Skip to content
ViolationScout12 certifications filed and 8 new Class C in the last 180 days, neither far ahead.Is this your building?
Buildings400 Ft Washington Avenue, ManhattanCurrent through

400 Ft Washington Ave, Manhattan

BBL 1-02176-0009

En español: 10 violaciones de Clase C abiertas (peligro inmediato) y 33 abiertas en total.

Certifications are being filed about as fast as new violations come in. 12 certifications filed and 8 new Class C in the last 180 days, neither far ahead.

Since September 28, 2023, certifications were filed on 6 Class C violations: 3 by the original certify-by date, 3 after it. How certification works

Is this your building?

10 open Class C.

We read every request ourselves. When a compliance firm we work with can take the building, we introduce you to that one firm. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: which violations matter, and how long this kind usually takes to clear. It is not on sale yet.

See what the report covers

HPD takes complaints from tenants through 311.

OATH hearings
5 hearings scheduled on DOB summonses, the first on November 19, 2026.
DOB violations
11 active DOB violations. The newest was issued April 2, 2026.
DOB complaints
5 DOB complaints in the last 12 months. The newest was filed September 15, 2026.
DOB facade
Rated Unsafe in the latest facade report, filed September 11, 2026 (inspection cycle 9). Need this filed?
DOB permits
1 DOB work permit in effect, for Sidewalk Shed work, issued January 2, 2026.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Rent stabilization
Has rent-stabilized apartments (2024 registration).
HPD emergency repair order
1 completed HPD emergency repair order since September 28, 2023: a general construction order, opened June 12, 2024, awarded for $345.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C10 open most often Fire Safety
Lead PaintNotice sent19165590400 FORT WASHINGTON AVE LLC
Lead PaintPostponement granted19159077400 FORT WASHINGTON AVE LLC
Fire SafetyNot complied with19158692400 FORT WASHINGTON AVE LLC
Vermin / InfestationTo be reinspected19158678400 FORT WASHINGTON AVE LLC
Fire SafetyCertified late19151251400 FORT WASHINGTON AVE LLC
Fire SafetyNot complied with19142512400 FORT WASHINGTON AVE LLC
Fire SafetyCertified late19142251400 FORT WASHINGTON AVE LLC
Fire SafetyCertified late19142237400 FORT WASHINGTON AVE LLC
Vermin / InfestationNot complied with16879350
Vermin / InfestationNot complied with16879348
Class B14 open most often Fire Safety
Invalid certification19142998400 FORT WASHINGTON AVE LLC
Fire SafetyInvalid certification19142977400 FORT WASHINGTON AVE LLC
Fire SafetyInvalid certification19142974400 FORT WASHINGTON AVE LLC
Fire SafetyInvalid certification19142523400 FORT WASHINGTON AVE LLC
Fire SafetyInvalid certification19142515400 FORT WASHINGTON AVE LLC
Certified on time19142253400 FORT WASHINGTON AVE LLC
Certified on time19142239400 FORT WASHINGTON AVE LLC
Not complied with18281336
Fire SafetyNot complied with18085797
Fire SafetyNot complied with18085796
Fire SafetyNot complied with17402503
Fire SafetyNot complied with17402502
Not complied with16879354
Not complied with16879353
OATH/ECB9 open most often Construction
Construction, Class 2Hearing pending39559214X
Construction, Class 2Hearing pending39559056J
Construction, Class 1Hearing pending35717824Z400 FORT WASHINGTON AVE LLC
Construction, Class 2Decided by default39191591Z400 FORT WASHINGTON AVE LLC
Construction, Class 2Hearing pending35726422K400 FORT WASHINGTON AVE LLC
Construction, Class 1Hearing pending35726421Z400 FORT WASHINGTON AVE LLC
Class 2Decided by default39551478N400 FORT WASHINGTON AVE LLC
Construction, Class 2Found in violation39543060X
Elevators, Class 1Found in violation39112434R

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 400 Ft Washington Avenue, Manhattan have open violations?

Yes. 400 Ft Washington Avenue, Manhattan had 33 open violations on September 26, 2026: 9 from OATH/ECB and 24 from HPD. 10 are Class C, the class HPD treats as immediately hazardous.

Is 400 Ft Washington Avenue, Manhattan getting better or worse?

Certifications are being filed about as fast as new violations come in. 12 certifications filed and 8 new Class C in the last 180 days, neither far ahead. That window ends September 26, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 400 Ft Washington Avenue, Manhattan?

Since September 28, 2023, certifications were filed on 6 Class C violations: 3 by the original certify-by date, 3 after it. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 400 Ft Washington Avenue, Manhattan have an OATH hearing coming up?

Yes. 5 hearings scheduled on DOB summonses, the first on November 19, 2026. DOB summonses are heard at OATH, the city's hearings office, and OATH can move a hearing to a later date. When nobody shows up, the summons is decided by default, the costliest way one ends.

Does 400 Ft Washington Avenue, Manhattan have active DOB violations?

Yes. 11 active DOB violations. The newest was issued April 2, 2026. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has DOB received complaints about 400 Ft Washington Avenue, Manhattan?

Yes. 5 DOB complaints in the last 12 months. The newest was filed September 15, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

Are any HPD emergency repair orders at 400 Ft Washington Avenue, Manhattan marked completed?

Yes. 1 completed HPD emergency repair order since September 28, 2023: a general construction order, opened June 12, 2024, awarded for $345. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

What did the latest facade report find at 400 Ft Washington Avenue, Manhattan?

Rated Unsafe in the latest facade report, filed September 11, 2026 (inspection cycle 9). Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

Are any DOB work permits in effect at 400 Ft Washington Avenue, Manhattan?

Yes. 1 DOB work permit in effect, for Sidewalk Shed work, issued January 2, 2026. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

Is 400 Ft Washington Avenue, Manhattan covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 400 Ft Washington Avenue, Manhattan rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 400 Ft Washington Avenue, Manhattan built?

The city's record gives 1924 as the year 400 Ft Washington Avenue, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator apartment building with 6 floors.

How many apartments does 400 Ft Washington Avenue, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 39 residential units at 400 Ft Washington Avenue, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH hearing dates, DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 26, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH hearing dates, DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 400 Ft Washington…, Manhattan: violations, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 26, 2026. https://violationscout.com/building/400-ft-washington-avenue-manhattan

How we count: /method.

Is this your building?