25 Hillside Ave, Manhattan
- Built
- 1920
- Floors
- 6
- Residential units
- 142
- Building type
- Elevator building
- Zoning district
- R7-2
- Lot area
- 30,225 sq ft
- Floor area
- 113,125 sq ft
- Last sale
- $10,066,838
En español: 11 violaciones de Clase C abiertas (peligro inmediato) y 33 abiertas en total. La más antigua del HPD lleva 7 años abierta, desde el 20 de agosto de 2019.
Open now, most hazardous first
- 11Get these certified
Class C, immediately hazardous. Most often Vermin / Infestation.
- 20See the 20
Class B, hazardous. Most often Mold.
- 2See the 2
OATH/ECB summonses still active. Most often Construction.
Certifications are being filed faster than new violations come in. 17 certifications filed against 2 new Class C in the last 180 days.
Since October 12, 2023, certifications were filed on 33 Class C violations, all 33 by the original certify-by date. How certification works
The original certify-by dates on the 31 open HPD violations run from March 12, 2024 to November 24, 2026. The report prints the date beside each one.
- Open Class C, week by week
- 14 on September 24, 2026 and 11 on October 8.
- OATH hearings
- A hearing on a DOB summons is set for October 22, 2026.
- OATH/ECB summonses
- 11 DOB summonses here since January 1, 2019, with $14,562 in penalties imposed. 2 of them are still active, the same 2 listed under OATH/ECB. 4 judgments docketed, the latest on February 28, 2026. A docketed judgment shows up in a title search.
- August 12, 2026, DOB: Failure to maintain building in code-compliant manner. $500 penalty imposed.
- June 23, 2026, DOB: Failure to maintain elevator or conveying system. In violation.
- July 8, 2025, DOB: Failure to maintain elevator or conveying system. Dismissed.
The newest 3 of 11 summonses OATH lists here. The report lists all 11, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 7 active DOB violations. The newest was issued March 5, 2025.
- Housing court
- 7 housing court cases here since 2018, most of them tenant actions.
- DOB complaints
- 9 DOB complaints in the 12 months to September 25, 2026. The newest was filed September 23, 2026.
- DOB facade
- Rated Safe in the latest facade report, filed August 4, 2021 (inspection cycle 9).
- DOB permits
- DOB NOW lists 1 work permit here: Sidewalk Shed, issued September 24, 2018, signed off.
- Energy benchmarking
- ENERGY STAR score 59 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected December 11, 2025. Boilers in buildings with 6 or more apartments are inspected every calendar year. Need this filed?
- Bedbug report
- Filed December 17, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair orders
- 3 completed HPD emergency repair orders since October 12, 2023, awarded for $6,660 in total. The most recent of the 3, a general construction order, was opened January 23, 2026.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 11 open most often Vermin / Infestation | |||
| Fire Safety | Not complied with | 19176580 | FLGSP 25/35 Hillside Avenue LLC | |
| Not complied with | 19139107 | FLGSP 25/35 Hillside Avenue LLC | ||
| Vermin / Infestation | Defect letter sent | 18169860 | ||
| Vermin / Infestation | Not complied with | 17822667 | ||
| Vermin / Infestation | Not complied with | 17822666 | ||
| Vermin / Infestation | Not complied with | 17374010 | ||
| Vermin / Infestation | Defect letter sent | 17319997 | ||
| Vermin / Infestation | Defect letter sent | 17313762 | ||
| Vermin / Infestation | Not complied with | 17313761 | ||
| Lead Paint | Defect letter sent | 16669066 | ||
| The report lists all 11, each with the city's own words and the date on its notice. What the report adds | ||||
| Class B | 20 open most often Mold | |||
| Notice sent | 19275130 | |||
| Notice sent | 19275128 | |||
| Notice sent | 19210911 | |||
| No access to reinspect (first try) | 19176582 | FLGSP 25/35 Hillside Avenue LLC | ||
| No access to reinspect (first try) | 19176578 | FLGSP 25/35 Hillside Avenue LLC | ||
| No access to reinspect (first try) | 19176577 | FLGSP 25/35 Hillside Avenue LLC | ||
| No access to reinspect (first try) | 19176576 | FLGSP 25/35 Hillside Avenue LLC | ||
| No access to reinspect (first try) | 19176575 | FLGSP 25/35 Hillside Avenue LLC | ||
| No access to reinspect (first try) | 19176574 | FLGSP 25/35 Hillside Avenue LLC | ||
| Not complied with | 19156152 | FLGSP 25/35 Hillside Avenue LLC | ||
| The report lists all 20, each with the city's own words and the date on its notice. What the report adds | ||||
| OATH/ECB | 2 open most often Construction | |||
| Construction, Class 3 | Hearing pending | 39200390Y | FLGSP 25/35 Hillside Avenue LLC | |
| Construction, Class 1 | Decided by default | 39124895H | ||
The full report on 25 Hillside Ave, Manhattan
- All 33 open violations, each with the city's own words and the date on its notice.
- What each of the 7 city statuses here means, and how many of these carry it.
- How it compares with the 1,033 Manhattan buildings with 100 to 199 apartments.
- All 1 DOB NOW work permit, with job numbers and each job's estimated cost.
- All 11 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 2 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 25 Hillside Ave, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.