Skip to content
ViolationScout77 certifications filed against 14 new Class C in the last 180 days.Your building
Buildings2090 1 Avenue, ManhattanCurrent through

2090 1st Ave, Manhattan

BBL 1-01701-0001

Built
1974
Floors
31
Residential units
1,594
Building type
Elevator building
Zoning district
R7-2
Lot area
519,220 sq ft
Floor area
2,046,455 sq ft

En español: 39 violaciones de Clase C abiertas (peligro inmediato) y 119 abiertas en total. La más antigua del HPD lleva 43 años abierta, desde el 20 de junio de 1983.

Open now, most hazardous first

  1. 39

    Class C, immediately hazardous. Most often Vermin / Infestation.

    74 open counting every year, the oldest since

    Get these certified
  2. 74

    Class B, hazardous. Most often Fire Safety.

    See the 74
  3. 6

    OATH/ECB summonses still active. Most often Local Law.

    See the 6

Certifications are being filed faster than new violations come in. 77 certifications filed against 14 new Class C in the last 180 days.

Since October 12, 2023, certifications were filed on 62 Class C violations: 26 by the original certify-by date, 36 after it. HPD now marks 2 of them False Certification. How certification works

The original certify-by dates on the 113 open HPD violations run from January 1, 2024 to November 9, 2026. The report prints the date beside each one.

Is this your building?

39 open Class C, an OATH hearing on October 29, 2026, and 4 buildings DOB lists as No Report Filed for inspection cycle 9. The oldest open HPD violation was filed June 20, 1983.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

Open Class C, week by week
39 on September 24, 2026 and 39 on October 8.
OATH hearings
A hearing on a DOB summons is set for October 29, 2026.
OATH/ECB summonses
132 DOB and FDNY summonses here since January 1, 2019, with $120,114 in penalties imposed. 6 of them are still active, the same 6 listed under OATH/ECB. 69 judgments docketed, the latest on September 30, 2026. A docketed judgment shows up in a title search.
  • September 24, 2026, FDNY: Fire protection systems.
  • September 24, 2026, FDNY: Certificates of fitness and certificates of qualification.
  • September 17, 2026, FDNY: Recordkeeping.

The newest 3 of 132 summonses OATH lists here. The report lists all 132, with each outcome, the penalty imposed and any docketing date. What the report adds

DOB violations
51 active DOB violations. The newest was issued September 23, 2024.
Housing court
1 open housing court case, opened March 20, 2026. 59 housing court cases here since 2005, most of them tenant actions.
DOB complaints
8 DOB complaints in the 12 months to September 25, 2026. The newest was filed August 25, 2026.
DOB facade
DOB lists No Report Filed for 4 buildings on this lot in inspection cycle 9. Need this filed?
DOB permits
DOB NOW lists 22 work permits here, the newest issued June 17, 2025, for Suspended Scaffold work.
  • Suspended Scaffold, issued June 17, 2025, signed off.
  • Sidewalk Shed, issued February 28, 2024, signed off.
  • Sidewalk Shed, issued January 25, 2024, expired January 25, 2025.

The newest 3 of 22 permits DOB NOW lists here. The report lists all 22, with job numbers and each job's estimated cost. What the report adds

