Skip to content
ViolationScout103 certifications filed and 75 new Class C in the last 180 days, neither far ahead.Your building
Buildings2588 7 Avenue, ManhattanCurrent through

2588 7th Ave, Manhattan

BBL 1-02035-0001 Landmark: Individual Landmark

Built
1928
Floors
6
Residential units
538
Building type
Walk-up building
Zoning district
R7-2
Lot area
150,322 sq ft
Floor area
436,115 sq ft
Last transfer
No price recorded
Last sale
$3,084,000

En español: 110 violaciones de Clase C abiertas (peligro inmediato) y 196 abiertas en total. La más antigua del HPD lleva 9 años abierta, desde el 7 de noviembre de 2016.

Open now, most hazardous first

  1. 110

    Class C, immediately hazardous. Most often Vermin / Infestation.

    111 open counting every year, the oldest since

    Get these certified
  2. 81

    Class B, hazardous. Most often Mold.

    See the 81
  3. 5

    OATH/ECB summonses still active. Most often Construction.

    See the 5

Certifications are being filed about as fast as new violations come in. 103 certifications filed and 75 new Class C in the last 180 days, neither far ahead.

Since October 12, 2023, certifications were filed on 436 Class C violations: 366 by the original certify-by date, 70 after it. HPD now marks 1 of them Invalid Certification. How certification works

The original certify-by dates on the 191 open HPD violations run from June 17, 2024 to November 27, 2026. The report prints the date beside each one.

Is this your building?

110 open Class C and 5 OATH hearings starting October 22, 2026. The oldest open HPD violation was filed November 7, 2016.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

HPD vacate order
HPD's vacate order for part of the building has been in effect since February 7, 2013. Reason on the order: fire damage.
Open Class C, week by week
106 on September 24, 2026 and 110 on October 8.
OATH hearings
5 hearings scheduled on DOB summonses, the first on October 22, 2026.
OATH/ECB summonses
44 DOB and FDNY summonses here since January 1, 2019, with $36,901 in penalties imposed. 5 of them are still active, the same 5 listed under OATH/ECB. 17 judgments docketed, the latest on November 30, 2025. A docketed judgment shows up in a title search.
  • September 8, 2026, DOB: Failure to secure electrical device enclosure per section requirement. $300 penalty imposed.
  • September 8, 2026, DOB: Fail maintain building in compliant manner: Gas vent reduced or undersized. $625 penalty imposed.
  • August 17, 2026, DOB: Failure to maintain building in code-compliant manner. $1,250 penalty imposed.

The newest 3 of 44 summonses OATH lists here. The report lists all 44, with each outcome, the penalty imposed and any docketing date. What the report adds

DOF tax lien sale
Listed for DOF's 2025 tax lien sale, for water and sewer charges only. The last list it appeared on was the 10-day notice of May 2025.
DOB violations
6 active DOB violations. The newest was issued June 28, 2017.
Housing court
3 open housing court cases, most of them tenant actions. The newest opened May 4, 2026. 131 housing court cases here since 2005.
DOB complaints
41 DOB complaints, 1 of them conversion complaint, in the 12 months to September 25, 2026. The newest was filed September 8, 2026.
DOB permits
DOB NOW lists 21 work permits here, the newest issued May 20, 2022, for Plumbing work.
  • Plumbing, issued May 20, 2022, expired May 20, 2023.
  • Mechanical Systems, issued October 7, 2021, expired June 26, 2022.
  • Plumbing, issued August 19, 2021, expired May 12, 2022.

The newest 3 of 21 permits DOB NOW lists here. The report lists all 21, with job numbers and each job's estimated cost. What the report adds

Energy benchmarking
ENERGY STAR score 92 for 2024, against a median of 67 for Multifamily Housing that year.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Boiler inspection
6 boilers, all inspected in 2026, the latest on August 27. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed for its 6 buildings by January 22, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).
Tax exemption
Has J-51 and Article XI tax exemptions (DOF 2026/27 roll). DOF lists the J-51 start year as 2002.
HPD emergency repair orders
8 completed HPD emergency repair orders since October 12, 2023, awarded for $8,469 in total. The most recent of the 8, a general construction order, was opened May 11, 2026.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C110 open most often Vermin / Infestation
Heat / Hot WaterNotice sent19283959
Vermin / InfestationNot complied with19256014
Vermin / InfestationNot complied with19256013
Notice sent19247585
Notice sent19195900
Notice sent19195899
Notice sent19195896
Notice sent19195894
Notice sent19195890
Notice sent19195885
The report lists all 110, each with the city's own words and the date on its notice. What the report adds
Class B81 open most often Mold
Notice sent19283964
Notice sent19283963
Notice sent19283962
Notice sent19283961
Notice sent19283960
Notice sent19283958
Notice sent19268517
Fire SafetyCIV14 mailed19247586
Fire SafetyCIV14 mailed19247584
Notice sent19195930
The report lists all 81, each with the city's own words and the date on its notice. What the report adds
OATH/ECB5 open most often Construction
Class 3Hearing pending39203309L
Plumbing, Class 2Hearing pending39203302Z
Construction, Class 2Hearing pending39200803N2802-2816 FDB LLC
Construction, Class 1Hearing pending39200523Z2802-2816 FDB LLC
Class 1Hearing pending39200522R2802-2816 FDB LLC

The full report on 2588 7th Ave, Manhattan

Get the report on 2588 7th Ave, Manhattan, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is vermin and pests.

