355 East 184th St, Bronx
- Built
- 1972
- Floors
- 9
- Residential units
- 111
- Building type
- Elevator building
- Zoning district
- R7-1
- Lot area
- 28,375 sq ft
- Floor area
- 120,000 sq ft
En español: 18 violaciones de Clase C abiertas (peligro inmediato) y 31 abiertas en total. La más antigua del HPD lleva 20 años abierta, desde el 17 de julio de 2006.
Open now, most hazardous first
- 18Get these certified
Class C, immediately hazardous. Most often Vermin / Infestation.
- 10See the 10
Class B, hazardous
- 3See the 3
OATH/ECB summonses still active. Most often Construction.
Certifications are being filed faster than new violations come in. 44 certifications filed against 5 new Class C in the last 180 days.
Since October 12, 2023, certifications were filed on 56 Class C violations: 52 by the original certify-by date, 4 after it. How certification works
The original certify-by dates on the 28 open HPD violations run from December 9, 2023 to October 22, 2026. The report prints the date beside each one.
- Open Class C, week by week
- 20 on September 24, 2026 and 18 on October 8.
- OATH hearings
- A hearing on a DOB summons is set for December 4, 2026.
- OATH/ECB summonses
- 30 DOB and FDNY summonses here since January 1, 2019, with $59,025 in penalties imposed. 3 of them are still active, the same 3 listed under OATH/ECB. 18 judgments docketed, the latest on July 31, 2026. A docketed judgment shows up in a title search.
- September 18, 2026, DOB: Failure to maintain elevator or conveying system. $625 penalty imposed.
- March 28, 2026, FDNY: Inspection and testing. In violation, $600 penalty imposed.
- March 28, 2026, FDNY: Inspection and testing. In violation, $600 penalty imposed.
The newest 3 of 30 summonses OATH lists here. The report lists all 30, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 5 active DOB violations. The newest was issued August 20, 2024.
- Housing court
- 24 housing court cases here since 2006.
- DOB complaints
- 1 DOB complaint in the 12 months to September 25, 2026. It was filed July 10, 2026.
- DOB facade
- Rated SWARMP in the latest facade report, filed October 1, 2026 (inspection cycle 9). 2 earlier reports in this cycle rated it Unsafe, the first filed July 24, 2024. Reports in earlier inspection cycles rated it SWARMP in 2007 and Safe in 2017. SWARMP means safe with a repair and maintenance program. Need this filed?
- DOB permits
- 2 DOB work permits in effect. The latest, for Suspended Scaffold work, was issued January 26, 2026.
- Suspended Scaffold, issued January 26, 2026, in effect until January 1, 2027.
- Sidewalk Shed, issued January 9, 2026, in effect until January 9, 2027.
- Suspended Scaffold, issued February 2, 2024, signed off.
The newest 3 of 5 permits DOB NOW lists here. The report lists all 5, with job numbers and each job's estimated cost. What the report adds
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- 3 boilers, all inspected in 2026, the latest on January 6. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed December 3, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Tax exemption
- Has a Mitchell-Lama tax exemption (DOF 2026/27 roll).
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 18 open most often Vermin / Infestation | |||
| Vermin / Infestation | Certified on time | 19137502 | BRONX PARK PHASE III PRESERVATION, LLC | |
| Vermin / Infestation | CIV14 mailed | 19137501 | BRONX PARK PHASE III PRESERVATION, LLC | |
| Vermin / Infestation | CIV14 mailed | 19137500 | BRONX PARK PHASE III PRESERVATION, LLC | |
| Fire Safety | No access to reinspect (first try) | 19129496 | BRONX PARK PHASE III PRESERVATION, LLC | |
| Vermin / Infestation | Notice sent to tenant | 18795276 | BRONX PARK PHASE III PRESERVATION, LLC | |
| Vermin / Infestation | No access to reinspect (first try) | 17979220 | ||
| Vermin / Infestation | No access to reinspect (first try) | 17979219 | ||
| Vermin / Infestation | Notice sent to tenant | 17852162 | ||
| Vermin / Infestation | Not complied with | 17365788 | ||
| Vermin / Infestation | Not complied with | 17365787 | ||
| The report lists all 18, each with the city's own words and the date on its notice. What the report adds | ||||
| Class B | 10 open | |||
| CIV14 mailed | 19183304 | |||
| Certified on time | 19129497 | BRONX PARK PHASE III PRESERVATION, LLC | ||
| Certified on time | 19129495 | BRONX PARK PHASE III PRESERVATION, LLC | ||
| Not complied with | 19048694 | BRONX PARK PHASE III PRESERVATION, LLC | ||
| Not complied with | 19048693 | BRONX PARK PHASE III PRESERVATION, LLC | ||
| Notice sent | 17979221 | |||
| Notice sent | 17852163 | |||
| Not complied with | 17846396 | |||
| Mold | Defect letter sent | 17935411 | ||
| No access to reinspect (first try) | 17532190 | |||
| OATH/ECB | 3 open most often Construction | |||
| Elevators, Class 2 | Hearing pending | 39204708N | ||
| Construction, Class 2 | Decided by default | 35726684K | BRONX PARK PHASE III PRESERVATION, LLC | |
| Construction, Class 1 | Found in violation | 35683714P | ||
The full report on 355 East 184th St, Bronx
- All 31 open violations, each with the city's own words and the date on its notice.
- What each of the 10 city statuses here means, and how many of these carry it.
- How it compares with the 463 Bronx buildings with 100 to 199 apartments.
- All 5 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 30 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 3 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 355 East 184th St, Bronx, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.