Local Law 97
On the covered list (DOB's list, March 1, 2026).
Boiler inspection
6 boilers, all inspected in 2025, the latest on October 10. Boilers in buildings with 6 or more apartments are inspected every calendar year. Need this filed?
Bedbug report
Filed for its 4 buildings by December 12, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Tax exemption
Has a Mitchell-Lama tax exemption (DOF 2026/27 roll).
HPD emergency repair order
1 completed HPD emergency repair order since October 12, 2023: a general construction order, opened February 1, 2024, awarded for $334.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C39 open most often Vermin / Infestation
Notice sent19224296
Vermin / InfestationNotice sent to tenant191793011199 HOUSING CROP
Notice sent191060211199 HOUSING CROP
Notice sent191060031199 HOUSING CROP
Vermin / InfestationInvalid certification189403661199 HOUSING CROP
Fire SafetyCertified late189393301199 HOUSING CROP
Fire SafetyCertified late189261251199 HOUSING CROP
Fire SafetyCertified late189261211199 HOUSING CROP
Fire SafetyCertified late188987741199 HOUSING CROP
Fire SafetyCertified late188987621199 HOUSING CROP
The report lists all 39, each with the city's own words and the date on its notice. What the report adds
Class B74 open most often Fire Safety
Notice sent19224295
Notice sent19224293
Notice sent19195839
Fire SafetyNotice sent191793001199 HOUSING CROP
Fire SafetyNotice sent191792991199 HOUSING CROP
Notice sent191792981199 HOUSING CROP
Notice sent191631551199 HOUSING CROP
Certified late190639951199 HOUSING CROP
Notice sent190273641199 HOUSING CROP
Notice sent190273631199 HOUSING CROP
The report lists all 74, each with the city's own words and the date on its notice. What the report adds
OATH/ECB6 open most often Local Law
Construction, Class 1Hearing pending39194813Z1199 HOUSING CROP
Local Law, Class 2Found in violation37034678J
Local Law, Class 2Found in violation37034677H
Local Law, Class 2Found in violation37034676X
Local Law, Class 2Found in violation37034675Y
Construction, Class 1Found in violation35675321Y

The full report on 2090 1st Ave, Manhattan

Get the report on 2090 1st Ave, Manhattan, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Nearby buildings

Questions about this building

Does 2090 1 Avenue, Manhattan have open violations?

Yes. 2090 1 Avenue, Manhattan had 119 open violations on October 10, 2026: 113 from HPD and 6 from OATH/ECB. 39 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 43 years, since June 20, 1983.

Is 2090 1 Avenue, Manhattan getting better or worse?

Certifications are being filed faster than new violations come in. 77 certifications filed against 14 new Class C in the last 180 days. That window ends October 10, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 2090 1 Avenue, Manhattan?

Since October 12, 2023, certifications were filed on 62 Class C violations: 26 by the original certify-by date, 36 after it. HPD now marks 2 of them False Certification. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 2090 1 Avenue, Manhattan have an OATH hearing coming up?

Yes. A hearing on a DOB summons is set for October 29, 2026. DOB summonses are heard at OATH, the city's hearings office, and OATH can move a hearing to a later date. When nobody shows up, the summons is decided by default, the costliest way one ends.

Does 2090 1 Avenue, Manhattan have active DOB violations?

Yes. 51 active DOB violations. The newest was issued September 23, 2024. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Is 2090 1 Avenue, Manhattan in housing court?

Yes. 1 open housing court case, opened March 20, 2026. 59 housing court cases here since 2005, most of them tenant actions. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Has DOB received complaints about 2090 1 Avenue, Manhattan?

Yes. 8 DOB complaints in the 12 months to September 25, 2026. The newest was filed August 25, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

Are any HPD emergency repair orders at 2090 1 Avenue, Manhattan marked completed?

Yes. 1 completed HPD emergency repair order since October 12, 2023: a general construction order, opened February 1, 2024, awarded for $334. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

What did the latest facade reports find at 2090 1 Avenue, Manhattan?

DOB lists No Report Filed for 4 buildings on this lot in inspection cycle 9. Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

When was the boiler at 2090 1 Avenue, Manhattan last inspected?

It has 6 boilers, all inspected in 2025, the latest on October 10. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 2090 1 Avenue, Manhattan last file its bedbug report?

Its 4 buildings had all filed by December 12, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 2090 1 Avenue, Manhattan covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. On the covered list (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Does 2090 1 Avenue, Manhattan have a property tax exemption?

The building has a Mitchell-Lama tax exemption on DOF's 2026/27 roll. An exemption lowers a property's tax bill by reducing its assessed value.

When was 2090 1 Avenue, Manhattan built?

The city's record gives 1974 as the year 2090 1 Avenue, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator building with 31 floors.

How many apartments does 2090 1 Avenue, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 1,594 residential units at 2090 1 Avenue, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH hearing dates, OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, DOF's exemption rolls, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH hearing dates, OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, DOF's exemption rolls, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 2090 1st Ave, Manhattan: 1,594 units, 39 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/2090-1-avenue-manhattan

How we count: /method.

Is this your building?