1684 Grand Concourse
Bronx, NY 10457
1684 Grand Concourse is a walk-up building with 79 apartments, built in 1923. It has 21 open violations, 14 of them Class C, immediately hazardous. The oldest open HPD violation was filed on September 1, 1998.
En español: 14 violaciones de Clase C abiertas (peligro inmediato) y 21 abiertas en total. La más antigua del HPD lleva 28 años abierta, desde el 1 de septiembre de 1998.
Open now, most hazardous first
- 14Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Vermin / Infestation.
- 5See the 5
Class B, hazardous, filed in the last 3 years
- 2See the 2
OATH/ECB summonses still active. Most often Construction.
1.8 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. No certification filed and no new Class C violation in the last 180 days.
Since November 16, 2023, certifications were filed on 31 Class C violations: 24 by the original certify-by date, 7 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works
The original certify-by dates on the 19 open HPD violations have all passed. The latest was June 29, 2026.
- Zoning district
- R8
- Lot area
- 19,000 sq ft
- Floor area
- 65,560 sq ft
- Tax lot (BBL)
- 2-02823-0036
- Neighborhood
- Mount Eden-Claremont
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 14 open most often Vermin / Infestation | ||
| Notice sent | 18681863 | ||
| § 27-2005 HMC: Properly repair or replace the broken or defective heavy duty lock assembly at front entrance door to building , section at south | |||
| Notice sent | 18681862 | ||
| § 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at range in the kitchen | |||
| Notice sent | 18363407 | ||
| § 27-2005 ADM CODE Provide wired mesh underneath skylight at bulkhead , 6th story, section '1686', at west | |||
| Fire Safety | Not complied with | 17764104 | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective building entrance door at lobby, 2nd story | |||
| Vermin / Infestation | Notice sent to tenant | 17764101 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | |||
| Certified late | 17764100 | ||
| § 27-2005 HMC: Properly repair or replace the broken or defective glass broken at upper window sash in the bathroom | |||
| Heat / Hot Water | Notice sent | 17639750 | |
| § 27-2033 ADM CODE Provide ready access to buildings heating system door locked at boiler room | |||
| Vermin / Infestation | Certified late | 17615762 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | |||
| Vermin / Infestation | Certified late | 17615761 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | |||
| Heat / Hot Water | Certified late | 17615759 | |
| § 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment | |||
| Certified late | 17575941 | ||
| § 27-2005 HMC: Properly repair or replace the broken or defective mortise lock and assembly at building entrance door , 1st story | |||
| Invalid certification | 17130189 | ||
| § 27-2005 ADM CODE Properly repair with similar material the broken or defective wired glass (broken) | |||
| Invalid certification | 17130188 | ||
| § 27-2005 HMC: Properly repair or replace the broken or defective latch at (south section) building entry door from street to vestibule | |||
| Invalid certification | 17130186 | ||
| § 27-2005 HMC: Properly repair or replace the broken or defective latch at building entry door (north section) from street to vestibule | |||
| In HPD's words. Apartment numbers are left out. | |||
| Class B | 5 open | ||
| Notice sent | 18910153 | ||
| Notice sent | 18767622 | ||
| Notice sent | 17835092 | ||
| Notice sent | 17085564 | ||
| Notice sent | 17085563 | ||
| OATH/ECB | 2 open most often Construction | ||
| Construction, Class 1 | Hearing pending | 35730910L | |
| Construction, Class 1 | Found in violation | 35681707H | |
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 14 on September 24, 2026 and 14 on November 8.
- HPD, by year
- From 2017 to 2026, HPD filed 204 violations and closed 166, all classes.
Year Filed Closed 2026 5 3 2025 39 36 2024 37 35 2023 20 36 2022 66 31 2021 13 1 2020 2 13 2019 18 3 2018 2 7 2017 2 1 - Energy benchmarking
- ENERGY STAR score 36 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed December 15, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
Hearings and penalties
- OATH hearings
- A hearing on a DOB summons is set for March 26, 2027.
- OATH/ECB summonses
- 6 DOB summonses here since January 1, 2019, with $8,125 in penalties imposed. 2 of them are still active, the same 2 listed under OATH/ECB.
- August 14, 2026, DOB: Failure to maintain building walls or appurtenances. Adjourned, $5,000 penalty imposed.
- July 27, 2024, DOB: Failure to maintain building walls or appurtenances. In violation, $625 penalty imposed.
- July 27, 2024, DOB: File certificate of correct other material containing material false statement. Dismissed.
The newest 3 of 6 summonses OATH lists here.
- Housing court
- 11 housing court cases here since 2005. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 9 active DOB violations, most of them for low-pressure boilers. The newest was issued July 24, 2024.
- DOB, all years
- 13 DOB complaints from 1995 through November 14, 2026. 11 DOB violations since 1994, 2 dismissed in DOB's records.
- DOB permits
- DOB NOW lists 4 work permits here, the newest issued May 21, 2026, for Plumbing work.
- Plumbing, issued May 21, 2026, expired October 22, 2026.
- Sidewalk Shed, issued April 16, 2025, expired April 16, 2026.
- Suspended Scaffold, issued November 14, 2024, expired December 16, 2024.
The newest 3 of 4 permits DOB NOW lists here.
- Boiler inspection
- Inspected July 11, 2025. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 7 other open violations this page lists without it.
- What each of the 7 city statuses here means, and how many of these carry it.
- How it compares with the 1,979 Bronx buildings with 50 to 99 apartments.
- All 4 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 6 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 2 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.