254 Stockholm St
Bushwick, Brooklyn, NY 11237
254 Stockholm Street is a walk-up building with 8 apartments, built in 1931. It has 48 open violations, 18 of them Class C, immediately hazardous. The oldest open HPD violation was filed on May 21, 1987.
En español: 18 violaciones de Clase C abiertas (peligro inmediato) y 48 abiertas en total. La más antigua del HPD lleva 39 años abierta, desde el 21 de mayo de 1987.
Open now, most hazardous first
- 18Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Vermin / Infestation.
- 27See the 27
Class B, hazardous, filed in the last 3 years. Most often Fire Safety.
- 3See the 3
OATH/ECB summonses still active. Most often Construction.
22.5 open Class C per 10 apartments. Across the city: 0.7.
Certifications are being filed at least twice as fast as new violations come in. 32 certifications filed against 7 new Class C in the last 180 days.
Since November 16, 2023, certifications were filed on 4 Class C violations, all 4 after the original certify-by date. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works
The original certify-by dates on the 45 open HPD violations run from November 5, 2024 to December 1, 2026.
- Zoning district
- R6
- Lot area
- 2,500 sq ft
- Floor area
- 7,000 sq ft
- Tax lot (BBL)
- 3-03258-0027
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 18 open most often Vermin / Infestation | |||
| Lead Paint | Defect letter sent | 19158598 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) west wall in the kitchen | ||||
| Certified late | 19147106 | |||
| § 27-2005 HMC: Properly repair or replace the broken or defective lower window sash glass pane broken at first window from east at south wall in the kitchen | ||||
| Certified late | 19147103 | |||
| § 27-2026, 2027 HMC: Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom | ||||
| Notice sent | 19078210 | |||
| § 27-2005 HMC: Properly repair or replace the broken or defective lower window sash glass pane at the east wall in the kitchen | ||||
| Notice sent | 19078207 | |||
| § 27-2005 ADM CODE Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen | ||||
| Vermin / Infestation | Certified late | 19078205 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Vermin / Infestation | Certified late | 19078204 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Notice sent | 18794343 | |||
| § 27-2026, 2027 HMC: Properly repair the source and abate the evidence of a water leak at the ceiling ceiling in the bathroom | ||||
| Notice sent | 18517916 | |||
| § 27-2026, 2027 HMC: Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen | ||||
| Vermin / Infestation | Notice sent to tenant | 18517915 | ||
| 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. Evidence found at , in the entire apartment | ||||
| Vermin / Infestation | Notice sent to tenant | 18517914 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Notice sent | 18192372 | |||
| § 27-2005 ADM CODE Properly repair with similar material the broken or defective east and west walls at public hall, 1st story | ||||
| Notice sent | 18192369 | |||
| § 27-2026, 2027 HMC: Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom | ||||
| Notice sent | 18192365 | |||
| § 27-2005 ADM CODE Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroom | ||||
| Notice sent | 18192362 | |||
| § 27-2026, 2027 HMC: Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen | ||||
| Notice sent | 18192361 | |||
| § 27-2005 ADM CODE Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen | ||||
| Vermin / Infestation | Notice sent to tenant | 18192360 | ||
| 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. Evidence found at rats in kitchen and bathroom in the entire apartment | ||||
| Notice sent | 17370393 | |||
| § 27-2005 HMC: Properly repair or replace the broken or defective glass at entrace door to building | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 27 open most often Fire Safety | |||
| Notice sent | 19290382 | GREAT HILLS REALTY CORP | ||
| False certification | 19152732 | |||
| Fire Safety | False certification | 19078220 | ||
| Fire Safety | False certification | 19078219 | ||
| False certification | 19078218 | |||
| False certification | 19078216 | |||
| False certification | 19078215 | |||
| False certification | 19078214 | |||
| False certification | 19078211 | |||
| False certification | 19078208 | |||
| Certified late | 18794357 | |||
| Certified late | 18794356 | |||
| Certified late | 18794355 | |||
| Certified late | 18794354 | |||
| Certified late | 18794346 | |||
| Notice sent | 18517918 | |||
| Notice sent | 18517917 | |||
| Notice sent | 18517913 | |||
| Notice sent | 18517911 | |||
| Notice sent | 18517910 | |||
| Notice sent | 18517909 | |||
| Notice sent | 18192370 | |||
| Notice sent | 18192368 | |||
| Notice sent | 18192367 | |||
| Notice sent | 18192366 | |||
| Notice sent | 18192364 | |||
| Notice sent | 18192363 | |||
| OATH/ECB | 3 open most often Construction | |||
| Construction, Class 2 | Decided by default | 39196271M | ||
| Construction, Class 1 | Decided by default | 39190894L | ||
| Construction, Class 1 | Decided by default | 39150109K | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 18 on September 24, 2026 and 18 on November 8.
- HPD, by year
- From 2017 to 2026, HPD filed 296 violations and closed 293, all classes.
Year Filed Closed 2026 51 22 2025 25 7 2024 2 2 2023 4 0 2022 4 70 2021 5 5 2020 16 10 2019 66 48 2018 25 61 2017 98 68 - Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- HPD emergency repair orders
- 2 completed HPD emergency repair orders since November 16, 2023, awarded for $4,605 in total. The most recent of the 2, a lead paint order, was opened June 30, 2026. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- OATH/ECB summonses
- 3 DOB summonses here since January 1, 2019, with $26,280 in penalties imposed. All 3 are still active, the same 3 listed under OATH/ECB. 2 judgments docketed, the latest on October 19, 2026. A docketed judgment shows up in a title search.
- July 15, 2026, DOB: Fail to comply with commissioner order to file certificate of correction with DOB. Decided by default, $1,280 penalty imposed.
- June 2, 2026, DOB: Failure to maintain per BC1008.1.8; 27-371; BC1008.1.9;BC1010.1.8;BC1010.1.9. Decided by default, $12,500 penalty imposed.
- June 5, 2025, DOB: Failure to maintain building in code-compliant manner. Decided by default, $12,500 penalty imposed.
- DOF tax lien sale
- Listed for DOF's 2025 tax lien sale. The last list it appeared on was the 10-day notice of May 2025.
- Housing court
- 1 open housing court case, opened January 27, 2022. 9 housing court cases here since 2007. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 1 active DOB violation, issued December 29, 1995.
- DOB complaints
- 2 DOB complaints in the last 12 months. The newest was filed July 9, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 11 DOB complaints from 1995 through November 14, 2026. 3 DOB violations since 1991, 2 dismissed in DOB's records.
- Boiler inspection
- Inspected December 5, 2025. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 30 other open violations this page lists without it.
- What each of the 6 city statuses here means, and how many of these carry it.
- How it compares with the 19,339 Brooklyn buildings with 6 to 19 apartments.
- All 3 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 3 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.