516 West 156th St, Manhattan
- Built
- 1952
- Floors
- 5
- Residential units
- 22
- Building type
- Walk-up building
- Zoning district
- R7-2
- Lot area
- 4,996 sq ft
- Floor area
- 17,780 sq ft
- Last transfer
- No price recorded
En español: 17 violaciones de Clase C abiertas (peligro inmediato) y 66 abiertas en total. La más antigua del HPD lleva 14 años abierta, desde el 4 de octubre de 2012.
Open now, most hazardous first
- 17Get these certified
Class C, immediately hazardous. Most often Heat / Hot Water.
- 49See the 49
Class B, hazardous. Most often Fire Safety.
Certifications are being filed faster than new violations come in. 58 certifications filed against 7 new Class C in the last 180 days.
Since October 12, 2023, certifications were filed on 63 Class C violations: 62 by the original certify-by date, 1 after it. HPD now marks 2 of them False Certification and 1 Invalid Certification. How certification works
The original certify-by dates on the 66 open HPD violations run from February 26, 2025 to November 2, 2026. The report prints the date beside each one.
- Open Class C, week by week
- 18 on September 24, 2026 and 17 on October 8.
- OATH/ECB summonses
- 1 FDNY summons here since January 1, 2019.
- March 2, 2020, FDNY: Permits. In violation.
- Housing court
- 16 housing court cases here since 2009.
- DOB permits
- 2 DOB work permits in effect. The latest, for Plumbing work, was issued September 8, 2026.
- Plumbing, issued September 8, 2026, in effect until November 2, 2026.
- General Construction, issued June 29, 2026, in effect until December 31, 2026.
- Boiler inspection
- Inspected December 11, 2025. Boilers in buildings with 6 or more apartments are inspected every calendar year. Need this filed?
- Bedbug report
- Filed December 18, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 17 open most often Heat / Hot Water | |||
| Fire Safety | Not complied with | 19213510 | ||
| Certified on time | 19213509 | |||
| Certified on time | 19213508 | |||
| Notice sent | 19108413 | WEST 156 HOLDING LLC | ||
| Invalid certification | 18975332 | WEST 156 HOLDING LLC | ||
| Notice sent | 18975322 | WEST 156 HOLDING LLC | ||
| Vermin / Infestation | Notice sent to tenant | 18975213 | WEST 156 HOLDING LLC | |
| Heat / Hot Water | Notice sent | 18636267 | WEST 156 HOLDING LLC | |
| Heat / Hot Water | Notice sent | 18572227 | WEST 156 HOLDING LLC | |
| Fire Safety | Notice sent | 18323746 | ||
| The report lists all 17, each with the city's own words and the date on its notice. What the report adds | ||||
| Class B | 49 open most often Fire Safety | |||
| Fire Safety | Notice sent | 19213516 | ||
| Fire Safety | Notice sent | 19213515 | ||
| Notice sent | 19213514 | |||
| Notice sent | 19213513 | |||
| Notice sent | 19213512 | |||
| Notice sent | 19213511 | |||
| Notice sent | 19126330 | WEST 156 HOLDING LLC | ||
| Certified on time | 19108421 | WEST 156 HOLDING LLC | ||
| Certified on time | 19108420 | WEST 156 HOLDING LLC | ||
| Certified on time | 19108419 | WEST 156 HOLDING LLC | ||
| The report lists all 49, each with the city's own words and the date on its notice. What the report adds | ||||
The full report on 516 West 156th St, Manhattan
- All 66 open violations, each with the city's own words and the date on its notice.
- What each of the 8 city statuses here means, and how many of these carry it.
- How it compares with the 6,545 Manhattan buildings with 20 to 49 apartments.
- All 2 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 1 FDNY summons at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.
Get the report on 516 West 156th St, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.