Skip to content
ViolationScout51 certifications filed against 3 new Class C in the last 180 days.Is this your building?
Buildings50 West 182 Street, BronxCurrent through

50 West 182nd St, Bronx

BBL 2-03207-0056

En español: 18 violaciones de Clase C abiertas (peligro inmediato) y 37 abiertas en total.

Certifications are being filed faster than new violations come in. 51 certifications filed against 3 new Class C in the last 180 days.

Since September 28, 2023, certifications were filed on 57 Class C violations: 54 by the original certify-by date, 3 after it. HPD now marks 1 of them False Certification and 1 Invalid Certification. How certification works

Is this your building?

18 open Class C.

We read every request ourselves. When a compliance firm we work with can take the building, we introduce you to that one firm. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: which violations matter, and how long this kind usually takes to clear. It is not on sale yet.

See what the report covers

HPD takes complaints from tenants through 311.

OATH hearings
2 hearings scheduled on DOB summonses, the first on November 6, 2026.
DOB violations
12 active DOB violations, most of them for the annual elevator inspection. The newest was issued January 6, 2021.
DOB complaints
4 DOB complaints in the last 12 months. The newest was filed August 17, 2026.
DOB permits
1 DOB work permit in effect, for General Construction work, issued September 18, 2026.
Energy benchmarking
ENERGY STAR score 89 for 2024, against a median of 67 for Multifamily Housing that year.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Rent stabilization
Has rent-stabilized apartments (2024 registration).
HPD emergency repair order
1 completed HPD emergency repair order since September 28, 2023: a general construction order, opened December 19, 2024, awarded for $2,190.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C18 open most often Vermin / Infestation
Certified on time19138868MOTTO CAPITAL LLC
Vermin / InfestationFalse certification18978192MOTTO CAPITAL LLC
Fire SafetyInvalid certification18913970MOTTO CAPITAL LLC
Notice sent18711588MOTTO CAPITAL LLC
Notice sent18711585MOTTO CAPITAL LLC
Heat / Hot WaterNot complied with18698305MOTTO CAPITAL LLC
Notice sent18652992MOTTO CAPITAL LLC
Vermin / InfestationNot complied with18441980MOTTO CAPITAL LLC
Heat / Hot WaterNot complied with18286337MOTTO CAPITAL LLC
Heat / Hot WaterNot complied with18242705
Not complied with18172501
Vermin / InfestationDefect letter sent17855134
Vermin / InfestationNot complied with17546181
No access to reinspect (first try)17242092
Vermin / InfestationNo access to reinspect (first try)17242088
Vermin / InfestationNo access to reinspect (first try)17242087
Vermin / InfestationNot complied with17242018
Vermin / InfestationNo access to reinspect (first try)17170268
Class B16 open most often Mold
Invalid certification19047236MOTTO CAPITAL LLC
MoldNotice sent to tenant19055404MOTTO CAPITAL LLC
False certification18978200MOTTO CAPITAL LLC
False certification18978195MOTTO CAPITAL LLC
False certification18978191MOTTO CAPITAL LLC
Not complied with18773507MOTTO CAPITAL LLC
MoldCIV14 mailed19124298MOTTO CAPITAL LLC
MoldCIV14 mailed19079262MOTTO CAPITAL LLC
Not complied with18286338MOTTO CAPITAL LLC
Not complied with18172496
Not complied with18172492
Not complied with18131446
No access to reinspect (first try)17242091
Not complied with16965599
Not complied with16965598
Not complied with16965597
OATH/ECB3 open most often Elevators
Elevators, Class 1Hearing pending39202740Y
Elevators, Class 1Hearing pending39195668XMOTTO CAPITAL LLC
Elevators, Class 1Hearing pending39181413RMOTTO CAPITAL LLC

The most common category among the open records here is vermin and pests.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 50 West 182 Street, Bronx have open violations?

Yes. 50 West 182 Street, Bronx had 37 open violations on September 26, 2026: 3 from OATH/ECB and 34 from HPD. 18 are Class C, the class HPD treats as immediately hazardous.

Is 50 West 182 Street, Bronx getting better or worse?

Certifications are being filed faster than new violations come in. 51 certifications filed against 3 new Class C in the last 180 days. That window ends September 26, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 50 West 182 Street, Bronx?

Since September 28, 2023, certifications were filed on 57 Class C violations: 54 by the original certify-by date, 3 after it. HPD now marks 1 of them False Certification and 1 Invalid Certification. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 50 West 182 Street, Bronx have an OATH hearing coming up?

Yes. 2 hearings scheduled on DOB summonses, the first on November 6, 2026. DOB summonses are heard at OATH, the city's hearings office, and OATH can move a hearing to a later date. When nobody shows up, the summons is decided by default, the costliest way one ends.

Does 50 West 182 Street, Bronx have active DOB violations?

Yes. 12 active DOB violations, most of them for the annual elevator inspection. The newest was issued January 6, 2021. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has DOB received complaints about 50 West 182 Street, Bronx?

Yes. 4 DOB complaints in the last 12 months. The newest was filed August 17, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

Are any HPD emergency repair orders at 50 West 182 Street, Bronx marked completed?

Yes. 1 completed HPD emergency repair order since September 28, 2023: a general construction order, opened December 19, 2024, awarded for $2,190. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

Are any DOB work permits in effect at 50 West 182 Street, Bronx?

Yes. 1 DOB work permit in effect, for General Construction work, issued September 18, 2026. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

What is the ENERGY STAR score for 50 West 182 Street, Bronx?

ENERGY STAR score 89 for 2024, against a median of 67 for Multifamily Housing that year. Buildings over 25,000 square feet report their energy use to the city every year under Local Law 84. The ENERGY STAR score runs from 1 to 100 and compares a building with similar ones nationwide; 50 is the national median. The score is the one the city publishes, and this page never estimates a Local Law 97 emissions penalty. A lot that reported several properties in one year is not scored here.

Is 50 West 182 Street, Bronx covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 50 West 182 Street, Bronx rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 50 West 182 Street, Bronx built?

The city's record gives 1935 as the year 50 West 182 Street, Bronx was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator apartment building with 6 floors.

How many apartments does 50 West 182 Street, Bronx have?

The Department of City Planning's PLUTO tax-lot file lists 30 residential units at 50 West 182 Street, Bronx. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH hearing dates, DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB NOW work permits, HPD emergency repair orders, Local Law 84 energy reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 26, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH hearing dates, DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB NOW work permits, HPD emergency repair orders, Local Law 84 energy reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 50 West 182nd St, Bronx: 18 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 26, 2026. https://violationscout.com/building/50-west-182-street-bronx

How we count: /method.

Is this your building?