 open Class C per 10 apartments. Across the city: 0.7.
Certifications are being filed at least twice as fast as new violations come in. 129 certifications filed against 12 new Class C in the last 180 days.
Since November 27, 2023, certifications were filed on 114 Class C violations: 113 by the original certify-by date, 1 after it. HPD now marks 2 of them False Certification. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works
The original certify-by dates on the 55 open HPD violations run from April 3, 2024 to December 25, 2026.
- Zoning district
- R6
- Lot area
- 10,000 sq ft
- Floor area
- 29,108 sq ft
- Tax lot (BBL)
- 3-04615-0011
- Neighborhood
- East Flatbush-Remsen Village
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 16 open most often Vermin / Infestation | |||
| Vermin / Infestation | Notice sent to tenant | 19363029 | ROCK PARK 94 LLC | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | CIV14 mailed | 19363028 | ROCK PARK 94 LLC | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Heat / Hot Water | Certified on time | 19321456 | ROCK PARK 94 LLC | |
| § 27-2033 ADM CODE Provide ready access to buildings heating system lock door gate at building front leading to basement is lock at boiler room | ||||
| Heat / Hot Water | CIV14 mailed | 19321455 | ROCK PARK 94 LLC | |
| § 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment | ||||
| Vermin / Infestation | Not complied with | 19218727 | ROCK PARK 94 LLC | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Vermin / Infestation | No access to reinspect (first try) | 19193405 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | No access to reinspect (first try) | 19193404 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Vermin / Infestation | No access to reinspect (first try) | 19161399 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Not complied with | 19111076 | |||
| § 27-2043.1 HMC Install the missing or repair/replace the defective window guard(S) in accordance with the specifications of the new york city health code section 24 RCNY chapter 12. Wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment | ||||
| Vermin / Infestation | False certification | 19051704 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | False certification | 19051703 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Heat / Hot Water | Not complied with | 19051702 | ||
| § 27-2033 ADM CODE Provide ready access to buildings heating system door locked at basement at boiler room | ||||
| Fire Safety | Not complied with | 17676587 | ||
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges, building entrance, building front | ||||
| Fire Safety | Not complied with | 17296451 | ||
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective latch set at entrance to building. At public hall, 1st story | ||||
| Not complied with | 17228977 | |||
| § 27-2005 HMC: Properly repair or replace the broken or defective lock amd assembly at building entrance door at public hall, 1st story | ||||
| Lead Paint | Lead documents not accepted | 16723717 | ||
| § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 MG/CM2 (28 RCNY §11-07(B)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 39 open most often Fire Safety | |||
| Fire Safety | CIV14 mailed | 19363047 | ROCK PARK 94 LLC | |
| Fire Safety | CIV14 mailed | 19363034 | ROCK PARK 94 LLC | |
| Notice sent | 19363031 | ROCK PARK 94 LLC | ||
| Not complied with | 19218732 | ROCK PARK 94 LLC | ||
| Not complied with | 19218731 | ROCK PARK 94 LLC | ||
| CIV14 mailed | 19218730 | ROCK PARK 94 LLC | ||
| Not complied with | 19218728 | ROCK PARK 94 LLC | ||
| Not complied with | 19218726 | ROCK PARK 94 LLC | ||
| CIV14 mailed | 19218725 | ROCK PARK 94 LLC | ||
| CIV14 mailed | 19218724 | ROCK PARK 94 LLC | ||
| Not complied with | 19193418 | |||
| Not complied with | 19193416 | |||
| Not complied with | 19193415 | |||
| Not complied with | 19193414 | |||
| Not complied with | 19193413 | |||
| Not complied with | 19193412 | |||
| Not complied with | 19193411 | |||
| Not complied with | 19193410 | |||
| Fire Safety | Not complied with | 19193407 | ||
| Fire Safety | Not complied with | 19161402 | ||
| Fire Safety | Not complied with | 19161401 | ||
| Not complied with | 19161400 | |||
| Fire Safety | No access to reinspect (first try) | 19128426 | ||
| Fire Safety | No access to reinspect (first try) | 19128425 | ||
| No access to reinspect (first try) | 19128422 | |||
| No access to reinspect (first try) | 19128420 | |||
| Fire Safety | Not complied with | 19111078 | ||
| Fire Safety | Not complied with | 19111077 | ||
| Not complied with | 19090719 | |||
| Not complied with | 19090718 | |||
| Not complied with | 19068633 | |||
| Not complied with | 19068631 | |||
| Not complied with | 18639267 | |||
| Not complied with | 17733681 | |||
| Not complied with | 17733680 | |||
| Not complied with | 17733677 | |||
| Not complied with | 17733676 | |||
| False certification | 17427365 | |||
| False certification | 17427364 | |||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD vacate order
- HPD's vacate order for part of the building has been in effect since April 12, 2016. Reason on the order: fire damage.
- Open Class C, week by week
- 30 on September 24, 2026 and 16 on November 15.
- HPD, by year
- From 2017 to 2026, HPD filed 916 violations and closed 926, all classes.
Year Filed Closed 2026 192 166 2025 57 63 2024 105 88 2023 47 178 2022 178 92 2021 104 40 2020 31 52 2019 84 76 2018 68 78 2017 50 93 - Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed December 2, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- HPD emergency repair order
- 1 completed HPD emergency repair order since November 27, 2023: a general construction order, opened September 24, 2026, awarded for $1,085. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- OATH/ECB summonses
- 4 DOB summonses here since January 1, 2019, with $16,250 in penalties imposed.
- April 26, 2025, DOB: Failure to maintain per BC1008.1.8; 27-371; BC1008.1.9;BC1010.1.8;BC1010.1.9. Decided by default, $6,250 penalty imposed.
- April 26, 2025, DOB: Miscellaneous violations. Adjourned, $2,500 penalty imposed.
- April 26, 2025, DOB: Failure to provide unobstructed exit passageway. Adjourned, $1,250 penalty imposed.
The newest 3 of 4 summonses OATH lists here.
- Housing court
- 2 open housing court cases, most of them tenant actions. The newest opened September 24, 2026. 9 housing court cases here since 2009, most of them tenant actions. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 1 active DOB violation, issued August 16, 1993.
- DOB, all years
- 9 DOB complaints from 2004 through November 25, 2026. 4 DOB violations since 1993, 3 dismissed in DOB's records.
- DOB permits
- DOB NOW lists 1 work permit here: Sidewalk Shed, issued June 29, 2022, expired June 29, 2023.
- Boiler inspection
- Inspected May 2, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 39 other open violations this page lists without it.
- What each of the 8 city statuses here means, and how many of these carry it.
- How it compares with the 4,017 Brooklyn buildings with 20 to 49 apartments.
- All 1 DOB NOW work permit, with job numbers and each job's estimated cost.
- All 4 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.