2158 Aqueduct Avenue East
Bronx, NY 10453
2158 Aqueduct Avenue East is an elevator building with 26 apartments, built in 2023. It has 14 open violations, 11 of them Class C, immediately hazardous. The oldest open HPD violation was filed on December 20, 2024.
En español: 11 violaciones de Clase C abiertas (peligro inmediato) y 14 abiertas en total. La más antigua del HPD lleva 22 meses abierta, desde el 20 de diciembre de 2024.
Open now, most hazardous first
- 11Get these certified
Class C, immediately hazardous, filed in the last 3 years
- 3See the 3
Class B, hazardous, filed in the last 3 years
4.2 open Class C per 10 apartments. Across the city: 0.7.
Certifications are being filed at least twice as fast as new violations come in. 14 certifications filed against 0 new Class C in the last 180 days.
Since November 16, 2023, certifications were filed on 51 Class C violations, all 51 by the original certify-by date. HPD now marks 2 of them False Certification and 2 Invalid Certification. How certification works
The original certify-by dates on the 14 open HPD violations have all passed. The latest was August 17, 2026.
- Zoning district
- R7-1
- Lot area
- 3,267 sq ft
- Floor area
- 17,017 sq ft
- Last sale
- $1,450,000
- Tax lot (BBL)
- 2-03207-0007
- Neighborhood
- University Heights-Morris Heights
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 11 open | ||
| Vermin / Infestation | False certification | 18773943 | |
| 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. Evidence found at observed live rats | |||
| Vermin / Infestation | False certification | 18741837 | |
| 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. Evidence found at all yards throughout | |||
| Heat / Hot Water | Invalid certification | 18519108 | |
| § 27-2029 ADM CODE Provide an adequate supply of heat for the apartment in the entire apartment | |||
| Heat / Hot Water | Notice sent | 18320464 | |
| § 27-2024 ADM CODE Provide adequate supply of hot water for the fixtures at bathroom and kitchen in the entire apartment | |||
| Notice sent | 18320463 | ||
| § 27-2024 ADM CODE Provide adequate supply of cold water for the fixtures at kitchen and bathroom in the entire apartment | |||
| Fire Safety | Not complied with | 18275335 | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective frame at building entrance door , 1st story | |||
| Invalid certification | 18235686 | ||
| § 27-2037, 2038 HMC: Provide a safe and adequate supply of electric service to the fixtures .. In the entire apartment | |||
| Vermin / Infestation | Not complied with | 18097168 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | |||
| Vermin / Infestation | Not complied with | 18097167 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | |||
| Heat / Hot Water | Notice sent | 17568100 | |
| § 27-2033 ADM CODE Provide ready access to buildings heating system door locked at boiler room | |||
| Heat / Hot Water | Notice sent | 17568099 | |
| § 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment | |||
| In HPD's words. Apartment numbers are left out. | |||
| Class B | 3 open | ||
| False certification | 19036499 | ||
| Not complied with | 18097170 | ||
| Not complied with | 18097169 | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 11 on September 24, 2026 and 11 on November 8.
- HPD, by year
- From 2024 to 2026, HPD filed 90 violations and closed 75, all classes.
Year Filed Closed 2026 32 49 2025 55 25 2024 3 1 - Bedbug report
- Filed December 15, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- Tax exemption
- Has a 421-a tax exemption (DOF 2026/27 roll). DOF lists its start year as 2024.
Hearings and penalties
- OATH/ECB summonses
- 14 DOB and FDNY summonses here since January 1, 2019, with $22,550 in penalties imposed. 8 judgments docketed, the latest on November 13, 2026. A docketed judgment shows up in a title search.
- June 8, 2026, DOB: Alt changed building occupied without valid certificate of occupancy per 28-118.3.1-28-118.3.2. In violation, $2,500 penalty imposed.
- April 16, 2026, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms. In violation, $935 penalty imposed.
- December 23, 2025, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms. In violation, $935 penalty imposed.
The newest 3 of 14 summonses OATH lists here.
- DOF tax lien sale
- Listed for DOF's 2025 tax lien sale. The last list it appeared on was the 10-day notice of May 2025.
- Housing court
- 3 housing court cases here since 2025. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB complaints
- 1 DOB complaint in the last 12 months. It was filed May 19, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 12 DOB complaints from 2022 through November 14, 2026.
- DOB permits
- DOB NOW lists 11 work permits here, the newest issued November 26, 2024, for Mechanical Systems work.
- Mechanical Systems, issued November 26, 2024, signed off.
- General Construction, issued November 13, 2024, expired July 19, 2025.
- Earth Work, issued August 22, 2023, signed off.
The newest 3 of 11 permits DOB NOW lists here.
The building report
- The city's wording on the 3 other open violations this page lists without it.
- What each of the 4 city statuses here means, and how many of these carry it.
- How it compares with the 3,231 Bronx buildings with 20 to 49 apartments.
- All 11 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 14 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.