Nearby buildings

Questions about this building

Does 2588 7 Avenue, Manhattan have open violations?

Yes. 2588 7 Avenue, Manhattan had 196 open violations on October 10, 2026: 191 from HPD and 5 from OATH/ECB. 110 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 9 years, since November 7, 2016.

Is 2588 7 Avenue, Manhattan getting better or worse?

Certifications are being filed about as fast as new violations come in. 103 certifications filed and 75 new Class C in the last 180 days, neither far ahead. That window ends October 10, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 2588 7 Avenue, Manhattan?

Since October 12, 2023, certifications were filed on 436 Class C violations: 366 by the original certify-by date, 70 after it. HPD now marks 1 of them Invalid Certification. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Is an HPD vacate order in effect at 2588 7 Avenue, Manhattan?

Yes. HPD's vacate order for part of the building has been in effect since February 7, 2013. Reason on the order: fire damage. A vacate order requires all or part of a building to be emptied for the reason on the order, and it stays in effect until HPD rescinds it. HPD Online shows whether an order has been rescinded since.

Does 2588 7 Avenue, Manhattan have an OATH hearing coming up?

Yes. 5 hearings scheduled on DOB summonses, the first on October 22, 2026. DOB summonses are heard at OATH, the city's hearings office, and OATH can move a hearing to a later date. When nobody shows up, the summons is decided by default, the costliest way one ends.

Does 2588 7 Avenue, Manhattan have active DOB violations?

Yes. 6 active DOB violations. The newest was issued June 28, 2017. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Is 2588 7 Avenue, Manhattan in housing court?

Yes. 3 open housing court cases, most of them tenant actions. The newest opened May 4, 2026. 131 housing court cases here since 2005. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Has DOB received complaints about 2588 7 Avenue, Manhattan?

Yes. 41 DOB complaints, 1 of them conversion complaint, in the 12 months to September 25, 2026. The newest was filed September 8, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

Are any HPD emergency repair orders at 2588 7 Avenue, Manhattan marked completed?

Yes. 8 completed HPD emergency repair orders since October 12, 2023, awarded for $8,469 in total. The most recent of the 8, a general construction order, was opened May 11, 2026. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

What is the ENERGY STAR score for 2588 7 Avenue, Manhattan?

ENERGY STAR score 92 for 2024, against a median of 67 for Multifamily Housing that year. Buildings over 25,000 square feet report their energy use to the city every year under Local Law 84. The ENERGY STAR score runs from 1 to 100 and compares a building with similar ones nationwide; 50 is the national median. The score is the one the city publishes, and this page never estimates a Local Law 97 emissions penalty. A lot that reported several properties in one year is not scored here.

When was the boiler at 2588 7 Avenue, Manhattan last inspected?

It has 6 boilers, all inspected in 2026, the latest on August 27. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 2588 7 Avenue, Manhattan last file its bedbug report?

Its 6 buildings had all filed by January 22, 2026, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 2588 7 Avenue, Manhattan covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 2588 7 Avenue, Manhattan rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

Does 2588 7 Avenue, Manhattan have a property tax exemption?

The building has J-51 and Article XI tax exemptions on DOF's 2026/27 roll. DOF lists the J-51 start year as 2002. An exemption lowers a property's tax bill by reducing its assessed value.

When was 2588 7 Avenue, Manhattan built?

The city's record gives 1928 as the year 2588 7 Avenue, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a walk-up building with 6 floors.

How many apartments does 2588 7 Avenue, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 538 residential units at 2588 7 Avenue, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on HPD vacate orders, OATH hearing dates, OATH/ECB summonses from DOB and FDNY, DOF's tax lien sale lists, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOF's exemption rolls, DOB NOW work permits, HPD emergency repair orders, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list, the city's PLUTO tax-lot file and DOF's property sales records. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus HPD vacate orders, OATH hearing dates, OATH/ECB summonses from DOB and FDNY, DOF's tax lien sale lists, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOF's exemption rolls, DOB NOW work permits, HPD emergency repair orders, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list, the city's PLUTO tax-lot file and DOF's property sales records. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 2588 7th Ave, Manhattan: 538 units, 110 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/2588-7-avenue-manhattan

How we count: /method.

Is this your building?