680 8th Ave
Manhattan, NY 10036
680 8th Avenue is an elevator building with 652 apartments, built in 1920. It has 19 open violations, 9 of them Class C, immediately hazardous. The oldest open HPD violation was filed on July 14, 2019.
En español: 9 violaciones de Clase C abiertas (peligro inmediato) y 19 abiertas en total. La más antigua del HPD lleva 7 años abierta, desde el 14 de julio de 2019.
Open now, most hazardous first
- 9Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Vermin / Infestation.
- 10See the 10
Class B, hazardous, filed in the last 3 years. Most often Mold.
0.1 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. 2 certifications filed and 4 new Class C in the last 180 days, too few to call a direction.
Since November 27, 2023, certifications were filed on 37 Class C violations: 30 by the original certify-by date, 7 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works
The original certify-by dates on the 19 open HPD violations run from February 4, 2024 to December 7, 2026.
- Zoning district
- C6-5
- Lot area
- 17,575 sq ft
- Floor area
- 211,466 sq ft
- Tax lot (BBL)
- 1-01015-0001
- Neighborhood
- Midtown-Times Square
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 9 open most often Vermin / Infestation | |||
| Fire Safety | Certified late | 19031147 | ||
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges in the entrance | ||||
| Vermin / Infestation | Notice sent to tenant | 19021500 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | Notice sent to tenant | 19005409 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the 1st room from north | ||||
| Vermin / Infestation | Notice sent to tenant | 19005408 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the 1st room from east | ||||
| Vermin / Infestation | Not complied with | 17831687 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the 1st room from north | ||||
| Vermin / Infestation | Not complied with | 17831686 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the 1st room from north | ||||
| Fire Safety | No access to reinspect (first try) | 17168854 | ||
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges in the 1st entrance from east | ||||
| Vermin / Infestation | Not complied with | 16779655 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches | ||||
| Vermin / Infestation | Not complied with | 16562798 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches at public hall, 2nd story | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 10 open most often Mold | |||
| Notice sent | 19298356 | BREAKING GROUND HDFC | ||
| Notice sent | 19298355 | BREAKING GROUND HDFC | ||
| Notice sent | 19298352 | BREAKING GROUND HDFC | ||
| Fire Safety | Notice sent | 19021928 | ||
| Fire Safety | Notice sent | 19021927 | ||
| Mold | Notice sent to tenant | 18989351 | ||
| Notice sent | 18618059 | |||
| Mold | Defect letter sent | 17693348 | ||
| No access to reinspect (first try) | 17168853 | |||
| Mold | Defect letter sent | 16826300 | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 18 on September 24, 2026 and 9 on November 15.
- HPD, by year
- From 2017 to 2026, HPD filed 691 violations and closed 659, all classes.
Year Filed Closed 2026 46 142 2025 124 174 2024 60 33 2023 136 108 2022 49 28 2021 111 27 2020 14 3 2019 72 69 2018 35 22 2017 44 53 - Energy benchmarking
- ENERGY STAR score 65 for 2025, against a median of 69 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed December 2, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- Tax exemption
- Has a 420-c tax exemption (DOF 2026/27 roll).
- HPD emergency repair orders
- 2 completed HPD emergency repair orders since November 27, 2023, awarded for $821 in total. The most recent of the 2, a general construction order, was opened March 16, 2026. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- OATH/ECB summonses
- 37 DOB and FDNY summonses here since January 1, 2019, with $52,162 in penalties imposed. 20 judgments docketed, the latest on September 30, 2026. A docketed judgment shows up in a title search.
- October 9, 2026, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms.
- July 7, 2026, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms.
- July 3, 2026, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms. In violation.
The newest 3 of 37 summonses OATH lists here.
- Housing court
- 1 open housing court case, opened October 23, 2025. 11 housing court cases here since 2014, most of them tenant actions. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 2 active DOB violations. The newest was issued December 1, 2023.
- DOB complaints
- 14 DOB complaints in the last 12 months. The newest was filed November 22, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 224 DOB complaints through November 25, 2026. 103 DOB violations since 1988, 50 resolved and 51 dismissed in DOB's records.
- DOB permits
- DOB NOW lists 7 work permits here, the newest issued January 14, 2025, for Mechanical Systems work.
- Mechanical Systems, issued January 14, 2025, signed off.
- General Construction, issued October 15, 2024, signed off.
- General Construction, issued June 14, 2024, signed off.
The newest 3 of 7 permits DOB NOW lists here.
- Boiler inspection
- 2 boilers, both inspected in 2026, the latest on August 6. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 10 other open violations this page lists without it.
- What each of the 6 city statuses here means, and how many of these carry it.
- How it compares with the 799 Manhattan buildings with 200 or more apartments.
- All 7 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 37 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.