1 St Pauls Ct, Brooklyn
- Built
- 1931
- Floors
- 6
- Residential units
- 65
- Building type
- Elevator building
- Zoning district
- R7A
- Lot area
- 21,316 sq ft
- Floor area
- 91,770 sq ft
En español: 49 violaciones de Clase C abiertas (peligro inmediato) y 118 abiertas en total. La más antigua del HPD lleva 14 años abierta, desde el 28 de abril de 2012.
Open now, most hazardous first
- 49Get these certified
Class C, immediately hazardous. Most often Lead Paint.
- 68See the 68
Class B, hazardous. Most often Mold.
- 1See it
OATH/ECB summons still active
Certifications are being filed about as fast as new violations come in. 33 certifications filed and 24 new Class C in the last 180 days, neither far ahead.
Since October 12, 2023, certifications were filed on 37 Class C violations: 34 by the original certify-by date, 3 after it. HPD now marks 3 of them False Certification. How certification works
The original certify-by dates on the 117 open HPD violations run from January 31, 2024 to November 25, 2026. The report prints the date beside each one.
- Open Class C, week by week
- 47 on September 24, 2026 and 49 on October 8.
- OATH/ECB summonses
- 4 DOB and FDNY summonses here since January 1, 2019, with $4,050 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 4 judgments docketed, the latest on August 31, 2026. A docketed judgment shows up in a title search.
- November 18, 2025, FDNY: Affidavits, design installation documents, and other documentation. In violation, $300 penalty imposed.
- February 17, 2025, DOB: Failure to maintain building in code-compliant manner. In violation, $1,250 penalty imposed.
- January 6, 2023, DOB: Failure to maintain elevator or conveying system. In violation, $1,250 penalty imposed.
The newest 3 of 4 summonses OATH lists here. The report lists all 4, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 1 active DOB violation, issued September 23, 2024.
- Housing court
- 20 housing court cases here since 2006.
- DOB complaints
- 1 DOB complaint in the 12 months to September 25, 2026. It was filed September 26, 2025.
- DOB permits
- DOB NOW lists 5 work permits here, the newest issued June 7, 2022, for Supported Scaffold work.
- Supported Scaffold, issued June 7, 2022, signed off.
- General Construction, issued June 7, 2022, signed off.
- Sidewalk Shed, issued August 19, 2021, signed off.
The newest 3 of 5 permits DOB NOW lists here. The report lists all 5, with job numbers and each job's estimated cost. What the report adds
- Energy benchmarking
- ENERGY STAR score 92 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected January 19, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed December 16, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair order
- 1 completed HPD emergency repair order since October 12, 2023: a general construction order, opened May 3, 2024, awarded for $6,500.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 49 open most often Lead Paint | |||
| Notice sent | 19278373 | |||
| Notice sent | 19278372 | |||
| Lead Paint | Notice sent | 19234533 | ||
| Lead Paint | Notice sent | 19234532 | ||
| Lead Paint | Notice sent | 19234531 | ||
| Lead Paint | Notice sent | 19234530 | ||
| Lead Paint | Notice sent | 19234529 | ||
| Lead Paint | Notice sent | 19234528 | ||
| Lead Paint | Notice sent | 19234527 | ||
| Lead Paint | Notice sent | 19234526 | ||
| The report lists all 49, each with the city's own words and the date on its notice. What the report adds | ||||
| Class B | 68 open most often Mold | |||
| Notice sent | 19278371 | |||
| Notice sent | 19278370 | |||
| Notice sent | 19278366 | |||
| Notice sent | 19278365 | |||
| Notice sent | 19225765 | |||
| Notice sent | 19225764 | |||
| Certified on time | 19225763 | |||
| Notice sent | 19225761 | |||
| CIV14 mailed | 19225759 | |||
| Notice sent | 19225757 | |||
| The report lists all 68, each with the city's own words and the date on its notice. What the report adds | ||||
| OATH/ECB | 1 open | |||
| Construction, Class 2 | Found in violation | 39138628K | ||
The full report on 1 St Pauls Ct, Brooklyn
- All 118 open violations, each with the city's own words and the date on its notice.
- What each of the 9 city statuses here means, and how many of these carry it.
- How it compares with the 1,827 Brooklyn buildings with 50 to 99 apartments.
- All 5 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 4 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 1 St Pauls Ct, Brooklyn, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.