129 2nd Ave, Manhattan
- Built
- 1900
- Floors
- 6
- Residential units
- 21
- Building type
- Walk-up building
- Zoning district
- R7A
- Lot area
- 2,600 sq ft
- Floor area
- 12,393 sq ft
- Last sale
- $29,000,000 for 3 lots
En español: 3 violaciones de Clase C abiertas (peligro inmediato) y 5 abiertas en total. La más antigua del HPD lleva 26 años abierta, desde el 31 de mayo de 2000.
Open now, most hazardous first
- 3Get these certified
Class C, immediately hazardous
- 1See it
Class B, hazardous
- 1See it
OATH/ECB summons still active
Open violations are sitting, with little movement either way. 3 open Class C, with nothing filed or new in the last 180 days.
Since October 12, 2023, certifications were filed on 11 Class C violations, all 11 by the original certify-by date. HPD now marks 2 of them Invalid Certification. How certification works
The original certify-by dates on the 4 open HPD violations have all passed. The latest was December 31, 2025. The report prints the date beside each one.
- OATH/ECB summonses
- 11 DOB and FDNY summonses here since January 1, 2019, with $30,654 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 5 judgments docketed, the latest on August 31, 2023. A docketed judgment shows up in a title search.
- March 13, 2024, DOB: Failure to file complete boiler inspection report. Decided by default, $1,562 penalty imposed.
- March 13, 2024, DOB: Fail maintain building in compliant manner: Service equipment - boiler. Admitted, $655 penalty imposed.
- March 28, 2023, FDNY: Fire protection systems. Decided by default, $2,000 penalty imposed.
The newest 3 of 11 summonses OATH lists here. The report lists all 11, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 4 active DOB violations, most of them for construction. The newest was issued December 1, 2011.
- DOB complaints
- 2 DOB complaints in the 12 months to September 25, 2026. The newest was filed June 16, 2026.
- DOB permits
- 2 DOB work permits in effect. The latest, for General Construction work, was issued July 23, 2026.
- General Construction, issued July 23, 2026, in effect until July 15, 2027.
- Plumbing, issued February 23, 2026, expired September 29, 2026.
- Mechanical Systems, issued November 17, 2025, in effect until November 17, 2026.
The newest 3 of 8 permits DOB NOW lists here. The report lists all 8, with job numbers and each job's estimated cost. What the report adds
- Boiler inspection
- Inspected March 3, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed March 27, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 3 open | ||
| Invalid certification | 18520725 | ||
| Invalid certification | 18520698 | ||
| To be reinspected | 17832519 | ||
| Class B | 1 open | ||
| Not complied with | 17832516 | ||
| OATH/ECB | 1 open | ||
| Boilers, Class 2 | Admitted | 39108624X | |
The full report on 129 2nd Ave, Manhattan
- All 5 open violations, each with the city's own words and the date on its notice.
- What each of the 4 city statuses here means, and how many of these carry it.
- How it compares with the 6,545 Manhattan buildings with 20 to 49 apartments.
- All 8 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 11 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 129 2nd Ave, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.