Skip to content
ViolationScout16 certifications filed against 4 new Class C in the last 180 days.Your building
Buildings990 Bronx Park South, BronxCurrent through

990 Bronx Park South

West Farms, Bronx, NY 10460

990 Bronx Park South is an elevator building with 53 apartments, built in 1924. It has 15 open violations, 10 of them Class C, immediately hazardous. The oldest open HPD violation was filed on July 24, 2025.

En español: 10 violaciones de Clase C abiertas (peligro inmediato) y 15 abiertas en total. La más antigua del HPD lleva 15 meses abierta, desde el 24 de julio de 2025.

Open now, most hazardous first

  1. 10

    Class C, immediately hazardous, filed in the last 3 years. Most often Vermin / Infestation.

    Oldest open since

    Get these certified
  2. 3

    Class B, hazardous, filed in the last 3 years

    See the 3
  3. 2

    OATH/ECB summonses still active

    See the 2

1.9 open Class C per 10 apartments. Across the city: 0.7.

Certifications are being filed at least twice as fast as new violations come in. 16 certifications filed against 4 new Class C in the last 180 days.

Since November 16, 2023, certifications were filed on 260 Class C violations: 258 by the original certify-by date, 2 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works

The original certify-by dates on the 13 open HPD violations run from August 29, 2025 to December 1, 2026.

Zoning district
R7-1
Lot area
11,880 sq ft
Floor area
60,000 sq ft
Last transfer
No price recorded
Tax lot (BBL)
2-03134-0020

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C10 open most often Vermin / Infestation
Vermin / InfestationNot complied with19203537990 BRONX PARK SOUTH, LLC
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
Vermin / InfestationNot complied with19203536990 BRONX PARK SOUTH, LLC
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
Vermin / InfestationNo access to reinspect (first try)18971478
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
Vermin / InfestationNo access to reinspect (first try)18971475
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
Vermin / InfestationNo access to reinspect (first try)18251247
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
Vermin / InfestationNo access to reinspect (first try)18251245
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
Vermin / InfestationNo access to reinspect (first try)18223449
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
Vermin / InfestationNo access to reinspect (first try)18223441
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
Vermin / InfestationNo access to reinspect (first try)18119036
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
Vermin / InfestationNo access to reinspect (first try)18119031
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
In HPD's words. Apartment numbers are left out.
Class B3 open
CIV14 mailed19295758990 BRONX PARK SOUTH, LLC
CIV14 mailed19295757990 BRONX PARK SOUTH, LLC
CIV14 mailed19295756990 BRONX PARK SOUTH, LLC
OATH/ECB2 open
Elevators, Class 1Hearing pending39201376M
Construction, Class 2Hearing pending39535491H
Is this your building?Also for tenants and buyers
Is this your building?

2 OATH hearings starting December 3, 2026.

We read every request ourselves. If we know a firm that handles this kind of work, we'll tell you who, and we only share your details if you say yes.

Your details stay with us. We share them with a firm only if you say yes. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See what's in the report first

Or file it yourself: what it can hold up, and how correction is filed

The building report reads this record for you: the city's wording on each open Class B violation filed in the last 3 years, what each status means, and how the building compares with others its size.

See what's in the report

HPD takes complaints from tenants through 311.

JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix

For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it

HPD and other city records

Open Class C, week by week
10 on September 24, 2026 and 10 on November 8.
HPD, by year
From 2017 to 2026, HPD filed 1,270 violations and closed 1,301, all classes.
YearFiledClosed
20264669
2025146311
2024494338
20234548
20224142
20217782
20207599
20196483
20189225
2017190204
Energy benchmarking
ENERGY STAR score 15 for 2024, against a median of 67 for Multifamily Housing that year.
Local Law 97
Covered from 2035 as an income-restricted building (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
Bedbug report
Filed January 22, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
Tax exemption
Has an Article XI tax exemption (DOF 2026/27 roll).
HPD emergency repair orders
4 completed HPD emergency repair orders since November 16, 2023, awarded for $6,560 in total. The most recent of the 4, a general construction order, was opened December 6, 2024. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.

Hearings and penalties

OATH hearings
2 hearings scheduled on DOB summonses, the first on December 3, 2026.
OATH/ECB summonses
18 DOB and FDNY summonses here since January 1, 2019, with $31,025 in penalties imposed. 2 of them are still active, the same 2 listed under OATH/ECB. 12 judgments docketed, the latest on November 30, 2025. A docketed judgment shows up in a title search.
  • August 21, 2026, DOB: Failure to maintain elevator or conveying system. Adjourned, $1,250 penalty imposed.
  • December 30, 2024, DOB: Pedestrian protection does not meet code specifications. Adjourned, $10,000 penalty imposed.
  • September 23, 2024, DOB: Failure to maintain building walls or appurtenances. In violation, $2,500 penalty imposed.

The newest 3 of 18 summonses OATH lists here.

Housing court
18 housing court cases here since 2006. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.

DOB records

DOB complaints
2 DOB complaints in the last 12 months. The newest was filed May 31, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
DOB, all years
36 DOB complaints from 2007 through November 14, 2026. 45 DOB violations since 1992, 32 resolved and 13 dismissed in DOB's records.
DOB permits
DOB NOW lists 2 work permits here, the newest issued July 15, 2025, for Sidewalk Shed work.
  • Sidewalk Shed, issued July 15, 2025, expired July 15, 2026.
  • General Construction, issued November 27, 2024, signed off.
Boiler inspection
Inspected October 20, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.

The building report

The cover of the sample report, a real Brooklyn building with apartment numbers removed.Page 3 of the sample report, What is open, for the same building.

Get the report, $19 See a sample report

You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is vermin and pests.

Nearby buildings

Questions about this building

Does 990 Bronx Park South have open violations?

Yes. It had 15 open violations on November 14, 2026: 13 from HPD and 2 from OATH/ECB. 10 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 15 months, since July 24, 2025.

Is this building getting better or worse?

Certifications are being filed at least twice as fast as new violations come in. 16 certifications filed against 4 new Class C in the last 180 days. The 180 days run to November 14, 2026.

Everything on this page comes from the city records listed below. A violation closed after the date at the top may still show as open here. If something is wrong, ask for a correction.

Sources. HPD housing violations and OATH/ECB hearing results, plus the neighborhood from HPD and DOB records, HPD's building registrations, OATH hearing dates, OATH/ECB summonses from DOB and FDNY, HPD's housing court cases, DOB complaints, DOF's exemption rolls, DOB NOW work permits, HPD emergency repair orders, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list, the city's PLUTO tax-lot file and DOF's property sales records. Open violation counts cover the last 3 years: HPD Class B and C violations still open, and OATH/ECB summonses still active. The city's own pages can show more.

Cite this page

ViolationScout, 990 Bronx Park South, Bronx: 53 units, 10 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through November 14, 2026. https://violationscout.com/building/990-bronx-park-south-bronx

How we count: /method.

Is this your building?