2084 Bronx Park East, Bronx
- Built
- 1929
- Floors
- 6
- Residential units
- 106
- Building type
- Elevator building
- Zoning district
- R7-1
- Lot area
- 28,350 sq ft
- Floor area
- 132,000 sq ft
En español: 24 violaciones de Clase C abiertas (peligro inmediato) y 63 abiertas en total. La más antigua del HPD lleva 6 años abierta, desde el 6 de septiembre de 2020.
Open now, most hazardous first
- 24Get these certified
Class C, immediately hazardous. Most often Lead Paint.
- 38See the 38
Class B, hazardous. Most often Lead Paint.
- 1See it
OATH/ECB summons still active
Certifications are being filed about as fast as new violations come in. 22 certifications filed and 20 new Class C in the last 180 days, neither far ahead.
Since October 12, 2023, certifications were filed on 46 Class C violations: 39 by the original certify-by date, 7 after it. How certification works
The original certify-by dates on the 62 open HPD violations run from July 23, 2024 to November 9, 2026. The report prints the date beside each one.
- Open Class C, week by week
- 28 on September 24, 2026 and 24 on October 8.
- OATH hearings
- A hearing on a DOB summons is set for November 6, 2026.
- OATH/ECB summonses
- 7 DOB and FDNY summonses here since January 1, 2019, with $8,672 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 2 judgments docketed, the latest on June 30, 2023. A docketed judgment shows up in a title search.
- September 2, 2026, DOB: Work without a permit. $2,500 penalty imposed.
- October 15, 2025, DOB: Failure to maintain elevator or conveying system. In violation, $1,250 penalty imposed.
- April 23, 2024, DOB: Failure to maintain elevator or conveying system. Resolved by stipulation, $310 penalty imposed.
The newest 3 of 7 summonses OATH lists here. The report lists all 7, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 29 active DOB violations. The newest was issued June 23, 2024.
- Housing court
- 17 housing court cases here since 2005, most of them tenant actions.
- DOB complaints
- 9 DOB complaints, 1 of them conversion complaint, in the 12 months to September 25, 2026. The newest was filed September 12, 2026.
- DOB facade
- Rated SWARMP in the latest facade report, filed February 15, 2023 (inspection cycle 9). Reports in earlier inspection cycles rated it Safe in 2016. SWARMP means safe with a repair and maintenance program. Need this filed?
- DOB permits
- DOB NOW lists 3 work permits here, the newest issued February 7, 2023, for Sidewalk Shed work.
- Sidewalk Shed, issued February 7, 2023, signed off.
- Supported Scaffold, issued April 12, 2022, signed off.
- General Construction, issued February 23, 2022, signed off.
- Energy benchmarking
- ENERGY STAR score 48 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected February 10, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed December 4, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 24 open most often Lead Paint | |||
| Fire Safety | No access to reinspect (first try) | 19129522 | 2084-86 BPE, LLC | |
| Lead Paint | Notice sent | 19133647 | 2084-86 BPE, LLC | |
| Lead Paint | Notice sent | 19133643 | 2084-86 BPE, LLC | |
| Vermin / Infestation | Notice sent to tenant | 19125649 | 2084-86 BPE, LLC | |
| Notice sent | 19125336 | 2084-86 BPE, LLC | ||
| Notice sent | 19125309 | 2084-86 BPE, LLC | ||
| Notice sent | 19125303 | 2084-86 BPE, LLC | ||
| Notice sent | 19125282 | 2084-86 BPE, LLC | ||
| Notice sent | 19121821 | 2084-86 BPE, LLC | ||
| Notice sent | 19121818 | 2084-86 BPE, LLC | ||
| The report lists all 24, each with the city's own words and the date on its notice. What the report adds | ||||
| Class B | 38 open most often Lead Paint | |||
| Fire Safety | Certified on time | 19229071 | ||
| Elevator | Notice sent | 19205914 | ||
| Elevator | Notice sent | 19205913 | ||
| Elevator | Notice sent | 19205912 | ||
| Elevator | Notice sent | 19205911 | ||
| Certified on time | 19129524 | 2084-86 BPE, LLC | ||
| Heat / Hot Water | CIV14 mailed | 19129521 | 2084-86 BPE, LLC | |
| Notice sent | 19125752 | 2084-86 BPE, LLC | ||
| Notice sent | 19125750 | 2084-86 BPE, LLC | ||
| Notice sent | 19125749 | 2084-86 BPE, LLC | ||
| The report lists all 38, each with the city's own words and the date on its notice. What the report adds | ||||
| OATH/ECB | 1 open | |||
| Construction, Class 1 | Hearing pending | 39202779L | ||
The full report on 2084 Bronx Park East, Bronx
- All 63 open violations, each with the city's own words and the date on its notice.
- What each of the 10 city statuses here means, and how many of these carry it.
- How it compares with the 463 Bronx buildings with 100 to 199 apartments.
- All 3 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 7 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 2084 Bronx Park East, Bronx, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.