Skip to content
ViolationScout45 open Class C, with nothing filed or new in the last 180 days.Your building
Buildings208 West 30 Street, ManhattanCurrent through

208 West 30th St

Manhattan, NY 10001

208 West 30th Street is an office building, built in 1924. It has 56 open violations, 45 of them Class C, immediately hazardous. The oldest open HPD violation was filed on July 5, 2016.

En español: 45 violaciones de Clase C abiertas (peligro inmediato) y 56 abiertas en total. La más antigua del HPD lleva 10 años abierta, desde el 5 de julio de 2016.

Open now, most hazardous first

  1. 45

    Class C, immediately hazardous, filed in the last 3 years. Most often Heat / Hot Water.

    176 open counting every year, the oldest since

    Get these certified
  2. 10

    Class B, hazardous, filed in the last 3 years

    See the 10
  3. 1

    OATH/ECB summons still active

    See it

75.0 open Class C per 10 apartments. Across the city: 0.7.

Open violations are sitting, with little movement either way. No certification filed and no new Class C violation in the last 180 days.

Since November 27, 2023, certifications were filed on 17 Class C violations, all 17 by the original certify-by date. HPD now marks 1 of them Invalid Certification. How certification works

The original certify-by dates on the 55 open HPD violations have all passed. The latest was February 16, 2025.

Zoning district
M1-9A/R12
Lot area
6,814 sq ft
Floor area
77,556 sq ft
Tax lot (BBL)
1-00779-0049
Neighborhood
Midtown South-Flatiron-Union Square

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumber
Class C45 open most often Heat / Hot Water
Heat / Hot WaterNotice sent17666021
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Heat / Hot WaterNotice sent17666020
§ 27-2029 ADM CODE Provide an adequate supply of heat for the apartment in the entire apartment
Notice sent17666018
§ 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at range in the kitchen
Heat / Hot WaterNotice sent17630660
§27-2005 (E) HMC: Provide written notice to the tenants at least twenty-four hours prior to essential service interruption by posting a notice in a prominent place within the public part of the building and on each floor of such building, where an owner must make a repair that may result in an interruption of essential services such as utilities(heat, hot water, gas, electricity, or elevator) that is expected to continue for more than two hours. Sample notice available at www.nyc.gov/hpd or as provided in this notice of violation. .. At public hall, 1st story
Notice sent17630659
§ 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at range in the kitchen
Heat / Hot WaterNotice sent17630658
§ 27-2033 ADM CODE Provide ready access to buildings heating system door locked at boiler room
Heat / Hot WaterNotice sent17630657
§ 27-2029 ADM CODE Provide an adequate supply of heat for the apartment in the entire apartment
Heat / Hot WaterNotice sent17630656
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Heat / Hot WaterNotice sent17615260
§ 27-2033 ADM CODE Provide ready access to buildings heating system boiler room door locked at boiler room
Notice sent17615259
§ 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at gas range in the kitchen
Heat / Hot WaterNotice sent17615258
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Heat / Hot WaterNotice sent17582697
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Heat / Hot WaterNotice sent17582696
§ 27-2029 ADM CODE Provide an adequate supply of heat for the apartment in the entire apartment
Fire SafetyNotice sent17421854
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges at second egress door in the 1st room from east
Heat / Hot WaterNotice sent17412731
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Notice sent17412730
§ 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at range in the kitchen
Heat / Hot WaterNotice sent17379203
§ 27-2033 ADM CODE Provide ready access to buildings heating system boiler room door locked at cellar
Heat / Hot WaterNotice sent17379202
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Heat / Hot WaterNotice sent17363839
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Notice sent17363838
§ 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at range in the kitchen
Fire SafetyTo be reinspected17371104
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges at fire door at north leading to public hall in the private hallway
Notice sent17351833
§ 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of key operated lock at fire egress door leading to public hall in the private hallway
Notice sent17351832
§ 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at range in the kitchen
Fire SafetyNotice sent17106911
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective latch set in the entrance
Heat / Hot WaterNotice sent17106910
§ 27-2033 ADM CODE Provide ready access to buildings heating system door locked at basement at boiler room
Heat / Hot WaterNotice sent17106909
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Notice sent17106908
§ 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at range in the kitchen
Notice sent17084532
§ 27-2005 HMC: Properly repair or replace the broken or defective mortise lock and key set in the entrance
Heat / Hot WaterNot complied with17075218
§ 27-2033 ADM CODE Provide ready access to buildings heating system door locked at boiler room
Notice sent17075217
§ 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures cooking range in the kitchen
Heat / Hot WaterNotice sent17075216
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Heat / Hot WaterNotice sent17033996
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Heat / Hot WaterInvalid certification17033993
§ 27-2033 ADM CODE Provide ready access to buildings heating system door locked at boiler room
Notice sent17033992
§ 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at range in the kitchen
Notice sent17012757
§ 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at range in the kitchen
Heat / Hot WaterNotice sent16681325
§ 27-2033 ADM CODE Provide ready access to buildings heating system door locked at boiler room
Heat / Hot WaterNotice sent16681324
§ 27-2029 ADM CODE Provide an adequate supply of heat for the apartment in the entire apartment
Heat / Hot WaterNotice sent16681323
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Notice sent16657328
§ 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at gas range in the kitchen
Heat / Hot WaterNotice sent16542498
§ 27-2033 ADM CODE Provide ready access to buildings heating system locked door at boiler room
Heat / Hot WaterNotice sent16542497
§ 27-2029 ADM CODE Provide an adequate supply of heat for the apartment in the entire apartment
Heat / Hot WaterNotice sent16542496
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Heat / Hot WaterNotice sent16485082
§ 27-2033 ADM CODE Provide ready access to buildings heating system locked door at boiler room at basement
Heat / Hot WaterNotice sent16485081
§ 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment
Heat / Hot WaterNotice sent16485080
§ 27-2029 ADM CODE Provide an adequate supply of heat for the apartment in the entire apartment
In HPD's words. Apartment numbers are left out.
Class B10 open
Notice sent17412733
Notice sent17412732
Heat / Hot WaterNotice sent17387708
Notice sent17387707
Notice sent17379206
Notice sent17363841
Notice sent17084531
Notice sent17084530
Notice sent17033995
Notice sent16542499
OATH/ECB1 open
Construction, Class 2Found in violation35675559Y
Is this your building?Also for tenants and buyers
Is this your building?

