16 East 208th St
Norwood, Bronx, NY 10467
16 East 208th Street is a walk-up building with 42 apartments, built in 1926. It has 28 open violations, 19 of them Class C, immediately hazardous. The oldest open HPD violation was filed on July 28, 2000.
En español: 19 violaciones de Clase C abiertas (peligro inmediato) y 28 abiertas en total. La más antigua del HPD lleva 26 años abierta, desde el 28 de julio de 2000.
Open now, most hazardous first
- 19Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Lead Paint.
- 8See the 8
Class B, hazardous, filed in the last 3 years. Most often Lead Paint.
- 1See it
OATH/ECB summons still active
4.5 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. 8 certifications filed and 0 new Class C in the last 180 days, too few to call a direction.
Since November 16, 2023, certifications were filed on 22 Class C violations: 20 by the original certify-by date, 2 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works
The original certify-by dates on the 27 open HPD violations have all passed. The latest was July 10, 2026.
- Zoning district
- R7-1
- Lot area
- 14,162 sq ft
- Floor area
- 46,051 sq ft
- Tax lot (BBL)
- 2-03326-0129
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 19 open most often Lead Paint | ||
| Lead Paint | Notice sent | 18755796 | |
| § 27-2056.4 ADM CODE- correct failure to notify occupants and/or to investigate lead-based paint hazards. | |||
| Lead Paint | Notice sent | 18755795 | |
| § 27-2056.7 ADM CODE: Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities. | |||
| Lead Paint | Certified late | 18592445 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from south at west wall, south wall in the 1st private hallway from north | |||
| Lead Paint | Certified late | 18592443 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 RCNY §11-06(B)(2) ceiling, 1st radiator from south at west wall, south wall in the 1st room from north at east | |||
| Mold | Notice sent to tenant | 18968298 | |
| Mold | Notice sent to tenant | 18968297 | |
| Lead Paint | Not complied with | 18487439 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) south wall in the private hallway | |||
| Lead Paint | Not complied with | 18487437 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) north wall, 1st wall cabinet from west at north wall, 1st window frame from south at west wall in the kitchen | |||
| Lead Paint | Not complied with | 18487436 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from north at east wall, 1st riser from south at west wall in the kitchen | |||
| Vermin / Infestation | Not complied with | 18479213 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | |||
| Vermin / Infestation | Not complied with | 18479212 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | |||
| Mold | Notice sent to tenant | 18968296 | |
| Not complied with | 18470217 | ||
| § 27-2043.1 HMC Install the missing or repair/replace the defective window guard(S) in accordance with the specifications of the new york city health code section 24 RCNY chapter 12. Wg to install = 0, wg to replace = 0, wg to repair = 2 in the entire apartment | |||
| Vermin / Infestation | Not complied with | 18470216 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | |||
| Mold | Not complied with | 17304678 | |
| § 27-2017.3 HMC: Trace and repair the source and abate the visible mold condition... Greater than 30 square feet at closet in the private hallway | |||
| Mold | Notice sent to tenant | 18968293 | |
| Vermin / Infestation | Not complied with | 17206827 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | |||
| Vermin / Infestation | Not complied with | 17206826 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | |||
| Lead Paint | Defect letter sent | 16545596 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 2nd window frame from south at west wall in the 2nd room from north | |||
| In HPD's words. Apartment numbers are left out. | |||
| Class B | 8 open most often Lead Paint | ||
| Notice sent | 18953297 | ||
| Notice sent | 18946164 | ||
| Notice sent | 18946162 | ||
| Notice sent | 18946161 | ||
| Lead Paint | Notice sent | 18770490 | |
| Lead Paint | Notice sent | 18770489 | |
| No access to reinspect (first try) | 18743155 | ||
| Mold | Not complied with | 17647762 | |
| OATH/ECB | 1 open | ||
| Construction, Class 1 | Hearing pending | 39175800X | |
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 19 on September 24, 2026 and 19 on November 8.
- HPD, by year
- From 2017 to 2026, HPD filed 254 violations and closed 215, all classes.
Year Filed Closed 2026 58 112 2025 47 32 2024 46 14 2023 23 12 2022 37 9 2020 11 10 2019 0 4 2018 27 18 2017 5 4 - Energy benchmarking
- ENERGY STAR score 23 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed February 9, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- HPD emergency repair order
- 1 completed HPD emergency repair order since November 16, 2023: a general construction order, opened May 1, 2026, awarded for $1,499. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- OATH hearings
- A hearing on a DOB summons is set for March 29, 2027.
- OATH/ECB summonses
- 3 DOB and FDNY summonses here since January 1, 2019, with $7,500 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 1 judgment docketed, on November 30, 2023. A docketed judgment shows up in a title search.
- October 1, 2026, FDNY: Rooftop access and means of egress.
- February 3, 2026, DOB: Failure to maintain building in code-compliant manner. Adjourned, $6,250 penalty imposed.
- May 2, 2023, DOB: Failure to maintain building in code-compliant manner. In violation, $1,250 penalty imposed.
- Housing court
- 4 housing court cases here since 2009, most of them tenant actions. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 18 active DOB violations, most of them for boiler filings under Local Law 62/91. The newest was issued December 1, 2024.
- DOB complaints
- 1 DOB complaint in the last 12 months. It was filed January 29, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 23 DOB complaints from 1999 through November 14, 2026. 26 DOB violations since 1993, 8 dismissed in DOB's records.
The building report
- The city's wording on the 13 other open violations this page lists without it.
- What each of the 7 city statuses here means, and how many of these carry it.
- How it compares with the 3,231 Bronx buildings with 20 to 49 apartments.
- All 3 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.