1879 Clinton Ave, Bronx
- Built
- 1937
- Floors
- 6
- Residential units
- 30
- Building type
- Elevator building
- Zoning district
- R7-1
- Lot area
- 7,424 sq ft
- Floor area
- 34,080 sq ft
- Last sale
- $1,970,000
En español: 6 violaciones abiertas. La más antigua del HPD lleva 12 años abierta, desde el 4 de mayo de 2014.
Open now
Since October 12, 2023, a certification was filed on 1 Class C violation, by the original certify-by date. How certification works
The original certify-by dates on the 6 open HPD violations run from June 26, 2025 to November 16, 2026. The report prints the date beside each one.
- OATH/ECB summonses
- 24 DOB and FDNY summonses here since January 1, 2019, with $53,062 in penalties imposed. 15 judgments docketed, the latest on April 30, 2024. A docketed judgment shows up in a title search.
- May 7, 2026, FDNY: Affidavits, design installation documents, and other documentation. Decided by default, $1,000 penalty imposed.
- November 15, 2023, DOB: Failure to maintain elevator or conveying system. In violation, $1,250 penalty imposed.
- April 1, 2023, DOB: Temporary construction equipment on site-expired permit. Dismissed.
The newest 3 of 24 summonses OATH lists here. The report lists all 24, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 6 active DOB violations, most of them for not benchmarking energy use. The newest was issued August 3, 2024.
- Housing court
- 8 housing court cases here since 2010, most of them tenant actions.
- DOB facade
- Rated Safe in the latest facade report, filed June 8, 2023 (inspection cycle 9). An earlier report in this cycle, filed January 23, 2023, rated it Unsafe. Reports in earlier inspection cycles rated it Unsafe in 2015.
- DOB permits
- DOB NOW lists 6 work permits here, the newest issued April 10, 2023, for Sidewalk Shed work.
- Sidewalk Shed, issued April 10, 2023, signed off.
- Supported Scaffold, issued April 1, 2022, signed off.
- Sidewalk Shed, issued April 1, 2022, signed off.
The newest 3 of 6 permits DOB NOW lists here. The report lists all 6, with job numbers and each job's estimated cost. What the report adds
- Energy benchmarking
- ENERGY STAR score 100 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected September 22, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed December 10, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- Tax exemption
- Has a 420-c tax exemption (DOF 2026/27 roll).
- HPD emergency repair order
- 1 completed HPD emergency repair order since October 12, 2023: a general construction order, opened November 22, 2023, awarded for $460.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class B | 6 open | |||
| Notice sent | 19254251 | |||
| Notice sent | 18493622 | AQUINAS APARTMENTS LP | ||
| Certified late | 18493619 | AQUINAS APARTMENTS LP | ||
| Certified late | 18493616 | AQUINAS APARTMENTS LP | ||
| Notice sent | 18047652 | |||
| Not complied with | 17878813 | |||
The full report on 1879 Clinton Ave, Bronx
- All 6 open violations, each with the city's own words and the date on its notice.
- What each of the 3 city statuses here means, and how many of these carry it.
- How it compares with the 3,231 Bronx buildings with 20 to 49 apartments.
- All 6 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 24 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.
Get the report on 1879 Clinton Ave, Bronx, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.