We read every request ourselves. If we know a firm that handles this kind of work, we'll tell you who, and we only share your details if you say yes.

Your details stay with us. We share them with a firm only if you say yes. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See what's in the report first

Or file it yourself: what it can hold up, and how correction is filed

The building report reads this record for you: the city's wording on each open Class B violation filed in the last 3 years, what each status means, and how the building compares with others its size.

See what's in the report

HPD takes complaints from tenants through 311.

JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix

For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it

HPD and other city records

Open Class C, week by week
55 on September 24, 2026 and 48 on November 15.
HPD, by year
From 2018 to 2025, HPD filed 291 violations and closed 103, all classes.
YearFiledClosed
20252122
20247827
20236111
2022497
2021458
2020373
2018025
Energy benchmarking
ENERGY STAR score 96 for 2024, against a median of 78 for Office that year.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
Bedbug report
Filed December 1, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
Rent stabilization
Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.

Hearings and penalties

OATH/ECB summonses
100 DOB and FDNY summonses here since January 1, 2019, with $395,450 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 83 judgments docketed, the latest on November 24, 2026. A docketed judgment shows up in a title search.
  • August 3, 2026, FDNY: Inspection and testing. In violation, $300 penalty imposed.
  • August 3, 2026, FDNY: Inspection and testing. In violation, $300 penalty imposed.
  • July 29, 2026, FDNY: Inspection and testing. Adjourned.

The newest 3 of 100 summonses OATH lists here.

Housing court
30 housing court cases here since 2005. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.

DOB records

DOB violations
27 active DOB violations. The newest was issued June 23, 2024.
DOB complaints
1 DOB complaint in the last 12 months, a conversion complaint. It was filed August 10, 2026. A conversion complaint, like any complaint, is only a report to DOB. DOB inspects and decides whether there is a violation.
DOB, all years
149 DOB complaints through November 25, 2026. 124 DOB violations since 1988, 53 resolved and 44 dismissed in DOB's records.
DOB facade
No Report Filed for inspection cycle 9. Reports in earlier inspection cycles rated it Safe with a repair and maintenance program (SWARMP) in 2018.
Boiler inspection
Inspected October 16, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.

The building report

The cover of the sample report, a real Brooklyn building with apartment numbers removed.Page 3 of the sample report, What is open, for the same building.

Get the report, $19 See a sample report

You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is heat and hot water.

Nearby buildings

Questions about this building

Does 208 West 30th St have open violations?

Yes. It had 56 open violations on November 25, 2026: 55 from HPD and 1 from OATH/ECB. 45 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 10 years, since July 5, 2016.

Is this building getting better or worse?

Open violations are sitting, with little movement either way. 45 open Class C, with nothing filed or new in the last 180 days. The 180 days run to November 25, 2026.

Everything on this page comes from the city records listed below. A violation closed after the date at the top may still show as open here. If something is wrong, ask for a correction.

Sources. HPD housing violations and OATH/ECB hearing results, plus the neighborhood from HPD and DOB records, OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Open violation counts cover the last 3 years: HPD Class B and C violations still open, and OATH/ECB summonses still active. The city's own pages can show more.

Cite this page

ViolationScout, 208 West 30th St, Manhattan: 6 units, 45 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through November 25, 2026. https://violationscout.com/building/208-west-30-street-manhattan

How we count: /method.

Is this your building?