Skip to content
ViolationScout75 certifications filed against 9 new Class C in the last 180 days.Your building
Buildings1952 1 Avenue, ManhattanCurrent through

1952 1st Ave, Manhattan

BBL 1-01694-0007

Built
1973
Floors
13
Residential units
323
Building type
Elevator building
Zoning district
R7-2
Lot area
75,100 sq ft
Floor area
414,144 sq ft
Last sale
$325,000,000 for 2 lots

En español: 15 violaciones de Clase C abiertas (peligro inmediato) y 45 abiertas en total. La más antigua del HPD lleva 9 años abierta, desde el 30 de mayo de 2017.

Open now, most hazardous first

  1. 15

    Class C, immediately hazardous. Most often Vermin / Infestation.

    27 open counting every year, the oldest since

    Get these certified
  2. 30

    Class B, hazardous. Most often Mold.

    See the 30

Certifications are being filed faster than new violations come in. 75 certifications filed against 9 new Class C in the last 180 days.

Since October 12, 2023, certifications were filed on 67 Class C violations: 61 by the original certify-by date, 6 after it. How certification works

The original certify-by dates on the 45 open HPD violations run from May 22, 2025 to November 26, 2026. The report prints the date beside each one.

Is this your building?

15 open Class C and a facade rated SWARMP. The oldest open HPD violation was filed May 30, 2017.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

Open Class C, week by week
20 on September 24, 2026 and 15 on October 8.
OATH/ECB summonses
43 DOB and FDNY summonses here since January 1, 2019, with $50,032 in penalties imposed. 13 judgments docketed, the latest on September 30, 2026. A docketed judgment shows up in a title search.
  • February 24, 2026, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms. In violation, $935 penalty imposed.
  • January 27, 2026, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms. In violation, $935 penalty imposed.
  • December 18, 2025, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms. In violation.

The newest 3 of 43 summonses OATH lists here. The report lists all 43, with each outcome, the penalty imposed and any docketing date. What the report adds

Housing court
1 open housing court case, opened July 20, 2026. 13 housing court cases here since 2008, most of them tenant actions.
DOB facade
Rated SWARMP in the latest facade report, filed February 21, 2022 (inspection cycle 9). Reports in earlier inspection cycles rated it SWARMP in 2007 and Safe in 2015. SWARMP means safe with a repair and maintenance program. Need this filed?
DOB permits
DOB NOW lists 23 work permits here, the newest issued July 30, 2025, for Sprinklers work.
  • Sprinklers, issued July 30, 2025, signed off.
  • Mechanical Systems, issued May 28, 2025, expired November 10, 2025.
  • Plumbing, issued May 22, 2025, signed off.

The newest 3 of 23 permits DOB NOW lists here. The report lists all 23, with job numbers and each job's estimated cost. What the report adds

Local Law 97
Covered from 2035 as an income-restricted building (DOB's list, March 1, 2026).
Boiler inspection
2 boilers, both inspected in 2026, the latest on February 9. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed December 18, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Tax exemption
Has an Article XI tax exemption (DOF 2026/27 roll).
HPD emergency repair order
1 completed HPD emergency repair order since October 12, 2023: a general construction order, opened September 8, 2025, awarded for $2,000.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C15 open most often Vermin / Infestation
Fire SafetyNotice sent19288392
Vermin / InfestationNotice sent to tenant19276136
Vermin / InfestationCertified on time19214930
Fire SafetyNot complied with19196158RIVER CROSSING OWNER LLC
Fire SafetyNot complied with19196156RIVER CROSSING OWNER LLC
Fire SafetyNo access to reinspect (first try)19196145RIVER CROSSING OWNER LLC
Vermin / InfestationNo access to reinspect (first try)19163993RIVER CROSSING OWNER LLC
Vermin / InfestationNot complied with18928688RIVER CROSSING OWNER LLC
Vermin / InfestationNotice sent to tenant18851335RIVER CROSSING OWNER LLC
Vermin / InfestationNotice sent to tenant18162108RIVER CROSSING OWNER LLC
The report lists all 15, each with the city's own words and the date on its notice. What the report adds
Class B30 open most often Mold
Notice sent19288400
CIV14 mailed19194526
Certified on time19194520
Certified on time19196165RIVER CROSSING OWNER LLC
Certified on time19196163RIVER CROSSING OWNER LLC
Certified on time19196161RIVER CROSSING OWNER LLC
Certified on time19196159RIVER CROSSING OWNER LLC
Certified on time19196154RIVER CROSSING OWNER LLC
Certified on time19196152RIVER CROSSING OWNER LLC
Certified on time19196149RIVER CROSSING OWNER LLC
The report lists all 30, each with the city's own words and the date on its notice. What the report adds

The full report on 1952 1st Ave, Manhattan

Get the report on 1952 1st Ave, Manhattan, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is vermin and pests.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 1952 1 Avenue, Manhattan have open violations?

Yes. 1952 1 Avenue, Manhattan had 45 open violations on October 10, 2026: 45 from HPD. 15 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 9 years, since May 30, 2017.

Is 1952 1 Avenue, Manhattan getting better or worse?

Certifications are being filed faster than new violations come in. 75 certifications filed against 9 new Class C in the last 180 days. That window ends October 10, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 1952 1 Avenue, Manhattan?

Since October 12, 2023, certifications were filed on 67 Class C violations: 61 by the original certify-by date, 6 after it. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Is 1952 1 Avenue, Manhattan in housing court?

Yes. 1 open housing court case, opened July 20, 2026. 13 housing court cases here since 2008, most of them tenant actions. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Are any HPD emergency repair orders at 1952 1 Avenue, Manhattan marked completed?

Yes. 1 completed HPD emergency repair order since October 12, 2023: a general construction order, opened September 8, 2025, awarded for $2,000. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

What did the latest facade report find at 1952 1 Avenue, Manhattan?

Rated SWARMP in the latest facade report, filed February 21, 2022 (inspection cycle 9). Reports in earlier inspection cycles rated it SWARMP in 2007 and Safe in 2015. SWARMP means safe with a repair and maintenance program. Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

When was the boiler at 1952 1 Avenue, Manhattan last inspected?

It has 2 boilers, both inspected in 2026, the latest on February 9. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 1952 1 Avenue, Manhattan last file its bedbug report?

On December 18, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 1952 1 Avenue, Manhattan covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered from 2035 as an income-restricted building (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Does 1952 1 Avenue, Manhattan have a property tax exemption?

The building has an Article XI tax exemption on DOF's 2026/27 roll. An exemption lowers a property's tax bill by reducing its assessed value.

When was 1952 1 Avenue, Manhattan built?

The city's record gives 1973 as the year 1952 1 Avenue, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator building with 13 floors.

How many apartments does 1952 1 Avenue, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 323 residential units at 1952 1 Avenue, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH/ECB summonses from DOB and FDNY, HPD's housing court cases, DOF's exemption rolls, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list, the city's PLUTO tax-lot file and DOF's property sales records. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH/ECB summonses from DOB and FDNY, HPD's housing court cases, DOF's exemption rolls, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list, the city's PLUTO tax-lot file and DOF's property sales records. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 1952 1st Ave, Manhattan: 323 units, 15 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/1952-1-avenue-manhattan

How we count: /method.

Is this your building?